[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,26,50,1302,[13,38,53,68,83,98,113,128,142,157,172,187,201,216,231,246,261,275,289,303,317,331,346,360,375,389,403,418,432,447,461,475,489,503,517,531,545,557,571,586,598,609,623,637,651,665,680,694,708,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},858475,2,"多选题","BIM技术在招投标中的应用优势有()。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","提高了招投标的效率",true,{"key":24,"text":25,"correct":22},"B","提高了招投标的质量",{"key":27,"text":28,"correct":22},"C","提升了施工方竞标能力",{"key":30,"text":31,"correct":32},"D","节省了招投标阶段的成本",false,{"key":34,"text":35,"correct":22},"E","提升了行业招投标管理水平","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},858476,"BIM在项目规划设计阶段的应用，需要配合的专业有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"建筑专业",{"key":24,"text":45,"correct":22},"结构专业",{"key":27,"text":47,"correct":32},"内装专业",{"key":30,"text":49,"correct":32},"幕墙专业",{"key":34,"text":51,"correct":22},"机电专业","ABE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},858477,"下列选项是属于BIM在施工企业应用内容的是()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"建立BIM施工模型",{"key":24,"text":60,"correct":32},"能耗分析",{"key":27,"text":62,"correct":22},"施工过程模拟",{"key":30,"text":64,"correct":32},"运行维护",{"key":34,"text":66,"correct":22},"施工深化设计","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},858478,"BIM技术可以辅助进行绿色建筑设计，具体可包括()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"利用场地环境数据模型，导人CFD软件进行风环境分析",{"key":24,"text":75,"correct":22},"利用场地环境数据模型，进行场地日照分析",{"key":27,"text":77,"correct":32},"利用场地环境数据模型，优化施工方案",{"key":30,"text":79,"correct":22},"利用BIM模型，优化建筑形体",{"key":34,"text":81,"correct":22},"利用BIM模型，导人ECOTECT软件进行能耗分析","ABDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},858479,"下面关于BIM结构设计基本流程说法正确的是()。",[87,89,91,93,95],{"key":20,"text":88,"correct":32},"不能使用BIM软件直接创建BIM结构设计模型",{"key":24,"text":90,"correct":22},"可以从已有的BIM建筑设计模型提取结构设计模型",{"key":27,"text":92,"correct":22},"可以利用相关技术对BIM结构模型进行同步修改，使BIM结构模型和结构计算模型保持一致",{"key":30,"text":94,"correct":22},"可以提取结构构件工程量",{"key":34,"text":96,"correct":22},"可以绘制局部三维节点图","BCDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},858480,"下面关于传统项目管理说法正确的是()。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"二维CAD设计图形象差，二维图纸不方便各专业之间的协调沟通，传统方法不.利于规范化和精细化管理",{"key":24,"text":105,"correct":32},"我国项目管理还处于中级水平，参与各方对此没有足够的重视",{"key":27,"text":107,"correct":22},"精细化管理需要细化到不同时间、构件、工序等，难以实现过程管理",{"key":30,"text":109,"correct":22},"项目全寿命没有系统管理，各阶段分离脱节",{"key":34,"text":111,"correct":22},"由多个不同的参与方从各自角度出发，对项目进行管理，会影响相互间的信息交流，也影响了项目全寿命的信息管理","ACDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},858481,"碰撞检测能够在BIM三维空间几何模型中提前发现()专业在空间上的冲突、碰撞问题。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"建筑",{"key":24,"text":120,"correct":22},"结构",{"key":27,"text":122,"correct":22},"消防",{"key":30,"text":124,"correct":22},"给水排水",{"key":34,"text":126,"correct":22},"幕墙","ABCDE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":82,"analysis":37},858482,"下列关于LOD的说法正确的是()。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"LOD指BIM模型原件在建筑生命周期的不同阶段中所预期的“完整度”",{"key":24,"text":135,"correct":22},"LOD定义了从100到500的五种",{"key":27,"text":137,"correct":32},"LOD200管道中只有管道类型、管径和主管标高，没有支管标高",{"key":30,"text":139,"correct":22},"LOD500管道中包括运营信息和物业管理所有详细信息",{"key":34,"text":141,"correct":22},"LOD100电线电缆不建模",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},858483,"结构施工图设计模型的关联信息包括()。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"构件之间的关联关系",{"key":24,"text":149,"correct":32},"模型与模型的关联关系",{"key":27,"text":151,"correct":22},"模型与信息的关联关系",{"key":30,"text":153,"correct":22},"模型与视图的关联关系",{"key":34,"text":155,"correct":32},"专业模型间的关联关系","ACD",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},858484,"下面关于施工工序管理说法错误的是()。",[161,163,165,167,169],{"key":20,"text":162,"correct":32},"利用BIM技术能够更好地确定工序质量控制工作计划",{"key":24,"text":164,"correct":32},"利用BIM技术能够主动控制工序活动条件的质量",{"key":27,"text":166,"correct":22},"工序活动条件主要影响质量的三大因素，即人、材料、机械设备",{"key":30,"text":168,"correct":32},"能够及时检验工序活动效果的质量",{"key":34,"text":170,"correct":22},"BIM技术暂时还不能设置工序质量控制点，需要人工重点控制","CE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":186,"analysis":37},858485,"下面关于基于BIM技术的项目管理说法正确的是()。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"工程基础数据如量、价等数据信息可随时查询调用，数据实现共享",{"key":24,"text":179,"correct":22},"增强了项目相关方的信息共享，促进更有效的互动",{"key":27,"text":181,"correct":22},"三维信息模型BIM的表达方式更加直观、易读，从建设方、设计方、施工方、监理方、使用方等都能比较直观地掌握项目的全貌",{"key":30,"text":183,"correct":22},"风睑茼置是BIM对项目管理最直接的优势",{"key":34,"text":185,"correct":32},"BIM模型现在还无法作为二次渲染开发的模型基础","ABCD",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":36,"analysis":37},858486,"在机电管线设计和建模过程中，必须进行碰撞检查，下列说法正确的是()。",[191,193,195,197,199],{"key":20,"text":192,"correct":22},"碰撞检测的目的是为了确保各系统间管线、设备间无干涉",{"key":24,"text":194,"correct":22},"碰撞检测必须在管道各系统间以及管道与梁、柱等土建模型间进行",{"key":27,"text":196,"correct":22},"碰撞检查分为两类，即项目内图元之间碰撞检查和项目图元与项目链接模型之间碰撞检查",{"key":30,"text":198,"correct":32},"项目内图元碰撞检查，指检测当前项目中图元与图元之间的碰撞关系，不可以执行指定图元的碰撞检查",{"key":34,"text":200,"correct":22},"项目图元与项目链接模型之间碰撞检查，指对当前项目中图元与链接模型中的图元进行碰撞检测",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":215,"analysis":37},858487,"被动节能措施的判定依据有()。",[205,207,209,211,213],{"key":20,"text":206,"correct":32},"暖通设备空调",{"key":24,"text":208,"correct":22},"采光",{"key":27,"text":210,"correct":32},"照明设备",{"key":30,"text":212,"correct":22},"遮阳",{"key":34,"text":214,"correct":22},"自然通风","BDE",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":230,"analysis":37},858488,"结构施工图设计模型的模型信息主要包括()。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"抗震构造措施说明",{"key":24,"text":223,"correct":32},"结构荷载信息",{"key":27,"text":225,"correct":32},"结构材质信息",{"key":30,"text":227,"correct":22},"结构设计说明",{"key":34,"text":229,"correct":32},"结构配筋信息","AD",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":245,"analysis":37},858489,"CATIA软件的功能有()。",[235,237,239,241,243],{"key":20,"text":236,"correct":22},"参数化设计",{"key":24,"text":238,"correct":22},"工程量统计",{"key":27,"text":240,"correct":32},"四维仿真",{"key":30,"text":242,"correct":22},"曲面及创意设计",{"key":34,"text":244,"correct":32},"施工工艺展示","ABD",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":260,"analysis":37},858490,"BIM模型在不同平台之间转换时，下列()做法有助于解决模型信息的丢失问题。",[250,252,254,256,258],{"key":20,"text":251,"correct":22},"尽量避免平台之间的转换",{"key":24,"text":253,"correct":22},"对常用的平台进行开发，增强其接收数据的能力",{"key":27,"text":255,"correct":22},"尽量使用全球统一标准的文件格式",{"key":30,"text":257,"correct":32},"禁止使用不同平台",{"key":34,"text":259,"correct":32},"禁止使用不同软件","ABC",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":215,"analysis":37},858491,"下面关于精细化桩基施工过程的应用过程说法正确的是()。",[265,267,269,271,273],{"key":20,"text":266,"correct":32},"现在BIM还不能实现桩基的实际工程量统计",{"key":24,"text":268,"correct":22},"每个基础桩、护坡桩，具有唯一的编码，根据编码可以查询桩施工过程中关键进度、质量的数据",{"key":27,"text":270,"correct":32},"BIM模型还不能支持按照施工部署进行区域划分",{"key":30,"text":272,"correct":22},"BIM模型能支持按照现场协调安排进行区域划分",{"key":34,"text":274,"correct":22},"可以通过移动端设备，跟踪每根桩的施工开始、施工完成时间",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":260,"analysis":37},858492,"机电专业BIM应用时，管网用不同颜色加以区分的原因是()。",[279,281,283,285,287],{"key":20,"text":280,"correct":22},"机电管网相对复杂",{"key":24,"text":282,"correct":22},"减少错误产生的概率",{"key":27,"text":284,"correct":22},"提升建筑品质",{"key":30,"text":286,"correct":32},"核验管网尺寸",{"key":34,"text":288,"correct":32},"与建筑师协调空间问题",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":36,"analysis":37},858493,"在风管连接风口命令中，可选择的连接方式有()。",[293,295,297,299,301],{"key":20,"text":294,"correct":22},"弯头连风口",{"key":24,"text":296,"correct":22},"三通连风口",{"key":27,"text":298,"correct":22},"四通连风口",{"key":30,"text":300,"correct":32},"五通连风口",{"key":34,"text":302,"correct":22},"侧连接风口",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":112,"analysis":37},858494,"下面关于基于BIM技术的成本管理说法正确的是()。",[307,309,311,313,315],{"key":20,"text":308,"correct":22},"BIM技术提高了成本核算和成本分析的工作效率",{"key":24,"text":310,"correct":32},"在成本核算中，通过构件和模型的自动关联，实现以模型为载体，各构件价格和工程量数据相对应，从而实现实际收入的快速核算",{"key":27,"text":312,"correct":22},"BIM技术提高了成本分析的工作效率。",{"key":30,"text":314,"correct":22},"通过模型工程量、分包报量与合同价格的对应，实现项目实际成本和预算成本的快速核算",{"key":34,"text":316,"correct":22},"在成本核算的基础上，BIM系统可按时间对比分析整个项目的核算成本情况",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":82,"analysis":37},858495,"BIM深化设计协调管理流程是()。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"建立规范文件存储体系",{"key":24,"text":324,"correct":22},"定制统一的标准",{"key":27,"text":326,"correct":32},"工程量预算管理",{"key":30,"text":328,"correct":22},"深化设计变更管理",{"key":34,"text":330,"correct":22},"竣工模型管理",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":345,"analysis":37},858496,"概念设计阶段BIM应用有()。",[335,337,339,341,343],{"key":20,"text":336,"correct":32},"场地声环境模拟",{"key":24,"text":338,"correct":22},"场地风环境模拟",{"key":27,"text":340,"correct":22},"场地日照分析",{"key":30,"text":342,"correct":32},"地震模拟分析",{"key":34,"text":344,"correct":22},"局部日照分析","BCE",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":260,"analysis":37},858497,"结构施工图设计模型的属性信息包括()。",[350,352,354,356,358],{"key":20,"text":351,"correct":22},"荷载信息",{"key":24,"text":353,"correct":22},"材料信息",{"key":27,"text":355,"correct":22},"内力信息",{"key":30,"text":357,"correct":32},"节点信息",{"key":34,"text":359,"correct":32},"截面信息",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":374,"analysis":37},858498,"下面关于BIM项目工作人员组织配置说法错误的是()。",[364,366,368,370,372],{"key":20,"text":365,"correct":32},"人员组织配置的原则是按照所需专业和工作量进行人员配置",{"key":24,"text":367,"correct":22},"在配置的过程中应该考虑全部专业的工作量，不应重点区分",{"key":27,"text":369,"correct":32},"项目负责人负责项目整体分工和协调工作",{"key":30,"text":371,"correct":32},"各专业人员负责分工范围内的模型建立和深化设计工作",{"key":34,"text":373,"correct":22},"各专业人员对整个项目交付的深化设计成果对甲方负责","BE",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":171,"analysis":37},858499,"下面关于BIM施工图设计中协同设计说法错误的是()。",[379,381,383,385,387],{"key":20,"text":380,"correct":32},"各专业统一在一个中心文件中建立模型、完成施工图设计",{"key":24,"text":382,"correct":32},"实时更新模型，同步修改",{"key":27,"text":384,"correct":22},"协同方式为阶段性协同",{"key":30,"text":386,"correct":32},"减少了对图、改图的工作量",{"key":34,"text":388,"correct":22},"减少设计周期",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":97,"analysis":37},858500,"以下关于协同绘图的说法正确的是()。",[393,395,397,399,401],{"key":20,"text":394,"correct":32},"使用链接方式的使用条件：不需要采用相同版本的建模软件，建立统一的标高轴网文件，各专业工程师建立自己的项目文件",{"key":24,"text":396,"correct":22},"工作集协作模式的使用条件：需要有服务器存储设备及同一网络，采用相同版本的建模软件，由项目负责人统一建立和管理工作集的设置",{"key":27,"text":398,"correct":22},"采用链接方式的优点是，可不受建模人员所在地点和使用设备的限制，各专业人员可随时随地独立完成负责范围内的模型文件的建立和修改",{"key":30,"text":400,"correct":22},"采用链接方式的缺点是各专业建模型调整信息的实时性不强，由于建模协调工作不及时而造成模型的反复调整",{"key":34,"text":402,"correct":22},"采用工作集协调方式的优点是：多专业可对同一项目模型进行编辑，通过实时更新的方法，各专业人员可随时了解整个项目模型的构建情况和细节，实时对模型进行调整和优化",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":417,"analysis":37},858501,"在风管标注命令中，标准方式可以选择()。",[407,409,411,413,415],{"key":20,"text":408,"correct":22},"单选手动标注",{"key":24,"text":410,"correct":32},"多选手动标注",{"key":27,"text":412,"correct":32},"单选引出标注",{"key":30,"text":414,"correct":32},"多选引出标注",{"key":34,"text":416,"correct":22},"同类自动标注","AE",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":245,"analysis":37},858502,"下面关于管线优化设计遵循的原则说法正确的是()",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"在非管线穿梁、碰柱、穿吊顶等必要情况下，尽量不要改动",{"key":24,"text":425,"correct":22},"管线优化设计时，应预留安装、检修空间",{"key":27,"text":427,"correct":32},"只需调整管线安装方向即可避免的碰撞，属于硬碰撞，可以不修改，以减少设计人员的工作量",{"key":30,"text":429,"correct":22},"需满足建筑业主要求，对没有碰撞，但不满足净高要求的空间，也需要进行优化设计",{"key":34,"text":431,"correct":32},"管线避让原则：无压管让有压管；小管线让大管线；施工简单管让施工复杂管；冷水管道避让热水管道；附件少的管道避让附件多的管道；临时管道避让永久管道",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":446,"analysis":37},858503,"结构施工图设计模型的管理信息包括()。",[436,438,440,442,444],{"key":20,"text":437,"correct":32},"模型使用者信息",{"key":24,"text":439,"correct":22},"模型所有者信息",{"key":27,"text":441,"correct":22},"用户权限信息",{"key":30,"text":443,"correct":22},"模型版本信息",{"key":34,"text":445,"correct":32},"模型使用信息","BCD",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":417,"analysis":37},858504,"业主自主管理的模式下，在设计阶段，建设单位采用BIM技术进行建设项目设计的展示和分析，主要体现在()。",[451,453,455,457,459],{"key":20,"text":452,"correct":22},"将BIM模型作为与设计方沟通的平台，控制设计进度",{"key":24,"text":454,"correct":32},"对专项施工方案进行模拟",{"key":27,"text":456,"correct":32},"对施工图进行深化设计",{"key":30,"text":458,"correct":32},"对BIM实施全过程进行规划",{"key":34,"text":460,"correct":22},"进行设计错误的检测，在施工开始之前解决所有设计问题，确保设计的可实施性，减少返工",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":36,"analysis":37},858505,"下列选项中，属于BIM可视化特点的是()。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"BIM软件的隐藏线、带边框着色和真实着色三种模型显示模式",{"key":24,"text":468,"correct":22},"BIM具有漫游功能，通过创建相机路径，可创建动画或一系列图像",{"key":27,"text":470,"correct":22},"BIM工具创建建筑设备模型、周转材料模型、临时设施模型等，可在电脑中进行虚拟施工，使施工组织可视化",{"key":30,"text":472,"correct":32},"BIM模型对项目管理方而言，可只管了解整个施工安装环节的时间节点、安装工序及疑难点，进而提高施工效率和施工方案安全性",{"key":34,"text":474,"correct":22},"机电管线可视化，可通过将各专业模型组装为一个整体BIM模型，使机电管线与建筑物的碰撞点以三维方式直接显示出来",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":36,"analysis":37},858506,"下列选项属于总平面图内容的是()。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"总平面布置图",{"key":24,"text":482,"correct":22},"土方工程图",{"key":27,"text":484,"correct":22},"竖向设计图",{"key":30,"text":486,"correct":32},"结构布置图",{"key":34,"text":488,"correct":22},"绿化布置图",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":97,"analysis":37},858507,"根据工程项目信息使用的有关资料，下列选项中属于美国标准和技术研究院划分的生命周期阶段的是()。",[493,495,497,499,501],{"key":20,"text":494,"correct":32},"招投标阶段",{"key":24,"text":496,"correct":22},"规划和计划阶段",{"key":27,"text":498,"correct":22},"施工阶段",{"key":30,"text":500,"correct":22},"项目运营和维护阶段",{"key":34,"text":502,"correct":22},"清理阶段",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":245,"analysis":37},858508,"建立模型维护与应用保障体系主要包括()。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"建立模型应用机制",{"key":24,"text":510,"correct":22},"确定模型应用计划",{"key":27,"text":512,"correct":32},"确定实施目标",{"key":30,"text":514,"correct":22},"制定实施全过程规划",{"key":34,"text":516,"correct":32},"核算应用成本",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":127,"analysis":37},858509,"基于BIM的建筑节能分析包含下列选项中的()。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"室外风环境模拟",{"key":24,"text":524,"correct":22},"小区热环境模拟分析",{"key":27,"text":526,"correct":22},"自然采光模拟",{"key":30,"text":528,"correct":22},"室内自然通风模拟",{"key":34,"text":530,"correct":22},"建筑环境噪声模拟分析",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":127,"analysis":37},858510,"下列选项中，属于BIM技术与GIS的应用范围的有()。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"城市规划",{"key":24,"text":538,"correct":22},"城市微环境分析",{"key":27,"text":540,"correct":22},"住宅小区规划",{"key":30,"text":542,"correct":22},"数字防灾",{"key":34,"text":544,"correct":22},"城市交通分析",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":446,"analysis":37},858511,"下列选项中，属于BIM技术与3D扫描集成应用的范围有()。",[549,550,552,554,556],{"key":20,"text":540,"correct":32},{"key":24,"text":551,"correct":22},"施工质量检测",{"key":27,"text":553,"correct":22},"辅助实际工程量统计",{"key":30,"text":555,"correct":22},"钢结构预拼装",{"key":34,"text":542,"correct":32},{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":82,"analysis":37},858512,"BIM的实施模式主要有()。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"咨询辅助管理模式",{"key":24,"text":564,"correct":22},"施工承包商主导管理模式",{"key":27,"text":566,"correct":32},"政府主导管理模式",{"key":30,"text":568,"correct":22},"设计主导管理模式",{"key":34,"text":570,"correct":22},"业主自主管理模式",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":585,"analysis":37},858513,"下列选项关于《建筑工程设计信息模型交付标准》中建筑经济对设计信息模型的交付要求说法正确的是()。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"100级建模精细度(LOD100)建筑信息模型应支持投资估算",{"key":24,"text":578,"correct":22},"200级建模精细度(LOD200)建筑信息模型应支持设计概算",{"key":27,"text":580,"correct":32},"300级建模精细度(LOD300)建筑信息模型应支持运维估算",{"key":30,"text":582,"correct":32},"400级建模精细度(LOD300)建筑信息模型应支持工程量清单",{"key":34,"text":584,"correct":32},"500级建模精细度(LOD300)建筑信息模型应支持招标控制价","AB",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":186,"analysis":37},858514,"工序质量控制就是对工序活动条件即工序活动投入的质量和工序活动效果的质量及分项工程质量的控制。利用BIM技术进行工序质量控制主要体现在()。",[590,591,593,594,596],{"key":20,"text":162,"correct":22},{"key":24,"text":592,"correct":22},"利用BIM技术主动控制工序活动条件的质量",{"key":27,"text":168,"correct":22},{"key":30,"text":595,"correct":22},"利用BIM技术设置工序质量控制点(工序管理点)，实行重点控制",{"key":34,"text":597,"correct":32},"对工序的绿色性能进行分析",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":186,"analysis":37},858515,"下列BIM应用管理模式中适用于工程全过程阶段的有()。",[602,603,605,606,607],{"key":20,"text":568,"correct":22},{"key":24,"text":604,"correct":22},"施工主导管理模式",{"key":27,"text":570,"correct":22},{"key":30,"text":562,"correct":22},{"key":34,"text":608,"correct":32},"监理主导管理模式",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":171,"analysis":37},858516,"BIM技术在项目施工阶段中的应用不包括()。",[613,615,617,619,621],{"key":20,"text":614,"correct":32},"虚拟建造管理",{"key":24,"text":616,"correct":32},"预制加工管理",{"key":27,"text":618,"correct":22},"资产设备维护管理",{"key":30,"text":620,"correct":32},"绿色施工管理",{"key":34,"text":622,"correct":22},"建筑性能分析",{"id":624,"libraryId":5,"type":15,"typeLabel":16,"stem":625,"options":626,"answer":636,"analysis":37},858517,"下列选项属于BIM在工程项目施工安全管理中的应用的是()。",[627,629,631,632,634],{"key":20,"text":628,"correct":32},"施工过程4D管理",{"key":24,"text":630,"correct":22},"施工动态监测",{"key":27,"text":238,"correct":32},{"key":30,"text":633,"correct":22},"灾害应急管理",{"key":34,"text":635,"correct":32},"模型碰撞检查","BD",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":186,"analysis":37},858518,"建筑工程图纸是用于表示建筑物的()等内容的有关图纸。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"内部布置情况",{"key":24,"text":644,"correct":22},"外部形状",{"key":27,"text":646,"correct":22},"装修",{"key":30,"text":648,"correct":22},"构造",{"key":34,"text":650,"correct":32},"造价",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":36,"analysis":37},858519,"下列关于BIM技术与数字加工的说法中正确的是()。",[655,657,659,661,663],{"key":20,"text":656,"correct":22},"BIM数字化加工集成，意味着将BIM模型中的数据转换成数字化加工所需的数字模型，进行数字化加工",{"key":24,"text":658,"correct":22},"BIM模型的数字化加工集成可应用于预制混凝土板生产",{"key":27,"text":660,"correct":22},"BIM模型的数字化加工集成可应用于管线预制加工和钢结构加工",{"key":30,"text":662,"correct":32},"BIM模型的数字化加工集成可应用于钢筋混凝土柱的生产",{"key":34,"text":664,"correct":22},"建筑中的门窗、整体卫浴等许多构件均可应用BIM模型的数字化加工集成进行异地加工",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":679,"analysis":37},858520,"LOD描述了一个BIM模型构件单元从最低级的近似概念化的程度发展到最高级的演示级精度的步骤，它的定义主要可用于()。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"确定模型阶段输出结果",{"key":24,"text":672,"correct":32},"确定模型存储空间",{"key":27,"text":674,"correct":22},"分配建模任务",{"key":30,"text":676,"correct":32},"确定各参与方的合作协同程度",{"key":34,"text":678,"correct":32},"确定模型数据交换格式","AC",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":186,"analysis":37},858521,"下列选项中，属于BIM的信息完备性的是()。",[684,686,688,690,692],{"key":20,"text":685,"correct":22},"建筑工程的完整设计信息",{"key":24,"text":687,"correct":22},"施工工序、人力、机械等施工信息",{"key":27,"text":689,"correct":22},"对象之间的工程逻辑关系",{"key":30,"text":691,"correct":22},"工程安全性能、材料耐久性能等维护信息",{"key":34,"text":693,"correct":32},"构件加工生产指导，能自动生成构建下料单、派工单等生产表单",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":36,"analysis":37},858522,"下列选项关于BIM技术较二维CAD技术的优势说法正确的是()。",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"CAD技术基本元素为点、线、面，无专业意义。BIM技术基本元素为墙、窗、门等，不但具有几何特性，同时还具有建筑物理特征和功能特征",{"key":24,"text":701,"correct":22},"CAD技术在修改图元时需要再次画图，或者通过拉伸命令调整大小。BIM技术所有图元均为参数化建筑构件，只需要更改属性，就可以调节构件的尺寸、样式及材质等",{"key":27,"text":703,"correct":22},"CAD技术各个建筑元素之间没有相关性，BIM技术各个构件是相互关联的",{"key":30,"text":705,"correct":32},"CAD技术只能对建筑位置进行有效表达，而BIM技术对建筑位置、尺寸、材质及成本等多种信息都能够进行很好地表达",{"key":34,"text":707,"correct":22},"CAD技术在整体建筑更改时需相应的对各投影面依次进行人工修改。而BIM技术只需进行一次修改，则与之相关的平面、立面、剖面、三维视图、明细表等都将自动修改",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":585,"analysis":37},858523,"在施工自主管理的模式下，承建商采用BIM技术的主要目的是()。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"辅助投标",{"key":24,"text":715,"correct":22},"辅助施工管理",{"key":27,"text":717,"correct":32},"辅助招标管理",{"key":30,"text":719,"correct":32},"辅助运维管理",{"key":34,"text":721,"correct":32},"辅助三维设计",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":52,"analysis":37},858524,"下列选项中属于建筑信息模型(BIM)系列相关专业技能岗位的是()。",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"战略分析",{"key":24,"text":729,"correct":22},"工程建模",{"key":27,"text":731,"correct":32},"工程制图",{"key":30,"text":733,"correct":32},"建筑设计",{"key":34,"text":735,"correct":22},"BIM管理咨询",[737,741,744,747,750,752],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":6,"category":7,"favorite":8},534,{"id":753,"name":754,"category":7,"favorite":8},536,"安全人A证"]