[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-553-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":535},{"id":5,"name":6,"category":7,"favorite":8},553,"B证（项目负责人）","建筑工程",0,22,50,1420,[13,34,44,50,62,68,80,92,110,122,134,146,158,164,176,182,196,202,208,219,225,237,252,258,270,282,288,300,310,316,328,340,355,370,382,388,394,400,415,429,440,452,460,469,481,493,499,513,523,529],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},861292,1,"单选题","施工单位、（）和建设行政主管部门及其监督机构应当对高大模板支撑系统实施监督管理。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","建设单位",false,{"key":24,"text":25,"correct":22},"B","设计单位",{"key":27,"text":28,"correct":29},"C","监理单位",true,{"key":31,"text":32,"correct":22},"D","招投标代理机构","",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":43,"analysis":33},861293,3,"判断题","某建筑工地将基坑开挖的土方堆放在离基坑10米以外的砖砌围墙边,围墙的外侧是一所小学校操场,且土方堆放高于围墙,一场大雨过后的一天,小学生课余在操场上活动中,突然围墙倒塌,将正在围墙边玩耍的4名小朋友压死在围墙底下,针对该类事故,我们应从中吸取教训。 基坑工程开挖出的土方应根据建设方指定位置堆放。（）",[40,42],{"key":20,"text":41,"correct":22},"正确",{"key":24,"text":43,"correct":29},"错误",{"id":45,"libraryId":5,"type":36,"typeLabel":37,"stem":46,"options":47,"answer":41,"analysis":33},861294,"浇筑高度2m及其以上的混凝土结构构件时，应设置脚手架或操作平台。（）",[48,49],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":51,"libraryId":5,"type":15,"typeLabel":16,"stem":52,"options":53,"answer":27,"analysis":33},861295,"移动电气设备时，必须经（）切断电源并做出妥善处理后进行。",[54,56,58,60],{"key":20,"text":55,"correct":22},"维修工",{"key":24,"text":57,"correct":22},"施工用电管理员",{"key":27,"text":59,"correct":29},"电工",{"key":31,"text":61,"correct":22},"电气工程技术员",{"id":63,"libraryId":5,"type":36,"typeLabel":37,"stem":64,"options":65,"answer":43,"analysis":33},861296,"模板支撑的架体，其水平杆与立杆连接作用的扣件必须采用扭矩扳手对其进行抽检，其扭矩值必须达到20～35N.m。（）",[66,67],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":29},{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":20,"analysis":33},861297,"《建设工程施工现场消防安全技术规范》规定：既有建筑进行扩建、改建施工时，外脚手架搭设长度不应超过该建筑物外立面周长的（）。",[72,74,76,78],{"key":20,"text":73,"correct":29},"1\u002F2",{"key":24,"text":75,"correct":22},"2\u002F3",{"key":27,"text":77,"correct":22},"1\u002F3",{"key":31,"text":79,"correct":22},"3\u002F4",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":20,"analysis":33},861298,"工程施工（）在基坑工程开挖深度达到国家建设部《危险性较大的分部分项工程安全管理办法》规定的标准时,应当长驻施工现场,随时处置施工过程中的安全隐患和安全技术问题。",[84,86,88,90],{"key":20,"text":85,"correct":29},"总承包单位的总工程师和项目技术负责人",{"key":24,"text":87,"correct":22},"专业承包单位的技术负责人",{"key":27,"text":89,"correct":22},"专业承包单位的项目负责人",{"key":31,"text":91,"correct":22},"以上三者",{"id":93,"libraryId":5,"type":94,"typeLabel":95,"stem":96,"options":97,"answer":109,"analysis":33},861299,2,"多选题","施工单位对脚手架工程实行分包的要审查分包单位哪些内容（）。",[98,100,102,104,106],{"key":20,"text":99,"correct":29},"资质等级证书、营业执照、安全生产许可证",{"key":24,"text":101,"correct":29},"审查主要管理人员的资格证书、专业分包项目负责人安全生产考核合格证书、专职安全生产管理人员安全生产考核合格证书",{"key":27,"text":103,"correct":29},"审查架子工的上岗证书，并进行人证对照，做到人证相符",{"key":31,"text":105,"correct":29},"审查安全生产管理机构的设置情况",{"key":107,"text":108,"correct":22},"E","施工人员的身体状况","ABCD",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":27,"analysis":33},861300,"建筑起重机械使用单位在建筑起重机械安装验收合格之日起（）日内，向工程所在地县级以上地方人民政府建设行政主管部门办理使用登记。",[114,116,118,120],{"key":20,"text":115,"correct":22},"10",{"key":24,"text":117,"correct":22},"15",{"key":27,"text":119,"correct":29},"30",{"key":31,"text":121,"correct":22},"60",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":27,"analysis":33},861301,"某公司承建的培训中心项目，局部层高达8.2m，为保证该处高支模体系的安全施工，项目部编制了高大模板支撑体系专项施工方案，并按规定要求对方案进行了审核，但未组织专家论证。2010年10月21日，项目经理安排了木工班组搭设该处高支模，并于3天后开始混凝土的浇筑，绕筑过程中发生坍塌事故，导致2人死亡。针对此类事故，请结合所学知识，回答以下问题： 高大模板支撑系统应由（）进行搭设。",[126,128,130,132],{"key":20,"text":127,"correct":22},"技术工人",{"key":24,"text":129,"correct":22},"木工",{"key":27,"text":131,"correct":29},"经培训并取得建筑施工脚手架特种作业操作资格证书人员",{"key":31,"text":133,"correct":22},"模板制作工",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":31,"analysis":33},861302,"2014年4月13日5时38分许，某工程有限公司桥梁施工工地，一台通用门式起重机发生倾覆，伤及无辜，造成2人死亡，3人受伤，事故发生后，该企业领导第二天才向主管部门汇报，属迟报行为，经查操作工系无证操作，停机后没有将夹轨器放下并夹紧轨道.在风力作用下，起重机沿轨道撞击止档出轨遇到阻碍，整机向前倾覆。根据案例回答问题： 对建筑起重机械的租赁，安装拆卸，使用依法实施监督管理的部门是（）。",[138,140,142,144],{"key":20,"text":139,"correct":22},"质量技术监督管理部门",{"key":24,"text":141,"correct":22},"安全生产监督管理部门",{"key":27,"text":143,"correct":22},"使用单位",{"key":31,"text":145,"correct":29},"建设行政主管部门",{"id":147,"libraryId":5,"type":15,"typeLabel":16,"stem":148,"options":149,"answer":24,"analysis":33},861303,"遇有（）级以上大风气候时，应当停止高空和露天焊割作业。",[150,152,154,156],{"key":20,"text":151,"correct":22},"4",{"key":24,"text":153,"correct":29},"5",{"key":27,"text":155,"correct":22},"6",{"key":31,"text":157,"correct":22},"7",{"id":159,"libraryId":5,"type":36,"typeLabel":37,"stem":160,"options":161,"answer":43,"analysis":33},861304,"某公司承建的培训中心项目，局部层高达8.2m，为保证该处高支模体系的安全施工，项目部编制了高大模板支撑体系专项施工方案，并按规定要求对方案进行了审核，但未组织专家论证。2010年10月21日，项目经理安排了木工班组搭设该处高支模，并于3天后开始混凝土的浇筑，绕筑过程中发生坍塌事故，导致2人死亡。针对此类事故，请结合所学知识，回答以下问题： 建设单位对高大模板支撑系统的搭设、拆除及混凝土浇筑实施巡查，发现安全隐患应当责令整改。（）",[162,163],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":29},{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":27,"analysis":33},861305,"危险潮湿场所的照明及手持照明灯具,必须使用（）供电。",[168,170,172,174],{"key":20,"text":169,"correct":22},"安全开关",{"key":24,"text":171,"correct":22},"安全电源",{"key":27,"text":173,"correct":29},"安全电压",{"key":31,"text":175,"correct":22},"安全电流",{"id":177,"libraryId":5,"type":36,"typeLabel":37,"stem":178,"options":179,"answer":41,"analysis":33},861306,"消防安全重点单位应实行每日防火巡查，确定消防安全重点部位的安全，并建立巡查记录。（）",[180,181],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":183,"libraryId":5,"type":94,"typeLabel":95,"stem":184,"options":185,"answer":109,"analysis":33},861307,"高大模板支撑系统应在搭设完成后，由施工单位项目负责人组织验收。验收人员应包括（）。验收合格，经施工单位项目技术负责人及项目总监理工程师签字后，方可进人后续工序的施工。施工。",[186,188,190,192,194],{"key":20,"text":187,"correct":29},"施工单位和项目两级技术人员",{"key":24,"text":189,"correct":29},"项目安全、质量、施工人员",{"key":27,"text":191,"correct":29},"监理单位的总监理工程师",{"key":31,"text":193,"correct":29},"专业监理工程师",{"key":107,"text":195,"correct":22},"设计单位项目负责人",{"id":197,"libraryId":5,"type":36,"typeLabel":37,"stem":198,"options":199,"answer":43,"analysis":33},861308,"模板支撑系统应为独立的系统，禁止与物料提升机、施工升降机、塔吊等起重设备钢结构架体机身及其附着设施相连接;可以与施工脚手架、物料周转料平台等架体相连接。（）",[200,201],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":29},{"id":203,"libraryId":5,"type":36,"typeLabel":37,"stem":204,"options":205,"answer":43,"analysis":33},861309,"附着升降脚手架的每一作业层架体外侧不必设置上、下两道防护栏杆和挡脚板。（）",[206,207],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":29},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},861310,"《建筑起重机械备案登记办法》规定，安装单位应当在建筑起重机械安装（拆卸）前（）个工作日内通过书面形式、传真或者计算机信息系统告知工程所在地县级以上地方人民政府建设行政主管部门。",[212,214,216,218],{"key":20,"text":213,"correct":22},"1",{"key":24,"text":215,"correct":29},"2",{"key":27,"text":217,"correct":22},"3",{"key":31,"text":151,"correct":22},{"id":220,"libraryId":5,"type":36,"typeLabel":37,"stem":221,"options":222,"answer":41,"analysis":33},861311,"安装单位应当建立建筑起重机械安装、拆卸工程档案。（）",[223,224],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":27,"analysis":33},861312,"基坑挖土设计标高时,宜在其上部预留（），待下一工序开始前继续挖除。",[229,231,233,235],{"key":20,"text":230,"correct":22},"50MM～100MM",{"key":24,"text":232,"correct":22},"100MM～150MM",{"key":27,"text":234,"correct":29},"150MM～300MM",{"key":31,"text":236,"correct":22},"300MM～500MM",{"id":238,"libraryId":5,"type":94,"typeLabel":95,"stem":239,"options":240,"answer":251,"analysis":33},861313,"施工现场临时用电必须建立安全技术档案,应包括的内容有（）。",[241,243,245,247,249],{"key":20,"text":242,"correct":22},"用电施工组织设计的部分资料",{"key":24,"text":244,"correct":29},"用电工程检查验收表",{"key":27,"text":246,"correct":29},"定期检（复）查表",{"key":31,"text":248,"correct":29},"接地电阻、绝缘电阻等参数测定记录表",{"key":107,"text":250,"correct":29},"电工安装、巡检、维修、拆除工作记录。","BCDE",{"id":253,"libraryId":5,"type":36,"typeLabel":37,"stem":254,"options":255,"answer":41,"analysis":33},861314,"某市一个住宅楼工程由当地甲勘察设计单位按照要求进行勘察设计，并提供了满足需要的勘察设计文件，由乙监理单位担任工程的监理工作，由具有相应资质的丙单位负责现场大型设备的安拆工作，由丁单位为施工单位出租机械设备和施工机具，丁单位为施工单位出具了生产许可证和产品合格证，对出租的机械设备和施工机具及配件的安全性能进行了有效保险，限位等安全设施和装置，请回答下列问题： 丁单位为施工单位出租机械设备和施工机具，应当为施工单位出具了生产许可证和产品合格证。（）",[256,257],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":27,"analysis":33},861315,"根据《建设工程施工现场消防安全技术规范》规定，易燃易爆危险品库房与在建工程的防火间距不应小于（）m，其他临时用房、临时设施与在建工程的防火间距不应小于（）m。",[262,264,266,268],{"key":20,"text":263,"correct":22},"20，10",{"key":24,"text":265,"correct":22},"20，6",{"key":27,"text":267,"correct":29},"15，6",{"key":31,"text":269,"correct":22},"10，5",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":20,"analysis":33},861316,"SC型施工升降机出厂超过（）年，SS型施工升降机出厂超过（）年，必须进行安全评估和结构应力测试，合格的方可进行安装质量检验。",[274,276,278,280],{"key":20,"text":275,"correct":29},"8，5",{"key":24,"text":277,"correct":22},"5，8",{"key":27,"text":279,"correct":22},"5，10",{"key":31,"text":281,"correct":22},"10，8",{"id":283,"libraryId":5,"type":36,"typeLabel":37,"stem":284,"options":285,"answer":41,"analysis":33},861317,"作业人员应按规定佩戴安全带;安全带应挂设在单独设置的安全绳上,严禁安全绳与吊篮连接。（）",[286,287],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":20,"analysis":33},861318,"某建筑工地将基坑开挖的土方堆放在离基坑10米以外的砖砌围墙边,围墙的外侧是一所小学校操场,且土方堆放高于围墙,一场大雨过后的一天,小学生课余在操场上活动中,突然围墙倒塌,将正在围墙边玩耍的4名小朋友压死在围墙底下,针对该类事故,我们应从中吸取教训。 基坑工程必须实行监测，建设单位应当委托（）资质的工程勘察（岩土工程）或者基坑勘察设计专项单位承担监测任务。",[292,294,296,298],{"key":20,"text":293,"correct":29},"甲级",{"key":24,"text":295,"correct":22},"乙级",{"key":27,"text":297,"correct":22},"丙级",{"key":31,"text":299,"correct":22},"以上都可以",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":27,"analysis":33},861319,"当工程施工高度超过（）m时，应当配备有足够扬程的消防水源和必须保障畅通的疏散通道。",[304,305,307,308],{"key":20,"text":115,"correct":22},{"key":24,"text":306,"correct":22},"20",{"key":27,"text":119,"correct":29},{"key":31,"text":309,"correct":22},"40",{"id":311,"libraryId":5,"type":36,"typeLabel":37,"stem":312,"options":313,"answer":41,"analysis":33},861320,"某市一个住宅楼工程由当地甲勘察设计单位按照要求进行勘察设计，并提供了满足需要的勘察设计文件，由乙监理单位担任工程的监理工作，由具有相应资质的丙单位负责现场大型设备的安拆工作，由丁单位为施工单位出租机械设备和施工机具，丁单位为施工单位出具了生产许可证和产品合格证，对出租的机械设备和施工机具及配件的安全性能进行了有效保险，限位等安全设施和装置，请回答下列问题： 丁单位对出租的机械设备和施工机具及配件的安全性能应进行检查，在签订租赁协议时，应出具检测报告。（）",[314,315],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":27,"analysis":33},861321,"基坑工程施工可能对相邻设施造成影响的，建设单位应当会同相邻设施的管理单位做好（）。",[320,322,324,326],{"key":20,"text":321,"correct":22},"勘查记录",{"key":24,"text":323,"correct":22},"施工记录",{"key":27,"text":325,"correct":29},"安全现状记录",{"key":31,"text":327,"correct":22},"隐蔽工程检查记录",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":31,"analysis":33},861322,"起重力矩为（）KN.M以上，出场年限超过18年的塔式起重机，必须进行安全评估和结构应力测试，合格的方可进行安装质量检验。",[332,334,336,338],{"key":20,"text":333,"correct":22},"400",{"key":24,"text":335,"correct":22},"630",{"key":27,"text":337,"correct":22},"1000",{"key":31,"text":339,"correct":29},"1250",{"id":341,"libraryId":5,"type":94,"typeLabel":95,"stem":342,"options":343,"answer":354,"analysis":33},861323,"超过一定规模的危险性较大的分部分项工程范围有哪些（）。",[344,346,348,350,352],{"key":20,"text":345,"correct":29},"开挖深度超过5M（含5M）的基坑（槽）的土方开挖、支护、降水工程",{"key":24,"text":347,"correct":22},"开挖深度超过3M（含3M）但地质条件和周边环境复杂的基坑（槽）支护、降水工程",{"key":27,"text":349,"correct":22},"开挖深度超过3M（含3M）的基坑（槽）的土方开挖工程",{"key":31,"text":351,"correct":22},"虽未超过3M但地质条件和周边环境复杂的基坑（槽）支护、降水工程",{"key":107,"text":353,"correct":29},"开挖深度虽未超过5M，但地质条件、周围环境和地下管线复杂，或影响毗邻建筑（构筑）物安全的基坑（槽）的土方开挖、支护、降水工程。","AE",{"id":356,"libraryId":5,"type":94,"typeLabel":95,"stem":357,"options":358,"answer":369,"analysis":33},861324,"《建筑施工钢管扣件脚手架安全技术规范》规定，在脚手架使用期间，严禁拆除下列（）杆件。",[359,361,363,365,367],{"key":20,"text":360,"correct":29},"主节点处的纵、横向水平杆",{"key":24,"text":362,"correct":29},"主节点处的纵、横向扫地杆",{"key":27,"text":364,"correct":29},"连墙件",{"key":31,"text":366,"correct":22},"抛撑",{"key":107,"text":368,"correct":22},"支节点处的纵、横向水平杆","ABC",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},861325,"某市一个住宅楼工程由当地甲勘察设计单位按照要求进行勘察设计，并提供了满足需要的勘察设计文件，由乙监理单位担任工程的监理工作，由具有相应资质的丙单位负责现场大型设备的安拆工作，由丁单位为施工单位出租机械设备和施工机具，丁单位为施工单位出具了生产许可证和产品合格证，对出租的机械设备和施工机具及配件的安全性能进行了有效保险，限位等安全设施和装置，请回答下列问题： 勘察应当按照法律，法规和（）进行勘察，提供的勘察文件应当真实，准确，满足建设工程安全生产的需要。",[374,376,378,380],{"key":20,"text":375,"correct":22},"制度",{"key":24,"text":377,"correct":29},"工程建设强制性标准",{"key":27,"text":379,"correct":22},"经验",{"key":31,"text":381,"correct":22},"规定",{"id":383,"libraryId":5,"type":36,"typeLabel":37,"stem":384,"options":385,"answer":43,"analysis":33},861326,"动火作业应办理动火许可证。动火许可证的签发人收到动火申请后，可电话确认动火作业的防火措施落实情况，然后再签发动火许可证。（）",[386,387],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":29},{"id":389,"libraryId":5,"type":36,"typeLabel":37,"stem":390,"options":391,"answer":43,"analysis":33},861327,"2015年2月，某市建筑安全监督站对辖区内一在建大型商场进行了安全生产检查，发现该工程模板工程及支撑体系、脚手架工程、土方开挖工程为危险较大的分部分项工程及超过一定规模的危险性较大的分部分项工程。施工单位对不需专家论证的施工方案，现场编制后直接报送监理单位，经总监审批后，现场按照该方案进行了实施。对需要进行专家论证的方案，该施工单位组织了专家论证会，专家组对方案提出了修改意见，施工单位按照论证意见进行了方案修改。在实施过程中，因现场情况发生了变化，施工单位对方案进行了调整，并按照调整的方案进行了施工。请根据背景资料，回答下列问题： 施工单位对不需专家论证的施工方案，编制后不需审核可以直接报送监理单位审批。（）",[392,393],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":29},{"id":395,"libraryId":5,"type":36,"typeLabel":37,"stem":396,"options":397,"answer":41,"analysis":33},861328,"脚手架工程施工单位必须具有相应的专业承包资质及安全生产许可证。（）",[398,399],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":401,"libraryId":5,"type":94,"typeLabel":95,"stem":402,"options":403,"answer":414,"analysis":33},861329,"下列有关在建工程临时疏散通道的防火要求，正确的是（）。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"临时疏散通道应具备与疏散要求相匹配的耐火性能，其耐火极限不应低于1.0H",{"key":24,"text":407,"correct":29},"设置在地面上的临时疏散通道，其净宽度不应小于1.5M",{"key":27,"text":409,"correct":29},"利用在建工程施工完毕的水平结构、楼梯作临时疏散通道，其净宽度不应小于1.0M",{"key":31,"text":411,"correct":29},"用于疏散的爬梯及设置在脚手架上的临时疏散通道，其净宽度不应小于0.6M",{"key":107,"text":413,"correct":22},"临时疏散通道为坡道，其坡度大于20°时，应修建楼梯或台阶踏步或设置防滑条","BCD",{"id":416,"libraryId":5,"type":94,"typeLabel":95,"stem":417,"options":418,"answer":109,"analysis":33},861330,"基坑工程专项施工方案应当（）。",[419,421,423,425,427],{"key":20,"text":420,"correct":29},"基坑侧壁选用的安全系数",{"key":24,"text":422,"correct":29},"护壁、支护结构的选型",{"key":27,"text":424,"correct":29},"地下水控制方法及验算",{"key":31,"text":426,"correct":29},"承载能力极限状态和正常状态的设计和验算",{"key":107,"text":428,"correct":22},"局部滑移稳定性验算",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},861331,"起重机械设备使用单位应当根据（），对建筑起重机械采取相应的安全防护措施。",[433,435,437,439],{"key":20,"text":434,"correct":22},"不同施工阶段",{"key":24,"text":436,"correct":22},"周围环境变化",{"key":27,"text":438,"correct":22},"季节、气候的变化",{"key":31,"text":91,"correct":29},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},861332,"移动式操作平台行走轮的承载力不应小于（）,行走轮制动器的制动力矩不应小于（）。",[444,446,448,450],{"key":20,"text":445,"correct":29},"5KN，2.5N·M",{"key":24,"text":447,"correct":22},"5KN，3.0N·M",{"key":27,"text":449,"correct":22},"10KN，2.5N·M",{"key":31,"text":451,"correct":22},"10KN，3.0N·M",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":24,"analysis":33},861333,"对膨胀土及冻土的基坑周边坡面和坡顶（）m以内应采取防水及防冻措施。",[456,457,458,459],{"key":20,"text":215,"correct":22},{"key":24,"text":217,"correct":29},{"key":27,"text":151,"correct":22},{"key":31,"text":153,"correct":22},{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},861334,"施工现场临时用电设备在5台及以上或设备总容量在（）kW及以上的，应编制用电组织设计。",[464,465,466,467],{"key":20,"text":306,"correct":22},{"key":24,"text":119,"correct":22},{"key":27,"text":309,"correct":22},{"key":31,"text":468,"correct":29},"50",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},861335,"单独设置的操作平台应设置供人上下、踏步间距不大于（）的扶梯。",[473,475,477,479],{"key":20,"text":474,"correct":22},"350MM",{"key":24,"text":476,"correct":29},"400MM",{"key":27,"text":478,"correct":22},"450MM",{"key":31,"text":480,"correct":22},"500MM",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":27,"analysis":33},861336,"“向安装单位提供安装设备位置的基础施工资料，确保建筑起重机械进行安装、拆卸所需的施工条件”是（）单位的基本职责。",[485,487,489,491],{"key":20,"text":486,"correct":22},"出租",{"key":24,"text":488,"correct":22},"使用",{"key":27,"text":490,"correct":29},"建筑施工总承包",{"key":31,"text":492,"correct":22},"监理",{"id":494,"libraryId":5,"type":36,"typeLabel":37,"stem":495,"options":496,"answer":41,"analysis":33},861337,"为了加强建筑超重机械的安全监督管理，防止和减少生产安全事故，保障人民群众的生命和财产安全，中华人民共和国住房和城乡建设部分布了《建筑超重机械安全监督管理规定》根据规定回答以下问题： 出租单位应当在签订的建筑起重机械租赁合同中，应明确租赁双方的安全责任。（）",[497,498],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},{"id":500,"libraryId":5,"type":94,"typeLabel":95,"stem":501,"options":502,"answer":414,"analysis":33},861338,"2015年2月，某市建筑安全监督站对辖区内一在建大型商场进行了安全生产检查，发现该工程模板工程及支撑体系、脚手架工程、土方开挖工程为危险较大的分部分项工程及超过一定规模的危险性较大的分部分项工程。施工单位对不需专家论证的施工方案，现场编制后直接报送监理单位，经总监审批后，现场按照该方案进行了实施。对需要进行专家论证的方案，该施工单位组织了专家论证会，专家组对方案提出了修改意见，施工单位按照论证意见进行了方案修改。在实施过程中，因现场情况发生了变化，施工单位对方案进行了调整，并按照调整的方案进行了施工。请根据背景资料，回答下列问题： 下列脚手架工程中，属于超过一定规模危险性较大的分部分项工程的有（）。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"搭设高度24米及以上的落地式钢管脚手架",{"key":24,"text":506,"correct":29},"架体高度20米及以上悬挑脚手架",{"key":27,"text":508,"correct":29},"提升高度150米及以上附着式和分片提升脚手架",{"key":31,"text":510,"correct":29},"搭设高度50米及以上落地式钢管脚手架工程",{"key":107,"text":512,"correct":22},"搭设高度48米及以上落地式钢管脚手架工程",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},861339,"基坑工程前期工作涉及的单位和与建设工程周边相关的企事业单位，（）是前期工作的主导单位。",[517,518,520,521],{"key":20,"text":21,"correct":29},{"key":24,"text":519,"correct":22},"勘察单位",{"key":27,"text":25,"correct":22},{"key":31,"text":522,"correct":22},"施工单位",{"id":524,"libraryId":5,"type":36,"typeLabel":37,"stem":525,"options":526,"answer":43,"analysis":33},861340,"模板及其支撑体系的施工荷载可随意堆置，并不得超过设计计算要求。（）",[527,528],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":29},{"id":530,"libraryId":5,"type":36,"typeLabel":37,"stem":531,"options":532,"answer":41,"analysis":33},861341,"建筑起重机械检验检测机构进行起重机械设备检验检测时，发现严重事故隐患，应当及时告知设备使用单位，并立即向工程所在地建设行政主管部门报告。（）",[533,534],{"key":20,"text":41,"correct":29},{"key":24,"text":43,"correct":22},[536,539,542,545,548,551],{"id":15,"name":537,"category":7,"favorite":538},"领导干部任职前廉政法规知识测试题",92,{"id":540,"name":541,"category":7,"favorite":15},595,"建筑结构与设备",{"id":543,"name":544,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":546,"name":547,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":549,"name":550,"category":7,"favorite":8},534,"BIM工程师",{"id":552,"name":550,"category":7,"favorite":8},535]