[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-859139":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},859139,537,1,"单选题","基坑施工过程中，对土钉墙，应在土钉、喷射混凝土面层的养护时间大于（ ）后，方可下挖基坑。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1天",false,{"key":16,"text":17,"correct":18},"B","2天",true,{"key":20,"text":21,"correct":14},"C","3天",{"key":23,"text":24,"correct":14},"D","4天","对采用预应力锚杆的支护结构，应在锚杆施加预加力后，方可下挖基坑；对土钉墙，应在土钉、喷射混凝土面层的养护时间大于2天后，方可下挖基坑。",{"id":6,"name":27,"category":28,"favorite":29},"A证（企业负责人）","建筑工程",0]