[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858926":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},858926,537,1,"单选题","如因设计结构外部环境等因素发生变化确需修改的，修改后的专项方案应当按《危险性较大的分部分项工程安全管理办法》的要求（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","经建设单位批准",false,{"key":16,"text":17,"correct":14},"B","经设计单位认可",{"key":19,"text":20,"correct":14},"C","经监理单位同意",{"key":22,"text":23,"correct":24},"D","重新审核",true,"施工单位应当严格按照专项方案组织施工，不得擅自修改、调整专项方案。如因设计、结构、外部环境等因素发生变化确需修改的，修改后的专项方案应当按《危险性较大的分部分项工程安全管理办法》的要求重新审核。对于超过一定规模的危险性较大工程的专项方案，施工单位应当重新组织专家进行论证。",{"id":6,"name":27,"category":28,"favorite":29},"A证（企业负责人）","建筑工程",0]