[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":708},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,25,50,1302,[13,38,51,66,80,94,109,121,134,148,163,178,192,204,216,231,246,257,271,285,300,315,329,342,356,368,380,392,401,413,428,443,457,472,486,500,514,527,541,555,570,585,599,613,627,641,655,666,680,694],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},858425,2,"多选题","下列属于工程算量的是()。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","土石方工程",true,{"key":24,"text":25,"correct":22},"B","基础",{"key":27,"text":28,"correct":22},"C","混凝土构件",{"key":30,"text":31,"correct":22},"D","钢筋",{"key":33,"text":34,"correct":35},"E","人员工作量",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":50,"analysis":37},858426,"在建筑的全生命周期内施行绿色理念，不仅要在规划设计阶段应用BIM技术，还要在()等方面深入应用BIM，不断推进整体行业向绿色方向行进。",[42,44,46,48],{"key":20,"text":43,"correct":22},"节地、节水、节材",{"key":24,"text":45,"correct":22},"节能及施工管理",{"key":27,"text":47,"correct":22},"运营维护管理",{"key":30,"text":49,"correct":35},"人力资源成本管理","ABC",{"id":52,"libraryId":5,"type":15,"typeLabel":16,"stem":53,"options":54,"answer":65,"analysis":37},858427,"下列哪些选项属于业主单位对BIM项目管理的需求()。",[55,57,59,61,63],{"key":20,"text":56,"correct":22},"可视化投资方案",{"key":24,"text":58,"correct":22},"可视化项目管理",{"key":27,"text":60,"correct":35},"可视化的物资采购",{"key":30,"text":62,"correct":22},"可视化的物业管理",{"key":33,"text":64,"correct":35},"可视化的人员管理","ABD",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":36,"analysis":37},858428,"决策过程一般可分为哪些阶段？()",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"信息收集",{"key":24,"text":73,"correct":22},"方案设计",{"key":27,"text":75,"correct":22},"方案评价",{"key":30,"text":77,"correct":22},"方案选择",{"key":33,"text":79,"correct":35},"方案优化",{"id":81,"libraryId":5,"type":15,"typeLabel":16,"stem":82,"options":83,"answer":36,"analysis":37},858429,"以下哪些选项属于五方责任主项目体负责人？()",[84,86,88,90,92],{"key":20,"text":85,"correct":22},"建设单位项目负责人",{"key":24,"text":87,"correct":22},"勘察单位项目负责人",{"key":27,"text":89,"correct":22},"设计单位项目负责人",{"key":30,"text":91,"correct":22},"施工单位项目经理",{"key":33,"text":93,"correct":35},"供货单位项目负责人",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},858430,"下列选项关于BIM技术在建造阶段中的应用说法正确的是()。",[98,100,102,104,106],{"key":20,"text":99,"correct":22},"BIM技术在工程项目成本控制中的应用主要体现在快速精确的成本核算、预算工程量动态查询与统计、限额领料与进度款支付管理、以施工预算控制人力资源和物质资源的消耗、设计优化与变更成本管理等",{"key":24,"text":101,"correct":35},"BIM在施工节能中的主要应用内容有场地分析、土方量计算、施工用地管理及空间管理等",{"key":27,"text":103,"correct":22},"在施工阶段，基于共享BIM模型能够实现对设计变更的有效管理和动态控制",{"key":30,"text":105,"correct":22},"利用BIM技术可以对施工场地废弃物的排放、放置进行模拟，以达到减排的目的",{"key":33,"text":107,"correct":35},"基于BIM的物料管理包括且不限于安装材料BIM模型数据库、安装材料分类控制、用料交底及工程量自动计算等","ACD",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":108,"analysis":37},858431,"建设项目全生命期一体化管理模式主要涵盖了哪些方面？()",[113,115,117,119],{"key":20,"text":114,"correct":22},"参与方一体化",{"key":24,"text":116,"correct":35},"管理成本一体化",{"key":27,"text":118,"correct":22},"管理要素一体化",{"key":30,"text":120,"correct":22},"管理过程一体化",{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":133,"analysis":37},858432,"从项目管理的角度，BIM技术与项目管理的集成应用在现阶段主要有哪些模式？()",[125,127,129,131],{"key":20,"text":126,"correct":22},"集成产品开发模式",{"key":24,"text":128,"correct":35},"集成产品设计模式",{"key":27,"text":130,"correct":35},"虚拟设计演练模式",{"key":30,"text":132,"correct":22},"虚拟设计建设模式","AD",{"id":135,"libraryId":5,"type":15,"typeLabel":16,"stem":136,"options":137,"answer":50,"analysis":37},858433,"下列选项属于BIM技术在节地与室外环境中的应用是()。",[138,140,142,144,146],{"key":20,"text":139,"correct":22},"场地分析",{"key":24,"text":141,"correct":22},"土方量计算",{"key":27,"text":143,"correct":22},"施工用地管理",{"key":30,"text":145,"correct":35},"管线综合",{"key":33,"text":147,"correct":35},"深化设计",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":162,"analysis":37},858434,"影响工程质量的因素主要有( )。",[152,154,156,158,160],{"key":20,"text":153,"correct":35},"时间",{"key":24,"text":155,"correct":22},"机械",{"key":27,"text":157,"correct":22},"材料",{"key":30,"text":159,"correct":22},"方法",{"key":33,"text":161,"correct":22},"环境","BCDE",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":177,"analysis":37},858435,"场地分析是对建筑物的定位、建筑物的空间方位及外观、建筑物和周边环境的关系、建筑物将来的车流、物流、人流等各方面的因素进行集成数据分析的综合。场地设计需要解决的问题主要有()。",[167,169,171,173,175],{"key":20,"text":168,"correct":22},"建筑物的竖向设计确定",{"key":24,"text":170,"correct":22},"建筑物周边的竖向设计确定",{"key":27,"text":172,"correct":35},"建筑物场地的合理选取",{"key":30,"text":174,"correct":22},"主出入口和次出入口的位置选择",{"key":33,"text":176,"correct":22},"考虑景观和市政需要配合的各种条件","ABDE",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":36,"analysis":37},858436,"BIM在技术方案展示中的应用主要体现在( )等方面。",[182,184,186,188,190],{"key":20,"text":183,"correct":22},"碰撞检查",{"key":24,"text":185,"correct":22},"虚拟施工",{"key":27,"text":187,"correct":22},"施工隐患排除",{"key":30,"text":189,"correct":22},"材料分区域统计",{"key":33,"text":191,"correct":35},"人员管理",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":133,"analysis":37},858437,"下列属于BIM在工程项目质量管理中的关键应用点有()。",[196,198,200,202],{"key":20,"text":197,"correct":22},"建模前期协同设计",{"key":24,"text":199,"correct":35},"安装材料BIM模型数据库",{"key":27,"text":201,"correct":35},"施工过程详细信息全过程查询",{"key":30,"text":203,"correct":22},"碰撞检测",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":65,"analysis":37},858438,"根据评价时间不同，后评价又可以分为()。",[208,210,212,214],{"key":20,"text":209,"correct":22},"跟踪评价",{"key":24,"text":211,"correct":22},"实施效果评价",{"key":27,"text":213,"correct":35},"进度评价",{"key":30,"text":215,"correct":22},"影响评价",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":230,"analysis":37},858439,"施工空间可以划分为()。",[220,222,224,226,228],{"key":20,"text":221,"correct":22},"可使用空间",{"key":24,"text":223,"correct":35},"不可使用空间",{"key":27,"text":225,"correct":35},"施工预留空间",{"key":30,"text":227,"correct":22},"施工过程空间",{"key":33,"text":229,"correct":22},"施工产品空间","ADE",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":245,"analysis":37},858440,"供货单位的项目管理工作涉及哪些阶段？( )",[235,237,239,241,243],{"key":20,"text":236,"correct":22},"施工阶段",{"key":24,"text":238,"correct":22},"设计准备阶段",{"key":27,"text":240,"correct":22},"设计阶段",{"key":30,"text":242,"correct":22},"动用前准备阶段",{"key":33,"text":244,"correct":22},"保修期","ABCDE",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":36,"analysis":37},858441,"供货单位的BIM应用需求主要来自于哪几个方面？( )",[250,251,253,255],{"key":20,"text":240,"correct":22},{"key":24,"text":252,"correct":22},"招投标阶段",{"key":27,"text":254,"correct":22},"施工建造阶段",{"key":30,"text":256,"correct":22},"运维阶段",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":245,"analysis":37},858442,"运维与设施管理的内容主要可分为( )。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"空间管理",{"key":24,"text":264,"correct":22},"资产管理",{"key":27,"text":266,"correct":22},"维护管理",{"key":30,"text":268,"correct":22},"公共安全管理",{"key":33,"text":270,"correct":22},"能耗管理",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":162,"analysis":37},858443,"下列哪几项属于BIM技术在专业深化设计阶段的应用( )。",[275,277,279,281,283],{"key":20,"text":276,"correct":35},"管线综合深化设计",{"key":24,"text":278,"correct":22},"土建结构深化设计",{"key":27,"text":280,"correct":22},"钢结构深化设计",{"key":30,"text":282,"correct":22},"幕墙深化设计",{"key":33,"text":284,"correct":22},"机电各专业深化设计",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":299,"analysis":37},858444,"下列属于工程变更的表现形式的是()。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"更改工程有关部位的标高、位置和尺寸",{"key":24,"text":292,"correct":22},"增减合同中约定的工程量",{"key":27,"text":294,"correct":35},"变更施工单位",{"key":30,"text":296,"correct":35},"变更工程成本",{"key":33,"text":298,"correct":22},"改变有关工程的施工顺序和时间安排","ABE",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":314,"analysis":37},858445,"BIM技术在建造准备阶段的应用主要包括( )。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"施工方案管理",{"key":24,"text":307,"correct":35},"物料跟踪",{"key":27,"text":309,"correct":22},"关键工艺展示",{"key":30,"text":311,"correct":35},"工程变更管理",{"key":33,"text":313,"correct":22},"施工过程模拟","ACE",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":108,"analysis":37},858446,"下列哪些属于施工方单位对BIM项目管理的需求()。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"理解设计意图",{"key":24,"text":322,"correct":35},"可视化的设计会审",{"key":27,"text":324,"correct":22},"把握施工细节",{"key":30,"text":326,"correct":22},"降低施工风险",{"key":33,"text":328,"correct":35},"提高设计质量",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":341,"analysis":37},858447,"基于BIM技术的物联网资产管理可以从根本上提高紧急预案的管理能力和资产追踪的()。",[333,335,337,339],{"key":20,"text":334,"correct":35},"共享性",{"key":24,"text":336,"correct":22},"及时性",{"key":27,"text":338,"correct":22},"可视性",{"key":30,"text":340,"correct":35},"创新性","BC",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":50,"analysis":37},858448,"下列选项属于BIM技术在结构分析的应用的有( )。",[346,348,350,352,354],{"key":20,"text":347,"correct":22},"A.通过IFC或Structure Modelenter数据计算模型",{"key":24,"text":349,"correct":22},"开展抗震、抗风、抗火等结构性能设计",{"key":27,"text":351,"correct":22},"结构计算结果存储在BIM模型或信息管理平台中，便于后续应用",{"key":30,"text":353,"correct":35},"基于BIM技术对建筑能耗进行计算、评估，进而开展能耗性能优化工作",{"key":33,"text":355,"correct":35},"基于BIM技术对其进行场地分析",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":50,"analysis":37},858449,"()是实现PLIM模式的三个基本要素。",[360,362,364,366],{"key":20,"text":361,"correct":22},"运作流程",{"key":24,"text":363,"correct":22},"组织结构",{"key":27,"text":365,"correct":22},"信息平台",{"key":30,"text":367,"correct":35},"协同控制",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":50,"analysis":37},858450,"工序质量控制就是对工序活动条件即()的质量和()的质量及()的质量控制。",[372,374,376,378],{"key":20,"text":373,"correct":22},"工序活动投入",{"key":24,"text":375,"correct":22},"工序活动效果",{"key":27,"text":377,"correct":22},"分项工程",{"key":30,"text":379,"correct":35},"工序活动进度",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":36,"analysis":37},858451,"在施工管理阶段，业主单位更多的是施工阶段的风险控制，可能的风险包括()。",[384,386,388,390],{"key":20,"text":385,"correct":22},"安全风险",{"key":24,"text":387,"correct":22},"进度风险",{"key":27,"text":389,"correct":22},"质量风险",{"key":30,"text":391,"correct":22},"投资风险",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":108,"analysis":37},858452,"建设项目全生命周期一体化管理模式主要涵盖了：()。",[396,397,399,400],{"key":20,"text":114,"correct":22},{"key":24,"text":398,"correct":35},"管理方一体化",{"key":27,"text":118,"correct":22},{"key":30,"text":120,"correct":22},{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":341,"analysis":37},858453,"基于BIM技术的成本控制具有很多优势，例如快速、准确、分析能力强，下列同样属于其成本控制优势的是()。",[405,407,409,411],{"key":20,"text":406,"correct":35},"优化",{"key":24,"text":408,"correct":22},"精细",{"key":27,"text":410,"correct":22},"提升企业成本控制能力",{"key":30,"text":412,"correct":35},"减小风险",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":427,"analysis":37},858454,"下列选项中属于基于BIM技术进行4D进度可视化管理的有()。",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"基于BIM技术的计划编制与模拟",{"key":24,"text":420,"correct":22},"施工日报",{"key":27,"text":422,"correct":22},"施工进度监控",{"key":30,"text":424,"correct":35},"工程量统计",{"key":33,"text":426,"correct":22},"进度计划分析","ABCE",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":442,"analysis":37},858455,"协同绘图的主要方式是()。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"使用链接",{"key":24,"text":435,"correct":35},"通过拷贝",{"key":27,"text":437,"correct":22},"工作集方式",{"key":30,"text":439,"correct":35},"多专业在同一文件中依次绘图方式",{"key":33,"text":441,"correct":35},"云端共享","AC",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":427,"analysis":37},858456,"BIM在市政桥梁设计中的作用包括()。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"用于复杂节点的深化设计",{"key":24,"text":450,"correct":22},"有助于施工单位理解设计意图",{"key":27,"text":452,"correct":22},"有助于优化施工工期与工艺方法",{"key":30,"text":454,"correct":35},"实现三维打印桥梁",{"key":33,"text":456,"correct":22},"指导后期的加工制造",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":471,"analysis":37},858457,"桥梁模型中桥面系包括()。",[461,463,465,467,469],{"key":20,"text":462,"correct":35},"拉索",{"key":24,"text":464,"correct":22},"人行道",{"key":27,"text":466,"correct":22},"栏杆",{"key":30,"text":468,"correct":22},"照明设施",{"key":33,"text":470,"correct":35},"鞍座","BCD",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":36,"analysis":37},858458,"下面能够通过BIM绿色节能分析计算的是()。",[476,478,480,482,484],{"key":20,"text":477,"correct":22},"太阳辐射",{"key":24,"text":479,"correct":22},"声环境、热环境",{"key":27,"text":481,"correct":22},"被动技术应用",{"key":30,"text":483,"correct":22},"建筑舒适度",{"key":33,"text":485,"correct":35},"结构体系可行性",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":65,"analysis":37},858459,"下列选项中属于初步设计阶段中BIM应用的是()。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"精细化设计",{"key":24,"text":493,"correct":22},"多专业协同",{"key":27,"text":495,"correct":35},"场地日照分析",{"key":30,"text":497,"correct":22},"建筑深化设计",{"key":33,"text":499,"correct":35},"优化施工方案",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":230,"analysis":37},858460,"下面关于BIM设计工作流程与传统设计流程的变化说法正确的是？()",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"基于BIM，结构专业在方案阶段可以实质性介入",{"key":24,"text":507,"correct":35},"在传统的方案设计阶段，结构专业不用对建筑专业提出的资料进行确认并反馈",{"key":27,"text":509,"correct":35},"基于BIM传统设计流程中设计准备环节还是不可提前实现",{"key":30,"text":511,"correct":22},"基于BIM，综合协调工作将贯穿于整个设计流程",{"key":33,"text":513,"correct":22},"基于BIM，支持模型与图档的关联修改与自动更新",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":36,"analysis":37},858461,"BIM模型不仅仅包括三维模型，还包含()的业务数据，通过BIM模型为技术方面和经济方面及时、准确地提供关键数据。",[518,520,522,524,526],{"key":20,"text":519,"correct":22},"进度",{"key":24,"text":521,"correct":22},"成本",{"key":27,"text":523,"correct":22},"合同",{"key":30,"text":525,"correct":22},"图纸",{"key":33,"text":153,"correct":35},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":245,"analysis":37},858462,"企业决定使用BIM技术进行深化设计时需要关注哪些方面的问题()；",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"使用BIM技术介入项目的时间点",{"key":24,"text":534,"correct":22},"BIM软件、硬件的选用",{"key":27,"text":536,"correct":22},"组建BIM实施团队",{"key":30,"text":538,"correct":22},"指定BIM深化设计流程",{"key":33,"text":540,"correct":22},"根据自身需求制定深化设计标准要求",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":50,"analysis":37},858463,"下面关于采用链接方式和工作集协调方式两种绘图方式说法正确的是()。",[545,547,549,551,553],{"key":20,"text":546,"correct":22},"采用链接方式可不受建模人员所在地点和使周设备的限制",{"key":24,"text":548,"correct":22},"采用链接方式建立完成的模型文件还可存储于便携式设备或通过网络传输，建模地点不受限制，较为灵活",{"key":27,"text":550,"correct":22},"采用工作集协调方式时，多专业可对同一项目模型进行编辑，通过实时更新的方法，各专业人员可随时了解整个项目模型的构建情况和细节，实时对模型进行调整和优化",{"key":30,"text":552,"correct":35},"采用工作集协调方式时，各专业人员可以使用链接不同服务器进行工作",{"key":33,"text":554,"correct":35},"采用工作集协调方式时，中心文件通过网络传输或者拷贝等方式在另外的建模设备上编辑",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":569,"analysis":37},858464,"主动节能措施的判定依据有()。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"暖通设备空调",{"key":24,"text":562,"correct":22},"照明设备",{"key":27,"text":564,"correct":35},"外围护结构设计",{"key":30,"text":566,"correct":35},"遮阳",{"key":33,"text":568,"correct":35},"自然通风","AB",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":584,"analysis":37},858465,"下面哪些属于结构施工图设计模型的内容？()",[574,576,578,580,582],{"key":20,"text":575,"correct":35},"楼板",{"key":24,"text":577,"correct":22},"坡道",{"key":27,"text":579,"correct":22},"楼梯",{"key":30,"text":581,"correct":35},"结构洞",{"key":33,"text":583,"correct":22},"集水坑","BCE",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":314,"analysis":37},858466,"结构专业常用的明细表主要包括()。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"构件尺寸表",{"key":24,"text":592,"correct":35},"门窗表",{"key":27,"text":594,"correct":22},"材料表明细",{"key":30,"text":596,"correct":35},"大样配筋表",{"key":33,"text":598,"correct":22},"楼梯表",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":36,"analysis":37},858467,"土方开挖工程量的计算流程有()。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"依据地勘报告，创建地下土模型",{"key":24,"text":606,"correct":22},"根据施工方案建立土方开挖的BIM模型",{"key":27,"text":608,"correct":22},"将土方开挖的BIM模型与地质土层模型进行对比",{"key":30,"text":610,"correct":22},"生成各土层开挖土方量清单表",{"key":33,"text":612,"correct":35},"生成造价清单表",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":162,"analysis":37},858468,"结构初步设计模型的模型信息主要包括()。",[617,619,621,623,625],{"key":20,"text":618,"correct":35},"结构荷载信息",{"key":24,"text":620,"correct":22},"构件配筋信息",{"key":27,"text":622,"correct":22},"挠度、裂缝的控制信息",{"key":30,"text":624,"correct":22},"配筋率信息",{"key":33,"text":626,"correct":22},"结构整体控制指标",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":569,"analysis":37},858469,"碰撞检查包括()。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"项目内图元之间碰撞检查",{"key":24,"text":634,"correct":22},"项目图元与项目链接模型之间碰撞检查",{"key":27,"text":636,"correct":35},"两个项目内图元之间的碰撞检查",{"key":30,"text":638,"correct":35},"项目链接模型之间的碰撞检查",{"key":33,"text":640,"correct":35},"多个项目内图元之间的碰撞检查",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":245,"analysis":37},858470,"在对设备建族的过程中，右键快捷菜单中可以对设备族进行哪些操作？()",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"新建类型",{"key":24,"text":648,"correct":22},"删除",{"key":27,"text":650,"correct":22},"重命名",{"key":30,"text":652,"correct":22},"保存",{"key":33,"text":654,"correct":22},"搜索",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":36,"analysis":37},858471,"BIM技术在项目哪些阶段的成本控制中能发挥作用()。",[659,661,662,663,665],{"key":20,"text":660,"correct":22},"决策阶段",{"key":24,"text":240,"correct":22},{"key":27,"text":236,"correct":22},{"key":30,"text":664,"correct":22},"竣工阶段",{"key":33,"text":256,"correct":35},{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":50,"analysis":37},858472,"BIM结构设计模型内容按设计阶段包含()。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"结构方案设计模型",{"key":24,"text":673,"correct":22},"结构初步设计模型",{"key":27,"text":675,"correct":22},"结构施工图设计模型",{"key":30,"text":677,"correct":35},"结构规划设计模型",{"key":33,"text":679,"correct":35},"结构施工模拟模型",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":314,"analysis":37},858473,"风管安装的顺序通常为()。",[684,686,688,690,692],{"key":20,"text":685,"correct":22},"先上层后下层",{"key":24,"text":687,"correct":35},"先支管后干管",{"key":27,"text":689,"correct":22},"先干管后支管",{"key":30,"text":691,"correct":35},"先水平管后主管",{"key":33,"text":693,"correct":22},"先主管后水平管",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":177,"analysis":37},858474,"下列哪几项属于运维与设施管理的特点？()",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"多职能性",{"key":24,"text":701,"correct":22},"服务性",{"key":27,"text":703,"correct":35},"组织性",{"key":30,"text":705,"correct":22},"专业性",{"key":33,"text":707,"correct":22},"可持续性",[709,713,716,719,722,724],{"id":710,"name":711,"category":7,"favorite":712},1,"领导干部任职前廉政法规知识测试题",92,{"id":714,"name":715,"category":7,"favorite":710},595,"建筑结构与设备",{"id":717,"name":718,"category":7,"favorite":710},715,"招标采购专业知识与法律法规",{"id":720,"name":721,"category":7,"favorite":710},848,"市政方向-通用基础",{"id":723,"name":6,"category":7,"favorite":8},534,{"id":725,"name":726,"category":7,"favorite":8},536,"安全人A证"]