[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-862037":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},862037,554,2,"多选题","脚手架专项施工方案经企业技术负责人审批签字盖章后方可实施。下列（ ）属于脚手架专项施工方案应包括主要内容。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","基础处理",true,{"key":16,"text":17,"correct":14},"B","搭设要求",{"key":19,"text":20,"correct":14},"C","杆件间距",{"key":22,"text":23,"correct":14},"D","连墙件拉结点设置",{"key":25,"text":26,"correct":14},"E","设计计算书","ABCDE","",{"id":6,"name":30,"category":31,"favorite":32},"B证（项目管理人员）","建筑工程",0]