[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":740},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,21,50,1302,[13,38,53,68,83,98,113,128,142,156,171,186,200,214,227,242,257,271,285,299,314,328,343,357,371,386,401,415,429,443,457,471,485,499,513,528,542,556,570,584,598,612,626,640,654,668,682,696,711,726],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},858220,2,"多选题","LOD技术具有广泛的应用领域。目前在()等领域都得到了应用，已经成为一项重要技术。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","实时图像通信",true,{"key":24,"text":25,"correct":22},"B","交互式可视化",{"key":27,"text":28,"correct":22},"C","虚拟现实",{"key":30,"text":31,"correct":32},"D","手机通话",false,{"key":34,"text":35,"correct":22},"E","碰撞检测","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},858221,"EXPRESS语言通过一系列的说明来进行描述，这些说明主要包括()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"类型说明(Type)",{"key":24,"text":45,"correct":22},"实体说明(Entity)",{"key":27,"text":47,"correct":22},"规则说明(Rule)",{"key":30,"text":49,"correct":22},"函数说明(Function)",{"key":34,"text":51,"correct":32},"材料说明(Materials)","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},858222,"下列关于碰撞检查软件的说法中正确的是()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"“硬碰撞”指的是模型中实体之间的碰撞",{"key":24,"text":60,"correct":32},"“硬碰撞”指的是模型是否符合施工要求",{"key":27,"text":62,"correct":22},"广联达BIM审图软件支持硬碰撞和软碰撞检测",{"key":30,"text":64,"correct":32},"目前，软碰撞和硬碰撞发展都比较成熟",{"key":34,"text":66,"correct":22},"碰撞检测软件Solibri在软碰撞检测方面功能非常丰富","ACE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},858223,"模型精细度LevelofDetails表示模型包含的信息()的指标。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"全面性",{"key":24,"text":75,"correct":22},"细致程度",{"key":27,"text":77,"correct":22},"准确性",{"key":30,"text":79,"correct":32},"可交换性",{"key":34,"text":81,"correct":32},"保持时效性","ABC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},858224,"BIM的协调性主要体现在()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"设计协调",{"key":24,"text":90,"correct":32},"施工环境生态协调",{"key":27,"text":92,"correct":22},"整体进度规划协调",{"key":30,"text":94,"correct":22},"成本预算、工程量估算协调",{"key":34,"text":96,"correct":22},"运维协调","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},858225,"建筑信息模型以数据对象的形式组织和表现建筑及其组成部分，并具备数据()的功能。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"共享",{"key":24,"text":105,"correct":22},"传递",{"key":27,"text":107,"correct":32},"演变",{"key":30,"text":109,"correct":22},"协同",{"key":34,"text":111,"correct":32},"加密","ABD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},858226,"下列选项中，关于BIM技术与云计算说法正确的是()。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"根据云的形态和规模，BIM与云计算集成应用将经理初级、中级和高级发展阶段",{"key":24,"text":120,"correct":22},"初级阶段以项目协同平台为标志，主要厂商的BIM应用通过介入项目协同平台，初步形成文档协作级别的BIM应用",{"key":27,"text":122,"correct":32},"初级阶段以模型信息平台为标志，合作厂商基于共同模型信息平台开发BIM应用，形成构件协作级别的BIM应用",{"key":30,"text":124,"correct":22},"中级阶段以模型信息平台为标志，合作厂商基于共同模型信息平台开发BIM应用，形成构件协作级别的BIM应用",{"key":34,"text":126,"correct":22},"高级阶段以开放平台为标志，用户可根据差异化需要从BIM云平台上获取所需的BIM应用，并形成自定义的BIM应用","ABDE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":97,"analysis":37},858227,"下列选项中属于BIM工程师在施工方面的工作应用的是()。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"利用模型进行“预施工”，降低施工风险",{"key":24,"text":135,"correct":32},"应用BIM技术，对工程造价进行预估",{"key":27,"text":137,"correct":22},"为构件加工提供详细的加工详图",{"key":30,"text":139,"correct":22},"进行施工深化设计，更好地对现场施工人员进行技术交底",{"key":34,"text":141,"correct":22},"利用模型进行施工过程荷载验算、进度物料控制、施工质量检查",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":36,"analysis":37},858228,"根据BIM应用程度不同可将BIM工程师主要分为()。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"BIM战略总监",{"key":24,"text":149,"correct":22},"BIM项目经理",{"key":27,"text":151,"correct":22},"BIM技术主管",{"key":30,"text":153,"correct":32},"BIM协调师",{"key":34,"text":155,"correct":22},"BIM操作人员",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},858229,"下列选项中属于BIM5D管理软件的是()。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"RIBiTWO",{"key":24,"text":163,"correct":22},"Vico办公室套装",{"key":27,"text":165,"correct":32},"Solibri",{"key":30,"text":167,"correct":32},"Navisworks",{"key":34,"text":169,"correct":32},"Tekla","AB",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},858230,"基于BIM技术的5D施工管理软件需要支持下列选项中的()。",[175,177,179,181,183],{"key":20,"text":176,"correct":32},"脚手架设计",{"key":24,"text":178,"correct":22},"场地建模",{"key":27,"text":180,"correct":22},"施工措施模拟",{"key":30,"text":182,"correct":22},"施工机械布置",{"key":34,"text":184,"correct":32},"钢筋翻样","BCD",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":52,"analysis":37},858231,"下列软件属于Revit插件软件的有()。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"鸿业BIMSpace",{"key":24,"text":193,"correct":22},"橄榄山软件",{"key":27,"text":195,"correct":22},"MagiCAD",{"key":30,"text":197,"correct":22},"isBIM",{"key":34,"text":199,"correct":32},"盈建科软件",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":52,"analysis":37},858232,"下列选项关于初步设计文件的深度要求说法正确的是()。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"经过比选，确定设计方案",{"key":24,"text":207,"correct":22},"确定工程造价，据以控制工程投资",{"key":27,"text":209,"correct":22},"确定土地征用范围",{"key":30,"text":211,"correct":22},"据以编制施工图设计",{"key":34,"text":213,"correct":32},"据以进行施工",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":52,"analysis":37},858233,"总平面图是将新建房屋及其附近一定范围内的()的总体情况，用水平投影的方法绘制而成的图样。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"建筑物",{"key":24,"text":221,"correct":22},"构筑物",{"key":27,"text":223,"correct":22},"室外场地",{"key":30,"text":225,"correct":22},"道路",{"key":34,"text":182,"correct":32},{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},858234,"4D进度管理软件中应包含()。",[231,233,235,237,239],{"key":20,"text":232,"correct":32},"成本信息",{"key":24,"text":234,"correct":22},"时间信息",{"key":27,"text":236,"correct":22},"几何信息",{"key":30,"text":238,"correct":32},"运维信息",{"key":34,"text":240,"correct":32},"力学信息","BC",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},858236,"下列选项中，属于BIM应急管理协调对突发事件的管理包括()。",[246,248,250,252,254],{"key":20,"text":247,"correct":32},"综合协调",{"key":24,"text":249,"correct":22},"预防",{"key":27,"text":251,"correct":32},"事件控制",{"key":30,"text":253,"correct":22},"警报",{"key":34,"text":255,"correct":22},"处理","BDE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":36,"analysis":37},858237,"常见的工程图纸图例有()。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"标题栏",{"key":24,"text":264,"correct":22},"会签栏",{"key":27,"text":266,"correct":22},"比例尺",{"key":30,"text":268,"correct":32},"钢筋",{"key":34,"text":270,"correct":22},"定位轴线",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":52,"analysis":37},858238,"基于BIM技术的工程设计专业协调主要体现在()。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"在设计过程中通过有效的、适时的专业间协同工作避免产生大量的专业冲突问题，即协同设计",{"key":24,"text":278,"correct":22},"通过过对3D模型的冲突进行检查，查找并修改，即冲突检查",{"key":27,"text":280,"correct":22},"基于协同平台，使各参与方能够进行及时的信息共享",{"key":30,"text":282,"correct":22},"基于三维可视化模型，可实现对设计成果的直观展示，减少不必要的沟通分歧",{"key":34,"text":284,"correct":32},"基于同一的建模标准，避免各参与方对模型应用产生的不同概念分歧",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":82,"analysis":37},858239,"下列选项中，可用于BIM协调性成本预算和工程量估算协调的工程信息包括()。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"工程量",{"key":24,"text":292,"correct":22},"设计参数",{"key":27,"text":294,"correct":22},"工程参数",{"key":30,"text":296,"correct":32},"几何信息参数",{"key":34,"text":298,"correct":32},"施工信息",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},858240,"下列选项中，在项目整个周期过程中，可以通过在模型中操作信息和在信息中操作模型，从而提高工作效率和降低风险的参与方有()。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"设计",{"key":24,"text":306,"correct":22},"运营管理",{"key":27,"text":308,"correct":22},"施工",{"key":30,"text":310,"correct":22},"政府主管部门",{"key":34,"text":312,"correct":22},"项目用户","ABCDE",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":36,"analysis":37},858241,"下列属于IFC资源层的类的有()的指标。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"IFCUtilityResource",{"key":24,"text":321,"correct":22},"IFCMeasureResource",{"key":27,"text":323,"correct":22},"IFCGeometryResource",{"key":30,"text":325,"correct":32},"IFCinformation",{"key":34,"text":327,"correct":22},"IFCProperty",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},858242,"三视图主要指的是()。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"正视图",{"key":24,"text":335,"correct":32},"斜视图",{"key":27,"text":337,"correct":32},"仰视图",{"key":30,"text":339,"correct":22},"俯视图",{"key":34,"text":341,"correct":22},"侧视图","ADE",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":313,"analysis":37},858244,"下列选项中，属于BIM信息类型的是()。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"静态型",{"key":24,"text":350,"correct":22},"动态不需要维护历史版本型",{"key":27,"text":352,"correct":22},"动态需要维护历史版本型",{"key":30,"text":354,"correct":22},"所有版本都需要维护型",{"key":34,"text":356,"correct":22},"只维护特定数目的前期版本型",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":313,"analysis":37},858245,"下列选项中，属于BIM工具软件在施工阶段的应用的是()。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"施工场地软件",{"key":24,"text":364,"correct":22},"模板及脚手架建模软件",{"key":27,"text":366,"correct":22},"钢筋翻样软件",{"key":30,"text":368,"correct":22},"变更计量软件",{"key":34,"text":370,"correct":22},"5D管理软件",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},858246,"建筑工程设计文件一般分为()。",[375,377,379,381,383],{"key":20,"text":376,"correct":22},"初步设计",{"key":24,"text":378,"correct":32},"详细设计",{"key":27,"text":380,"correct":22},"施工图设计",{"key":30,"text":382,"correct":32},"机械设计",{"key":34,"text":384,"correct":32},"设备设计","AC",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},858247,"建筑工程图纸中的设备施工图主要包括()。",[390,392,394,396,398],{"key":20,"text":391,"correct":32},"建筑剖面图",{"key":24,"text":393,"correct":22},"管道施工图",{"key":27,"text":395,"correct":22},"电气施工图",{"key":30,"text":397,"correct":22},"结构构件图",{"key":34,"text":399,"correct":22},"采暖施工图","BCDE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":400,"analysis":37},858248,"下列选项中数据状态的类型的是()。",[405,407,409,411,413],{"key":20,"text":406,"correct":32},"传递数据",{"key":24,"text":408,"correct":22},"共享数据",{"key":27,"text":410,"correct":22},"工作数据",{"key":30,"text":412,"correct":22},"出版数据",{"key":34,"text":414,"correct":22},"存档数据",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":170,"analysis":37},858249,"在优化总体规划中，管理者需要确定出建设项目方案在满足类型、质量、功能等要求下是否具有()，而BIM能够帮助提高其论证结果的准确性和可靠性。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"技术可行性",{"key":24,"text":422,"correct":22},"经济可行性",{"key":27,"text":424,"correct":32},"人员可行性",{"key":30,"text":426,"correct":32},"管理制度可行性",{"key":34,"text":428,"correct":32},"机械辅助设备可行性",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":170,"analysis":37},858250,"招投标阶段的BIM工具软件主要包括()。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"算量软件",{"key":24,"text":436,"correct":22},"造价软件",{"key":27,"text":438,"correct":32},"碰撞检查软件",{"key":30,"text":440,"correct":32},"深化设计软件",{"key":34,"text":442,"correct":32},"结构分析软件",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":400,"analysis":37},858251,"下列选项中属于BIM操作人员岗位职责的是()。",[447,449,451,453,455],{"key":20,"text":448,"correct":32},"负责对BIM项目的规划",{"key":24,"text":450,"correct":22},"负责创建BIM模型",{"key":27,"text":452,"correct":22},"负责BIM可持续设计",{"key":30,"text":454,"correct":22},"负责BIM工程量统计",{"key":34,"text":456,"correct":22},"负责BIM建筑动画的制作",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":112,"analysis":37},858252,"基于BIM技术，通过4D施工模拟，可以使()等各项工作安排的更加经济合理，从而加强了对施工进度、施工质量的控制。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"设备材料进场",{"key":24,"text":464,"correct":22},"劳动力配置",{"key":27,"text":466,"correct":32},"成本消耗",{"key":30,"text":468,"correct":22},"机械排班",{"key":34,"text":470,"correct":32},"安全布置",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":127,"analysis":37},858253,"下列选项属于BIM技术的特点的是()。",[475,477,479,481,483],{"key":20,"text":476,"correct":22},"信息完备性",{"key":24,"text":478,"correct":22},"可出图性",{"key":27,"text":480,"correct":32},"机械化",{"key":30,"text":482,"correct":22},"优化性",{"key":34,"text":484,"correct":22},"仿真性",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":112,"analysis":37},858254,"一般BIM实施方案主要包括()。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"BIM应用业务目标",{"key":24,"text":492,"correct":22},"BIM应用具体内容",{"key":27,"text":494,"correct":32},"BIM应用成本估算",{"key":30,"text":496,"correct":22},"BIM应用技术路线",{"key":34,"text":498,"correct":32},"BIM应用保障措施",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":313,"analysis":37},858255,"下列关于BIM与虚拟现实技术集成应用的说法正确的有()。",[503,505,507,509,511],{"key":20,"text":504,"correct":22},"在施工之前，施工过程就已通过BIM与虚拟施工技术进行三维仿真演示，可有效提升工程质量",{"key":24,"text":506,"correct":22},"BIM与虚拟施工技术在建筑施工领域的应用在未来的施工和设计的应用前景广阔",{"key":27,"text":508,"correct":22},"BIM与虚拟现实技术集成应用可以减少或避免设计中存在的大多数错误",{"key":30,"text":510,"correct":22},"BIM与虚拟现实技术集成应用可提高模拟的真实性",{"key":34,"text":512,"correct":22},"BIM与虚拟现实技术集成应用可有效支持项目成本管控",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":527,"analysis":37},858256,"下列选项中属于BIM技术主管岗位职责的是()。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"负责协同各BIM操作人员工作内容",{"key":24,"text":520,"correct":32},"负责BIM项目规划、管理和执行",{"key":27,"text":522,"correct":22},"负责将BIM项目经理的项目安排落实到BIM操作人员",{"key":30,"text":524,"correct":22},"负责对BIM项目在各个阶段实施过程中进行技术指导及监督",{"key":34,"text":526,"correct":32},"负责制定BIM工作计划负责设计环境的保障监督","ACD",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":185,"analysis":37},858257,"关于当前BIM市场的现状，下列表达中正确的是()。",[532,534,536,538,540],{"key":20,"text":533,"correct":32},"基于工程项目的具体要求，大量具有创新性的BIM软件、BIM产品以及BIM应用平台已经被推广应用",{"key":24,"text":535,"correct":22},"BIM技术应用覆盖面较窄，BIM技术在建筑工程项目的应用没有达到推广和普及层面",{"key":27,"text":537,"correct":22},"缺少专业的BIM工程师，BIM技术培训尚未达到较高水平",{"key":30,"text":539,"correct":22},"涉及项目的实战较少，缺少项目全生命周期运用BIM技术的案例及经验",{"key":34,"text":541,"correct":32},"BIM技术已经成熟应用于各种建设工程项目，包括民用建筑、工业建筑、公共建筑等",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":36,"analysis":37},858258,"下列选项中，关于5D施工管理软件的说法中正确的是()。",[546,548,550,552,554],{"key":20,"text":547,"correct":22},"可以进行施工模拟",{"key":24,"text":549,"correct":22},"支持施工过程结果跟踪和记录",{"key":27,"text":551,"correct":22},"支持施工流水段及工作面的划分",{"key":30,"text":553,"correct":32},"支持钢筋翻样",{"key":34,"text":555,"correct":22},"5D施工管理软件可以通过施工过程模拟，可以对各个时间阶段的施工内容和施工计划和物资需求进行分析",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":97,"analysis":37},858259,"BIM应用软件应具备的特征主要包括()。",[560,562,564,566,568],{"key":20,"text":561,"correct":22},"面向对象",{"key":24,"text":563,"correct":32},"功能完备性",{"key":27,"text":565,"correct":22},"基于三维几何模型",{"key":30,"text":567,"correct":22},"包含多种信息",{"key":34,"text":569,"correct":22},"支持开放式标准",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":36,"analysis":37},858260,"应分别独立设置的竖向管井有()。",[574,576,578,580,582],{"key":20,"text":575,"correct":22},"电缆井",{"key":24,"text":577,"correct":22},"管道井",{"key":27,"text":579,"correct":22},"加压送风井",{"key":30,"text":581,"correct":32},"排水井",{"key":34,"text":583,"correct":22},"垃圾道",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":52,"analysis":37},858261,"Revit软件的基本文件格式主要分为()。",[588,590,592,594,596],{"key":20,"text":589,"correct":22},"rte格式",{"key":24,"text":591,"correct":22},"rvt格式",{"key":27,"text":593,"correct":22},"rft格式",{"key":30,"text":595,"correct":22},"rfa格式",{"key":34,"text":597,"correct":32},"Revit格式",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":241,"analysis":37},858263,"需要手动添加到风管系统中的风管管件族有()。",[602,604,606,608,610],{"key":20,"text":603,"correct":32},"T形三通",{"key":24,"text":605,"correct":22},"Y形三通",{"key":27,"text":607,"correct":22},"斜四通",{"key":30,"text":609,"correct":32},"四通",{"key":34,"text":611,"correct":32},"弯头",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":256,"analysis":37},858264,"在Revit创建椭圆形风管时，风管选项栏可以设置以下哪些参数？()",[616,618,620,622,624],{"key":20,"text":617,"correct":32},"标高",{"key":24,"text":619,"correct":22},"偏移",{"key":27,"text":621,"correct":32},"直径",{"key":30,"text":623,"correct":22},"宽度",{"key":34,"text":625,"correct":22},"高度",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":185,"analysis":37},858265,"以下哪个说法是错误的？()",[630,632,634,636,638],{"key":20,"text":631,"correct":32},"控制族图元显示性和详细程度的最常用的方法是族图元可见性设置",{"key":24,"text":633,"correct":22},"对族文件管理时，一级根目录是按照族类型分类的",{"key":27,"text":635,"correct":22},"族样板文件的扩展名为“.rfa”",{"key":30,"text":637,"correct":22},"体量族属于系统族",{"key":34,"text":639,"correct":32},"族编辑器中的大多数视图中，工作平面是自动设置的，执行某些绘图操作及在特殊视图中启用某些工具时必须使用工作平面",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":241,"analysis":37},858266,"以下哪些项不是Revit提供的规程？()",[644,646,648,650,652],{"key":20,"text":645,"correct":32},"电气",{"key":24,"text":647,"correct":22},"暖通",{"key":27,"text":649,"correct":22},"给排水",{"key":30,"text":651,"correct":32},"机械",{"key":34,"text":653,"correct":32},"卫浴",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":313,"analysis":37},858267,"创建可载人族前，需要考虑哪些主要因素？()",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"族的插入点\u002F原点",{"key":24,"text":661,"correct":22},"族依附的主体",{"key":27,"text":663,"correct":22},"族的显示特性",{"key":30,"text":665,"correct":22},"族的详细程度",{"key":34,"text":667,"correct":22},"族的类型",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":112,"analysis":37},858268,"Revit视图有很多种形式，下列有关视图描述有误的是()。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"在立面中，已创建的楼层平面视图的标高标头显示为黑色",{"key":24,"text":675,"correct":22},"当不选择任何图元时，“属性”面板显示空白",{"key":27,"text":677,"correct":32},"Revit允许用户在楼层平面视图或天花板视图中创建任意立面视图",{"key":30,"text":679,"correct":22},"可以对平面、立面、三维视图进行放大、缩小、平移、旋转等操作",{"key":34,"text":681,"correct":32},"绘制详图索引的视图称之为父视图，如果删除父视图，则也将删除该详图索引视图",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":400,"analysis":37},858269,"在“编辑栏杆位置”中，主样式中的“对齐”包含以下哪些选项？()",[686,688,690,692,694],{"key":20,"text":687,"correct":32},"端点",{"key":24,"text":689,"correct":22},"起点",{"key":27,"text":691,"correct":22},"终点",{"key":30,"text":693,"correct":22},"中心",{"key":34,"text":695,"correct":22},"展开样式以匹配",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":710,"analysis":37},858270,"在幕墙放置竖梃时，可以选择以下哪些方式？()",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"拾取一条网格线",{"key":24,"text":703,"correct":22},"拾取单段网格线",{"key":27,"text":705,"correct":32},"除拾取外的全部网格线",{"key":30,"text":707,"correct":32},"按TAB键拾取的网格线",{"key":34,"text":709,"correct":22},"全部网格线","ABE",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":725,"analysis":37},858271,"幕墙类型属性对话框中连接条件的设置包含哪些？()",[715,717,719,721,723],{"key":20,"text":716,"correct":32},"自定义",{"key":24,"text":718,"correct":22},"垂直网格连续",{"key":27,"text":720,"correct":22},"水平网格连续",{"key":30,"text":722,"correct":32},"边界网格连续",{"key":34,"text":724,"correct":22},"边界和垂直网格连续","BCE",{"id":727,"libraryId":5,"type":15,"typeLabel":16,"stem":728,"options":729,"answer":36,"analysis":37},858272,"对象样式设置包含的类型有()。",[730,732,734,736,738],{"key":20,"text":731,"correct":22},"模型对象",{"key":24,"text":733,"correct":22},"注释对象",{"key":27,"text":735,"correct":22},"分析模型对象",{"key":30,"text":737,"correct":32},"视图对象",{"key":34,"text":739,"correct":22},"导入对象",[741,745,748,751,754,756],{"id":742,"name":743,"category":7,"favorite":744},1,"领导干部任职前廉政法规知识测试题",92,{"id":746,"name":747,"category":7,"favorite":742},595,"建筑结构与设备",{"id":749,"name":750,"category":7,"favorite":742},715,"招标采购专业知识与法律法规",{"id":752,"name":753,"category":7,"favorite":742},848,"市政方向-通用基础",{"id":755,"name":6,"category":7,"favorite":8},534,{"id":757,"name":758,"category":7,"favorite":8},536,"安全人A证"]