[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858649":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},858649,537,1,"单选题","涉及深基坑、地下暗挖工程、高大模板工程的专项施工方案,施工单位还应当（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","重新测算安全验算结果",false,{"key":16,"text":17,"correct":18},"B","组织专家进行论证、审查",true,{"key":20,"text":21,"correct":14},"C","附监理工程师名单",{"key":23,"text":24,"correct":14},"D","附安全预算","国务院建设行政主管部门或者其他有关部门规定的其他危险性较大的工程。对前款所列工程中涉及深基坑、地下暗挖工程、高大模板工程的专项施工方案，施工单位还应当组织专家进行论证、审查。",{"id":6,"name":27,"category":28,"favorite":29},"A证（企业负责人）","建筑工程",0]