[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-860967":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},860967,553,3,"判断题","在场界四周隔档高度位置测得的大气总悬浮颗粒物月平均浓度与城市背景值的差值不大于0.08mg\u002Fm3是绿色施工要求扬尘控制要实现的目标之一。（）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"绿色施工要求扬尘控制实现三个目标：1）土方作业阶段达到作业区目测扬尘高度小于1.5m。2）结构施工、安装及装饰装修阶段，作业区目测扬尘高度小于0.5m。3）在场界四周隔挡高度位置测得的大气总悬浮颗粒物（TSP）月平均浓度与城市背景值的差值不大于0.08mg\u002Fm3。",{"id":6,"name":21,"category":22,"favorite":23},"B证（项目负责人）","建筑工程",0]