[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-859991":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},859991,538,1,"单选题","根据《关于进一步规范房屋建筑和市政工程生产安全事故报告和调查处理工作的若干意见》，事故报告后出现新情况，以及事故发生之日起（）内伤亡人数发生变化的，应当及时补报。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","15日",false,{"key":16,"text":17,"correct":14},"B","20日",{"key":19,"text":20,"correct":21},"C","30日",true,{"key":23,"text":24,"correct":14},"D","60日","解析",{"id":6,"name":27,"category":28,"favorite":29},"A证（主要负责人）","建筑工程",0]