[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-862392":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},862392,554,3,"判断题","根据《施工现场临时用电安全技术规范》规定，当施工现场与外电线路共用同一供电系统时，一部分电气设备作保护接零，另一部分设备作保护接地。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"B证（项目管理人员）","建筑工程",0]