[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-862486":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},862486,555,1,"单选题","建设单位应当自开工报告批准之日起（ ）天内，将保证安全施工的措施报送建设工程所在地的县级以上人民政府建设行政主管部门或者其他有关部门备案。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":18},"B","15",true,{"key":20,"text":21,"correct":14},"C","20",{"key":23,"text":24,"correct":14},"D","30","建设单位在申请领取施工许可证时，应当提供建设工程有关安全施工措施的资料。依法批准开工报告的建设工程，建设单位应当自开工报告批准之日起15日内，将保证安全施工的措施报送建设工程所在地的县级以上地方人民政府建设行政主管部门或者其他有关部门备案。",{"id":6,"name":27,"category":28,"favorite":29},"江苏省A证（企业负责人）","建筑工程",0]