[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-861773":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},861773,554,1,"单选题","建设工程施工前，施工单位负责项目管理的（）应当对有关安全施工措施的技术要求向施工作业班组、作业人员作出详细说明，并由双方签字确认。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目经理",false,{"key":16,"text":17,"correct":18},"B","技术人员",true,{"key":20,"text":21,"correct":14},"C","值班人员",{"key":23,"text":24,"correct":14},"D","考核人员","",{"id":6,"name":27,"category":28,"favorite":29},"B证（项目管理人员）","建筑工程",0]