[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-861770":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},861770,554,1,"单选题","工程中涉及深基坑、地下暗挖工程、高大模板工程的专项施工方案，施工单位还应当组织（）进行论证、审查。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","企业负责人",false,{"key":16,"text":17,"correct":14},"B","项目负责人",{"key":19,"text":20,"correct":14},"C","安全负责人",{"key":22,"text":23,"correct":24},"D","专家",true,"",{"id":6,"name":27,"category":28,"favorite":29},"B证（项目管理人员）","建筑工程",0]