[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-859802":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},859802,537,3,"判断题","工程完工后，应及时对红线内占地恢复原地形、地貌，使施工活动对周边环境的影响降至最低。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"工程完工后，应及时对红线外占地恢复原地形、地貌，使施工活动对周边环境的影响降至最低。",{"id":6,"name":21,"category":22,"favorite":23},"A证（企业负责人）","建筑工程",0]