[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":709},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,20,50,1302,[13,34,46,58,70,82,93,105,117,129,141,153,165,177,195,210,224,238,252,266,281,296,311,326,341,355,370,384,398,412,426,440,455,468,483,498,512,526,541,555,569,583,597,612,626,640,654,668,682,695],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},858170,1,"单选题","下列选项中，负责应用BIM支持和完成工程项目生命周期过程中各专业任务的专业人员的工程师岗位的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","BIM工具研发类工程师",false,{"key":24,"text":25,"correct":26},"B","BIM工程应用类工程师",true,{"key":28,"text":29,"correct":22},"C","BIM标准管理类工程师",{"key":31,"text":32,"correct":22},"D","BIM教育类工程师","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},858171,"地沟平面图是属于()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"总平面图",{"key":24,"text":41,"correct":26},"建筑施工图",{"key":28,"text":43,"correct":22},"结构施工图",{"key":31,"text":45,"correct":22},"设备施工图",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},858172,"在《建筑工程设计信息模型交付标准》中建议初步设计阶段模型精细度应为()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"100LOD",{"key":24,"text":53,"correct":22},"200LOD",{"key":28,"text":55,"correct":26},"300LOD",{"key":31,"text":57,"correct":22},"400LOD",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},858173,"施工动态监测是对施工过程进行实时施工监测，特别是重要部位和关键工序，可以及时了解施工过程中结构的受力和运行状态。它是属于()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"进度管理",{"key":24,"text":65,"correct":22},"成本管理",{"key":28,"text":67,"correct":22},"绿色施工管理",{"key":31,"text":69,"correct":26},"安全管理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},858174,"基于BIM技术的成本预算软件是属于()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"基础软件",{"key":24,"text":77,"correct":22},"核心建模软件",{"key":28,"text":79,"correct":26},"应用软件",{"key":31,"text":81,"correct":22},"平台软件",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},858175,"将新建房屋及其附近一定范围内的建筑物、构筑物、室外场地、道路和绿化布置的总体情况，用水平投影的方法绘制而成的图样指的是()。",[86,87,89,91],{"key":20,"text":39,"correct":26},{"key":24,"text":88,"correct":22},"建筑图",{"key":28,"text":90,"correct":22},"结构图",{"key":31,"text":92,"correct":22},"地沟平面图",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},858176,"BIM信息的保持特征表示该信息必须保留的()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"用途",{"key":24,"text":100,"correct":26},"时间",{"key":28,"text":102,"correct":22},"方式",{"key":31,"text":104,"correct":22},"位置",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},858177,"下列选项中，属于软件间的单向直接互用的是()。 A.BIM建模软件(Revit)与结构分析软件(ETABS)",[109,111,113,115],{"key":20,"text":110,"correct":22},"BIM建模软件(Revit)与碰撞检测软件(Navisworks)",{"key":24,"text":112,"correct":22},"BIM建模软件(Revit)与可视化软件(Artlantis)",{"key":28,"text":114,"correct":26},"中间文件(DW",{"key":31,"text":116,"correct":22},"与算量软件(鲁班)",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},858178,"下列选项关于信息提交过程中信息状态的说法正确的是()。",[121,123,125,127],{"key":20,"text":122,"correct":26},"信息状态指的是提交信息的版本",{"key":24,"text":124,"correct":22},"信息状态指的是信息提交后是否需要被修改",{"key":28,"text":126,"correct":22},"信息状态指的是该信息必须保留的时间",{"key":31,"text":128,"correct":22},"信息状态指的是该信息所占内存大小",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},858179,"BIM模型的关联性构建和自动化统计特性，对维护运营管理信息的()和数据统计的便捷化作出了贡献。",[133,135,137,139],{"key":20,"text":134,"correct":22},"全面性",{"key":24,"text":136,"correct":26},"一致性",{"key":28,"text":138,"correct":22},"深度",{"key":31,"text":140,"correct":22},"精度",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},858180,"在建筑总平面图中，计划扩建的预留地用什么线型表示()。",[145,147,149,151],{"key":20,"text":146,"correct":22},"细实线",{"key":24,"text":148,"correct":22},"粗实线",{"key":28,"text":150,"correct":22},"点画线",{"key":31,"text":152,"correct":26},"中粗虚线",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},858181,"BIM节能减排管理协调通过BIM结合()的应用，使得日常能源管理监控变得更加方便。",[157,159,161,163],{"key":20,"text":158,"correct":26},"物联网技术",{"key":24,"text":160,"correct":22},"三维技术",{"key":28,"text":162,"correct":22},"设备分析",{"key":31,"text":164,"correct":22},"成本控制",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},858182,"BIM技术在()方面的应用主要体现在钢筋准确下料、构建信息查询及出具构件加工详图上。",[169,171,173,175],{"key":20,"text":170,"correct":26},"预制加工管理",{"key":24,"text":172,"correct":22},"施工方案管理",{"key":28,"text":174,"correct":22},"施工进度管理",{"key":31,"text":176,"correct":22},"施工安全管理",{"id":178,"libraryId":5,"type":179,"typeLabel":180,"stem":181,"options":182,"answer":194,"analysis":33},858183,2,"多选题","将()结合起来，实现基于BIM的施工过程结构安全分析，能有效捕捉施工过程中可能存在的危险状态，指导安全维护措施的编制和执行，防止发生安全事故。",[183,185,187,189,191],{"key":20,"text":184,"correct":26},"BIM",{"key":24,"text":186,"correct":26},"4D技术",{"key":28,"text":188,"correct":22},"GIS",{"key":31,"text":190,"correct":22},"VR",{"key":192,"text":193,"correct":26},"E","时变结构分析方法","ABE",{"id":196,"libraryId":5,"type":179,"typeLabel":180,"stem":197,"options":198,"answer":209,"analysis":33},858184,"下列选项属于建筑工程项目方案策划阶段中的BIM应用的是()。",[199,201,203,205,207],{"key":20,"text":200,"correct":26},"现状建模",{"key":24,"text":202,"correct":26},"成本核算",{"key":28,"text":204,"correct":26},"场地分析",{"key":31,"text":206,"correct":22},"结构选型",{"key":192,"text":208,"correct":26},"总体规划","ABCE",{"id":211,"libraryId":5,"type":179,"typeLabel":180,"stem":212,"options":213,"answer":209,"analysis":33},858185,"下列选项中，属于BIM平台软件特性的是()。",[214,216,218,220,222],{"key":20,"text":215,"correct":26},"支持模型数据的远程网络访问",{"key":24,"text":217,"correct":26},"支持模型文件的在线浏览功能",{"key":28,"text":219,"correct":26},"支持变更清单汇总统计",{"key":31,"text":221,"correct":22},"支持模型数据的签入签出及版本管理",{"key":192,"text":223,"correct":26},"支持工程项目模型文件管理",{"id":225,"libraryId":5,"type":179,"typeLabel":180,"stem":226,"options":227,"answer":194,"analysis":33},858186,"下列选项中，属于私有公司的文件格式的是()。",[228,230,232,234,236],{"key":20,"text":229,"correct":26},"DWG",{"key":24,"text":231,"correct":26},"NWC",{"key":28,"text":233,"correct":22},"IFC",{"key":31,"text":235,"correct":22},"COBIE",{"key":192,"text":237,"correct":26},"GFC",{"id":239,"libraryId":5,"type":179,"typeLabel":180,"stem":240,"options":241,"answer":251,"analysis":33},858187,"BIM为项目设计阶段专业协调提供的途径主要包括()。",[242,244,246,248,250],{"key":20,"text":243,"correct":26},"协同设计",{"key":24,"text":245,"correct":22},"施工模拟",{"key":28,"text":247,"correct":26},"碰撞检查",{"key":31,"text":249,"correct":22},"性能分析",{"key":192,"text":204,"correct":22},"AC",{"id":253,"libraryId":5,"type":179,"typeLabel":180,"stem":254,"options":255,"answer":251,"analysis":33},858188,"下列选项属于BIM基础软件的是()。",[256,258,260,262,264],{"key":20,"text":257,"correct":26},"BIM概念设计软件",{"key":24,"text":259,"correct":22},"BIM建筑性能分析软件",{"key":28,"text":261,"correct":26},"BIM核心建模软件",{"key":31,"text":263,"correct":22},"BIM深化设计软件",{"key":192,"text":265,"correct":22},"BIM算量软件",{"id":267,"libraryId":5,"type":179,"typeLabel":180,"stem":268,"options":269,"answer":280,"analysis":33},858189,"基于BIM的建筑性能化分析包含()。",[270,272,274,276,278],{"key":20,"text":271,"correct":26},"室外风环境模拟",{"key":24,"text":273,"correct":26},"自然采光模拟",{"key":28,"text":275,"correct":26},"室内自然通风模拟",{"key":31,"text":277,"correct":26},"小区热环境模拟分析",{"key":192,"text":279,"correct":22},"建筑结构计算分析","ABCD",{"id":282,"libraryId":5,"type":179,"typeLabel":180,"stem":283,"options":284,"answer":295,"analysis":33},858190,"基于BIM技术的算量软件具有以下特征()。",[285,287,289,291,293],{"key":20,"text":286,"correct":26},"基于三维模型进行工程量计算",{"key":24,"text":288,"correct":26},"支持按计算规则自动算量",{"key":28,"text":290,"correct":26},"支持三维模型数据交换标准",{"key":31,"text":292,"correct":22},"支持绘制出图",{"key":192,"text":294,"correct":22},"支持性能分析","ABC",{"id":297,"libraryId":5,"type":179,"typeLabel":180,"stem":298,"options":299,"answer":310,"analysis":33},858191,"下列选项属于4D施工进度模拟内容的是()。",[300,302,304,306,308],{"key":20,"text":301,"correct":26},"基于BIM模型，对工程重点和难点的部位进行分析，制定切实可行的对策",{"key":24,"text":303,"correct":26},"依据模型，确定方案，排定计划，划分流水段",{"key":28,"text":305,"correct":22},"附加力学性能，实现对施工方案的动态模拟",{"key":31,"text":307,"correct":26},"将周和月结合在一起，假设后期需要任何时间段的计划，只需在这个计划中过滤一下即可自动生成",{"key":192,"text":309,"correct":26},"做到对现场的施工进度进行每日管理","ABDE",{"id":312,"libraryId":5,"type":179,"typeLabel":180,"stem":313,"options":314,"answer":325,"analysis":33},858192,"下列选项中，属于BIM技术相对二维CAD技术优势的有()。",[315,317,319,321,323],{"key":20,"text":316,"correct":22},"模型的基本元素为点、线、面",{"key":24,"text":318,"correct":26},"只需进行一次修改，则与之相关的平面、立面、剖面、三维视图、明细表都自动修改",{"key":28,"text":320,"correct":26},"各个构件是相互关联的，例如删除墙上的门，墙会自动恢复为完整的墙",{"key":31,"text":322,"correct":26},"所有图元均为参数化建筑构件，附有建筑属性",{"key":192,"text":324,"correct":22},"建筑物的整体修改需要对建筑物各投影面依次进行人工修改","BCD",{"id":327,"libraryId":5,"type":179,"typeLabel":180,"stem":328,"options":329,"answer":340,"analysis":33},858193,"下列选项中，属于2015年住房和城乡建设部规定的2020年BIM技术发展目标的是()。",[330,332,334,336,338],{"key":20,"text":331,"correct":26},"建筑行业甲级设计单位",{"key":24,"text":333,"correct":22},"建筑行业乙级设计单位",{"key":28,"text":335,"correct":26},"特级房屋建筑工程施工企业",{"key":31,"text":337,"correct":26},"建筑行业甲级勘察单位",{"key":192,"text":339,"correct":26},"一级房屋建筑工程施工企业","ACDE",{"id":342,"libraryId":5,"type":179,"typeLabel":180,"stem":343,"options":344,"answer":209,"analysis":33},858194,"下列选项属于结构平面布置图所表达的内容的有()。",[345,347,349,351,353],{"key":20,"text":346,"correct":26},"与建筑图一致的轴线网及墙、柱、梁等位置、编号",{"key":24,"text":348,"correct":26},"预制板的跨度方向、板号、数量、预留孔洞位置及其尺寸",{"key":28,"text":350,"correct":26},"钢筋平面布置",{"key":31,"text":352,"correct":22},"桩详图",{"key":192,"text":354,"correct":26},"板面标高",{"id":356,"libraryId":5,"type":179,"typeLabel":180,"stem":357,"options":358,"answer":369,"analysis":33},858195,"下列选项关于《建筑工程设计信息模型分类和编码》中相关规定说法正确的是()。",[359,361,363,365,367],{"key":20,"text":360,"correct":26},"建筑信息模型分类对象应包括建筑工程中的建设资源、建设进程、建设成果",{"key":24,"text":362,"correct":22},"建筑信息模型分类表代码应采用两位数字表示，单个分类表内各层级代码应采用两位数字表示，各代码之间用英文“—”隔开",{"key":28,"text":364,"correct":22},"分类对象编码由表编码、大类代码、中类代码、小类代码、细类代码组成，表编码与分类对象编码之间用“.”连接",{"key":31,"text":366,"correct":26},"增加类目和编码时标准中已规定的类目和编码应保持不变",{"key":192,"text":368,"correct":22},"“\u002F”用于将同一表格或不同表格中的编码联合在一起，以表示两个或两个以上编码含义的集合","AD",{"id":371,"libraryId":5,"type":179,"typeLabel":180,"stem":372,"options":373,"answer":340,"analysis":33},858196,"1997年1月发布的IFC1.0重点定义了四个工业应用领域，包括()。",[374,376,378,380,382],{"key":20,"text":375,"correct":26},"建筑",{"key":24,"text":377,"correct":22},"车辆工程",{"key":28,"text":379,"correct":26},"HAVC工程",{"key":31,"text":381,"correct":26},"工程管理",{"key":192,"text":383,"correct":26},"设备管理",{"id":385,"libraryId":5,"type":179,"typeLabel":180,"stem":386,"options":387,"answer":295,"analysis":33},858197,"BIM与物联网集成应用，实际上是建筑全过程信息的集成与融合，下列选项中属于BIM技术所承担的功能是()。",[388,390,392,394,396],{"key":20,"text":389,"correct":26},"信息的集成",{"key":24,"text":391,"correct":26},"信息的交互",{"key":28,"text":393,"correct":26},"信息的展示",{"key":31,"text":395,"correct":22},"信息的感知",{"key":192,"text":397,"correct":22},"信息的采集",{"id":399,"libraryId":5,"type":179,"typeLabel":180,"stem":400,"options":401,"answer":325,"analysis":33},858198,"BIM组织架构一般主要分为()。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"政府层",{"key":24,"text":405,"correct":26},"领导层",{"key":28,"text":407,"correct":26},"管理层",{"key":31,"text":409,"correct":26},"作业层",{"key":192,"text":411,"correct":22},"企业层",{"id":413,"libraryId":5,"type":179,"typeLabel":180,"stem":414,"options":415,"answer":280,"analysis":33},858199,"下列选项中属于BIM工程应用类工程师的是()。",[416,418,420,422,424],{"key":20,"text":417,"correct":26},"BIM信息应用人员",{"key":24,"text":419,"correct":26},"BIM数据维护人员",{"key":28,"text":421,"correct":26},"BIM模型生产人员",{"key":31,"text":423,"correct":26},"BIM产品设计人员",{"key":192,"text":425,"correct":22},"BIM系统管理人员",{"id":427,"libraryId":5,"type":179,"typeLabel":180,"stem":428,"options":429,"answer":369,"analysis":33},858200,"目前碰撞检查软件与设计软件的互动方式主要可分为()。",[430,432,434,436,438],{"key":20,"text":431,"correct":26},"通过软件之间的通信。在同一台计算机上的碰撞检查软件与设计软件进行直接通信，在设计软件中定位发生碰撞的构件",{"key":24,"text":433,"correct":22},"通过碰撞结果数据的输入。碰撞检测结果导出为数据表格，通过在设计软件中位置数据的输入从而对碰撞点进行定位",{"key":28,"text":435,"correct":22},"通过第三方软件的传递转化。将碰撞结果导人第三方软件中进行转化处理，再导人设计软件中",{"key":31,"text":437,"correct":26},"通过碰撞结果文件的互动。碰撞检测的结果导出为结果文件，在设计软件中加载该结果文件，定位发生碰撞的构件",{"key":192,"text":439,"correct":22},"通过图像观测识别。基于三维BIM模型专业人员对模型碰撞点及碰撞情况进行观察，而后在设计软件中根据观察结果对模型进行更新",{"id":441,"libraryId":5,"type":179,"typeLabel":180,"stem":442,"options":443,"answer":454,"analysis":33},858201,"IFC在中国的应用领域会很多，针对当前需求，主要在()。",[444,446,448,450,452],{"key":20,"text":445,"correct":26},"企业应用平台",{"key":24,"text":447,"correct":26},"电子政务",{"key":28,"text":449,"correct":22},"通信技术",{"key":31,"text":451,"correct":22},"影视传媒",{"key":192,"text":453,"correct":22},"交通运输","AB",{"id":456,"libraryId":5,"type":179,"typeLabel":180,"stem":457,"options":458,"answer":467,"analysis":33},858202,"下列岗位中不属于BIM标准管理类工程师的是()。",[459,461,463,465,466],{"key":20,"text":460,"correct":22},"BIM基础理论研究人员",{"key":24,"text":462,"correct":26},"BIM软件开发人员",{"key":28,"text":464,"correct":22},"BIM标准研究人员",{"key":31,"text":419,"correct":26},{"key":192,"text":417,"correct":26},"BDE",{"id":469,"libraryId":5,"type":179,"typeLabel":180,"stem":470,"options":471,"answer":482,"analysis":33},858203,"下列选项中，对于项目管理方而言，BIM施工仿真可有助于了解整个施工过程中的()。",[472,474,476,478,480],{"key":20,"text":473,"correct":26},"时间节点",{"key":24,"text":475,"correct":22},"成本估算",{"key":28,"text":477,"correct":26},"安装工序",{"key":31,"text":479,"correct":26},"安装难点",{"key":192,"text":481,"correct":22},"方案比较","ACD",{"id":484,"libraryId":5,"type":179,"typeLabel":180,"stem":485,"options":486,"answer":497,"analysis":33},858204,"BIM模型生产工程师的岗位职责主要包括()。",[487,489,491,493,495],{"key":20,"text":488,"correct":26},"建立场地模型",{"key":24,"text":490,"correct":26},"建立土建模型",{"key":28,"text":492,"correct":26},"建立机电模型",{"key":31,"text":494,"correct":26},"建立幕墙模型",{"key":192,"text":496,"correct":26},"建立安全模型","ABCDE",{"id":499,"libraryId":5,"type":179,"typeLabel":180,"stem":500,"options":501,"answer":369,"analysis":33},858205,"BIM技术具有单一工程数据源，是项目实施的共享数据平台，可解决分布式、异构工程数据之间的()。",[502,504,506,508,510],{"key":20,"text":503,"correct":26},"一致性问题",{"key":24,"text":505,"correct":22},"施工问题",{"key":28,"text":507,"correct":22},"运营维护问题",{"key":31,"text":509,"correct":26},"全局共享问题",{"key":192,"text":511,"correct":22},"造价问题",{"id":513,"libraryId":5,"type":179,"typeLabel":180,"stem":514,"options":515,"answer":497,"analysis":33},858206,"下列选项中，属于BIM技术业主用以实施对租户信息的调整和更新的数据包括()。",[516,518,520,522,524],{"key":20,"text":517,"correct":26},"租户名称",{"key":24,"text":519,"correct":26},"物业管理情况",{"key":28,"text":521,"correct":26},"租金情况",{"key":31,"text":523,"correct":26},"租约区间",{"key":192,"text":525,"correct":26},"建筑面积",{"id":527,"libraryId":5,"type":179,"typeLabel":180,"stem":528,"options":529,"answer":540,"analysis":33},858207,"建筑物的定位方式可分为()。",[530,532,534,536,538],{"key":20,"text":531,"correct":26},"尺寸定位",{"key":24,"text":533,"correct":22},"原点定位",{"key":28,"text":535,"correct":22},"中心定位",{"key":31,"text":537,"correct":22},"手动定位",{"key":192,"text":539,"correct":26},"坐标网式定位","AE",{"id":542,"libraryId":5,"type":179,"typeLabel":180,"stem":543,"options":544,"answer":295,"analysis":33},858208,"硬件资源配置主要体现在()几个阶段。",[545,547,549,551,553],{"key":20,"text":546,"correct":26},"模型信息创建",{"key":24,"text":548,"correct":26},"数据存储管理",{"key":28,"text":550,"correct":26},"数据信息共享",{"key":31,"text":552,"correct":22},"数据归类",{"key":192,"text":554,"correct":22},"项目交付",{"id":556,"libraryId":5,"type":179,"typeLabel":180,"stem":557,"options":558,"answer":497,"analysis":33},858209,"下列选项中，属于BIM技术的可出图性功能的是()。",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"建筑平面图的输出",{"key":24,"text":562,"correct":26},"建筑立面图的输出",{"key":28,"text":564,"correct":26},"建筑详图的输出",{"key":31,"text":566,"correct":26},"碰撞报告",{"key":192,"text":568,"correct":26},"构件加工图",{"id":570,"libraryId":5,"type":179,"typeLabel":180,"stem":571,"options":572,"answer":209,"analysis":33},858210,"基于BIM技术，重点从()等方面进行施工节材与材料资源利用控制。",[573,575,577,579,581],{"key":20,"text":574,"correct":26},"钢材",{"key":24,"text":576,"correct":26},"混凝土",{"key":28,"text":578,"correct":26},"模板",{"key":31,"text":580,"correct":22},"场地",{"key":192,"text":582,"correct":26},"生活办公用品",{"id":584,"libraryId":5,"type":179,"typeLabel":180,"stem":585,"options":586,"answer":325,"analysis":33},858211,"在进行信息提交的过程中需要对信息的主要特性进行定义，包括()。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"作用",{"key":24,"text":590,"correct":26},"状态",{"key":28,"text":592,"correct":26},"类型",{"key":31,"text":594,"correct":26},"保持",{"key":192,"text":596,"correct":22},"维护",{"id":598,"libraryId":5,"type":179,"typeLabel":180,"stem":599,"options":600,"answer":611,"analysis":33},858212,"下列选项中，可用于建筑物性能仿真分析的虚拟建筑模型建筑信息有()。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"参数化信息",{"key":24,"text":604,"correct":22},"一体化信息",{"key":28,"text":606,"correct":26},"几何信息",{"key":31,"text":608,"correct":26},"材料性能",{"key":192,"text":610,"correct":26},"构建属性","CDE",{"id":613,"libraryId":5,"type":179,"typeLabel":180,"stem":614,"options":615,"answer":280,"analysis":33},858213,"下列选项中，关于碰撞检查软件的说法正确的是()。",[616,618,620,622,624],{"key":20,"text":617,"correct":26},"碰撞检查软件与设计软件的互动分为通过软件之间的通信和通过碰撞结果文件进行的通信",{"key":24,"text":619,"correct":26},"通过软件之间的通信可在同一台计算机上的碰撞检查软件与设计软件进行直播通信，在设计软件中定位发生碰撞的构件",{"key":28,"text":621,"correct":26},"MagiCAD碰撞检查模块属于MagiCAD的一个功能模块，将碰撞检查与调整优化集成在同一个软件中，处理机电系统内部碰撞效率很高",{"key":31,"text":623,"correct":26},"将碰撞检测的结果导出为结果文件，在设计软件中加载该结果文件，可以定位发生碰撞的构件",{"key":192,"text":625,"correct":22},"Navisworks支持市面上常见的BIM建模工具，“硬碰撞”和“软碰撞”检测功能成熟",{"id":627,"libraryId":5,"type":179,"typeLabel":180,"stem":628,"options":629,"answer":295,"analysis":33},858214,"项目BIM实施与应用指的是基于BIM技术对项目进行()管理的过程。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"信息化",{"key":24,"text":633,"correct":26},"集成化",{"key":28,"text":635,"correct":26},"协同化",{"key":31,"text":637,"correct":22},"自动化",{"key":192,"text":639,"correct":22},"单一性",{"id":641,"libraryId":5,"type":179,"typeLabel":180,"stem":642,"options":643,"answer":194,"analysis":33},858215,"下列选项中，设备的运行监控对建筑物设备的管理功能包括()。",[644,646,648,650,652],{"key":20,"text":645,"correct":26},"搜索功能",{"key":24,"text":647,"correct":26},"定位功能",{"key":28,"text":649,"correct":22},"进度检查功能",{"key":31,"text":651,"correct":22},"施工模拟功能",{"key":192,"text":653,"correct":26},"信息查询功能",{"id":655,"libraryId":5,"type":179,"typeLabel":180,"stem":656,"options":657,"answer":209,"analysis":33},858216,"设备施工图按专业不同，可分为()。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"给水排水图",{"key":24,"text":661,"correct":26},"电气图",{"key":28,"text":663,"correct":26},"弱电图",{"key":31,"text":665,"correct":22},"采光图",{"key":192,"text":667,"correct":26},"动力图",{"id":669,"libraryId":5,"type":179,"typeLabel":180,"stem":670,"options":671,"answer":497,"analysis":33},858217,"下列选项中属于BIM战略总监岗位职责的是()。",[672,674,676,678,680],{"key":20,"text":673,"correct":26},"负责企业的BIM总体发展战略的确定",{"key":24,"text":675,"correct":26},"负责BIM组织实施机构的构建",{"key":28,"text":677,"correct":26},"负责BIM实施计划的制定",{"key":31,"text":679,"correct":26},"负责BIM实施流程优化",{"key":192,"text":681,"correct":26},"负责确定BIM技术路线",{"id":683,"libraryId":5,"type":179,"typeLabel":180,"stem":684,"options":685,"answer":325,"analysis":33},858218,"BIM技术在设计阶段中设计分析包括()。",[686,687,689,691,693],{"key":20,"text":243,"correct":22},{"key":24,"text":688,"correct":26},"节能分析",{"key":28,"text":690,"correct":26},"安全疏散分析",{"key":31,"text":692,"correct":26},"结构分析",{"key":192,"text":694,"correct":22},"资产设备分析",{"id":696,"libraryId":5,"type":179,"typeLabel":180,"stem":697,"options":698,"answer":209,"analysis":33},858219,"下列选项关于《建筑工程设计信息模型分类和编码标准》中编码的运算符号说法正确的是()。",[699,701,703,705,707],{"key":20,"text":700,"correct":26},"“＋”用于将同一表格或不同表格中的编码联合在一起，以表示两个或两个以上编码含义的集合",{"key":24,"text":702,"correct":26},"“\u002F”用于将单个表格中的编码联合在一起，定义一个表内的连续编码段落，以表示适合对象的分类区间",{"key":28,"text":704,"correct":26},"“＜”、“＞”用于将同一表格或不同表格中的编码联合在一起，以表示两个或两个以上编码对象的从属或主次关系，开口背对是开口正对编码所表示对象的一部分",{"key":31,"text":706,"correct":22},"“&”用于将不同类别的编码联合在一起，以表示两个或两个以上编码对象的并列关系",{"key":192,"text":708,"correct":26},"由单个编码和组合编码构成的编码集合，应先对由“\u002F”联合的组合编码进行归档，再对单个编码进行归档，之后对由“+”联合的组合编码进行归档，最后对由“＜”、“＞”联合的组合编码进行归档",[710,713,716,719,722,724],{"id":15,"name":711,"category":7,"favorite":712},"领导干部任职前廉政法规知识测试题",92,{"id":714,"name":715,"category":7,"favorite":15},595,"建筑结构与设备",{"id":717,"name":718,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":720,"name":721,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":723,"name":6,"category":7,"favorite":8},534,{"id":725,"name":726,"category":7,"favorite":8},536,"安全人A证"]