[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-862829":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},862829,555,1,"单选题","总包单位项目技术负责人（ ）应对分包单位的进场进行安全技术总交底。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","安全总监",false,{"key":16,"text":17,"correct":14},"B","安全员",{"key":19,"text":20,"correct":14},"C","施工员",{"key":22,"text":23,"correct":24},"D","项目工程技术人员",true,"",{"id":6,"name":27,"category":28,"favorite":29},"江苏省A证（企业负责人）","建筑工程",0]