[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-859624":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},859624,537,3,"判断题","项目经理必须在建筑起重机械安装、拆卸，模板支架搭设等危险性较大的分部分项工程施工期间现场带班。（ ）",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"项目经理必须在建筑起重机械安装、拆卸，模板支架搭设等危险性较大的分部分项工程施工期间现场带班。",{"id":6,"name":21,"category":22,"favorite":23},"A证（企业负责人）","建筑工程",0]