[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,2,50,1302,[13,34,46,58,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,428,440,448,460,472,484,496,507,519,531,543,555,563,575,587,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},857252,1,"单选题","下列不属于BIM技术在运维阶段中的应用的是()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","租赁管理",false,{"key":24,"text":25,"correct":22},"B","资产设备管理",{"key":27,"text":28,"correct":29},"C","工程量自动统计",true,{"key":31,"text":32,"correct":22},"D","能耗管理","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},857253,"目前在国内BIM的全称为()。",[38,40,42,44],{"key":20,"text":39,"correct":29},"建筑信息模型",{"key":24,"text":41,"correct":22},"建设信息模型",{"key":27,"text":43,"correct":22},"建筑信息模拟",{"key":31,"text":45,"correct":22},"建设信息模拟",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},857254,"下列选项中政府强制要求使用BIM的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"美国",{"key":24,"text":53,"correct":29},"英国",{"key":27,"text":55,"correct":22},"韩国",{"key":31,"text":57,"correct":22},"日本",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},857255,"租赁管理属于BIM技术在运维阶段()中的应用。",[62,64,66,68],{"key":20,"text":63,"correct":22},"资产管理",{"key":24,"text":65,"correct":29},"空间管理",{"key":27,"text":67,"correct":22},"公共安全管理",{"key":31,"text":32,"correct":22},{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":31,"analysis":33},857256,"()包含了为独立的专业领域的概念定义的实体，例如建筑、结构工程、设备管理等。它是IFC模型的最高级别层。",[73,75,77,79],{"key":20,"text":74,"correct":22},"资源层",{"key":24,"text":76,"correct":22},"核心层",{"key":27,"text":78,"correct":22},"共享层",{"key":31,"text":80,"correct":29},"领域层",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":24,"analysis":33},857257,"BIM可用于消除现场施工过程干扰或施工工艺冲突，利用BIM技术，通过搭建各专业BIM模型，设计师能够在()环境下发现并及时排除施工中可能遇到的碰撞与冲突。",[85,87,89,91],{"key":20,"text":86,"correct":22},"二维空间",{"key":24,"text":88,"correct":29},"三维空间",{"key":27,"text":90,"correct":22},"四维施工",{"key":31,"text":92,"correct":22},"五维成本",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":31,"analysis":33},857258,"下列选项关于《建筑工程设计信息模型交付标准》相关规定说法不正确的是()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"建筑工程信息模型的信息粒度与建模精度可不完全一致，应以模型信息作为优先采用的有效信息",{"key":24,"text":100,"correct":22},"在建筑工程信息模型全生命周期内，同一对象和参数的命名应保持前后一致",{"key":27,"text":102,"correct":22},"建筑工程信息模型精细度应由信息粒度和建模精度组成",{"key":31,"text":104,"correct":29},"在满足项目需求的前提下，宜采用较高的建模精细度",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":20,"analysis":33},857259,"2000年10月发布的()开发和应用的重要转变。其中，引入了模块化开发的框架和平台。",[109,111,113,115],{"key":20,"text":110,"correct":29},"IFC2x",{"key":24,"text":112,"correct":22},"IFC2.0",{"key":27,"text":114,"correct":22},"IFC1.5",{"key":31,"text":116,"correct":22},"IFC1.0",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":24,"analysis":33},857260,"设计主导管理模式是由业主委托一家设计单位，将拟建项目所需的BIM应用要求等以BIM合同的方式进行约定，由()建立BIM设计模型，并在项目实施过程中提供BIM技术指导、模型信息的更新与维护、BIM模型的应用管理等。",[121,123,125,127],{"key":20,"text":122,"correct":22},"业主单位",{"key":24,"text":124,"correct":29},"设计单位",{"key":27,"text":126,"correct":22},"施工单位",{"key":31,"text":128,"correct":22},"咨询单位",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},857261,"BIM施工安全与冲突分析系统应用中，时变结构和支撑体系的安全分析可通过模型数据转换机制，自动由4D施工信息模型生成()，进行施工期时变结构与支撑体系任意时间点的力学分析计算和安全性能评估。",[133,135,137,139],{"key":20,"text":134,"correct":22},"建筑性能分析模型",{"key":24,"text":136,"correct":22},"附有成本信息的BIM数据模型",{"key":27,"text":138,"correct":22},"深化设计模型",{"key":31,"text":140,"correct":29},"结构分析模型",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},857262,"根据《建筑工程设计信息模型分类和编码标准》，分类对象编码由表编码、大类代码、中类代码、小类代码、细类代码组成，细类编码采用()数字表示。",[145,147,149,151],{"key":20,"text":146,"correct":22},"1位",{"key":24,"text":148,"correct":22},"4位",{"key":27,"text":150,"correct":22},"6位",{"key":31,"text":152,"correct":29},"8位",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},857263,"按()划分可将BIM在项目管理中应用内容划分为人员管理、机具管理、材料管理、工法管理等",[157,159,161,163],{"key":20,"text":158,"correct":22},"工作阶段",{"key":24,"text":160,"correct":29},"工作对象",{"key":27,"text":162,"correct":22},"工作内容",{"key":31,"text":164,"correct":22},"工作目标",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":27,"analysis":33},857264,"IFC标准是一个类似面向对象的()。",[169,171,173,175],{"key":20,"text":170,"correct":22},"信息交换工具",{"key":24,"text":172,"correct":22},"数据处理器",{"key":27,"text":174,"correct":29},"建筑数据模型",{"key":31,"text":176,"correct":22},"协同工作模式",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},857265,"大型复杂的建筑工程设计要经过初步设计、施工图设计两个阶段，小型简单建筑工程设计只作()。",[181,183,185,187],{"key":20,"text":182,"correct":22},"初步设计",{"key":24,"text":184,"correct":29},"施工图设计",{"key":27,"text":186,"correct":22},"结构计算书",{"key":31,"text":188,"correct":22},"方案设计",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":27,"analysis":33},857266,"根据《建筑工程设计信息模型分类和编码标准》，何情况下，均应保持这样一个规则：无论使用大于号还是小于号，符号开口的方向()概念更重要的那个分类物项。",[193,195,197,199],{"key":20,"text":194,"correct":22},"必须背向",{"key":24,"text":196,"correct":22},"可背向",{"key":27,"text":198,"correct":29},"必须朝向",{"key":31,"text":200,"correct":22},"宜朝向",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},857267,"下列选项中不属于BIM发展中Level3的描述的是()。",[205,207,209,211],{"key":20,"text":206,"correct":22},"达到所谓的“OpenBIM”",{"key":24,"text":208,"correct":22},"使用一个在CDE环境中的共享性的项目模型",{"key":27,"text":210,"correct":29},"所有参与方都用各自的3D模型进行数据整合",{"key":31,"text":212,"correct":22},"避免了信息冲突的风险",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},857268,"下列关于BIM实施与应用说法不正确的是()。",[217,219,221,223],{"key":20,"text":218,"correct":22},"BIM实施目标即在建设项目中将要实施的主要价值和相应的BIM应用(任务)",{"key":24,"text":220,"correct":22},"BIM目标必须是具体的、可衡量的，以及能够促进建设项目的规划、设计、施工和运营成功进行的",{"key":27,"text":222,"correct":22},"BIM软件选择和使用流程确定是BIM技术路线制定的核心内容",{"key":31,"text":224,"correct":29},"在BIM实施规划过程中首先是BIM技术路线的选择，接着是实施目标的制定，最后是BIM应用内容的确定",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},857269,"钢筋翻样是在()的基础上进行钢筋的详细设计。",[229,231,233,235],{"key":20,"text":230,"correct":29},"结构模型",{"key":24,"text":232,"correct":22},"建筑模型",{"key":27,"text":234,"correct":22},"场地模型",{"key":31,"text":236,"correct":22},"机电模型",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":20,"analysis":33},857270,"下列选项中关于各BIM软件说法不正确的是()。",[241,243,245,247],{"key":20,"text":242,"correct":29},"BIM模型检查软件可以检查冲突与碰撞、模拟分析施工过程评估建造是否可行",{"key":24,"text":244,"correct":22},"BIM结构分析软件可将结构分析软件和BIM核心建模软件两者之间实现双向信息交换",{"key":27,"text":246,"correct":22},"BIM方案设计软件可以把业主设计任务书里面基于数字的项目要求转化成基于几何形体的建筑方案",{"key":31,"text":248,"correct":22},"BIM运营管理软件可以提高工作场所利用率，建立空间使用标准和基准，建立和谐的内部关系，减少纷争",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},857271,"()是指对要达到项目目标准备采取的技术手段、具体步骤及解决关键性问题的方法等在内的研究途径。",[253,255,257,259],{"key":20,"text":254,"correct":22},"BIM实施目标",{"key":24,"text":256,"correct":29},"BIM实施技术路线",{"key":27,"text":258,"correct":22},"BIM实施应用计划",{"key":31,"text":260,"correct":22},"BIM实施资源配置",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":24,"analysis":33},857272,"根据《建筑工程设计信息模型分类和编码标准》，建筑信息模型分类表代码应采用()数字表示",[265,267,269,271],{"key":20,"text":266,"correct":22},"一位",{"key":24,"text":268,"correct":29},"两位",{"key":27,"text":270,"correct":22},"三位",{"key":31,"text":272,"correct":22},"四位",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":27,"analysis":33},857273,"下列关于OpenBIM的描述中不正确的是()。",[277,279,281,283],{"key":20,"text":278,"correct":22},"一种开放资源的工作方式",{"key":24,"text":280,"correct":22},"一种基于公共标准和公共工作流程的工作方式",{"key":27,"text":282,"correct":29},"一种包含各种建设项目设计、施工、运营等阶段的公开的标准文件交换格式",{"key":31,"text":284,"correct":22},"一种可应用于建筑和合作性设计和施工的工作方式",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":27,"analysis":33},857274,"目前基于BIM的工程项目施工质量管理主要包括产品质量管理及()。",[289,291,293,295],{"key":20,"text":290,"correct":22},"机械设备质量管理",{"key":24,"text":292,"correct":22},"空气质量管理",{"key":27,"text":294,"correct":29},"技术质量管理",{"key":31,"text":296,"correct":22},"货物采购质量管理",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":27,"analysis":33},857275,"下列碰撞检查功能中，能够检查建筑与结构图纸中的标高、柱、剪力墙位置是否正确的功能是()。",[301,303,305,307],{"key":20,"text":302,"correct":22},"设备内部各专业碰撞",{"key":24,"text":304,"correct":22},"解决管线空间布局",{"key":27,"text":306,"correct":29},"建筑与结构专业的碰撞",{"key":31,"text":308,"correct":22},"建筑、结构专业与设备专业碰撞",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},857276,"下列选项不属于项目设计阶段中的BIM应用的是()。",[313,315,317,319],{"key":20,"text":314,"correct":22},"三维设计",{"key":24,"text":316,"correct":22},"协同设计",{"key":27,"text":318,"correct":29},"深化设计",{"key":31,"text":320,"correct":22},"节能分析",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":27,"analysis":33},857277,"钢筋混凝土构件详图是属于()。",[325,327,329,331],{"key":20,"text":326,"correct":22},"总平面图",{"key":24,"text":328,"correct":22},"建筑施工图",{"key":27,"text":330,"correct":29},"结构施工图",{"key":31,"text":332,"correct":22},"设备施工图",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},857278,"下列选项中，不属于BIM信息完备性包括的设计信息的是()。",[337,339,341,343],{"key":20,"text":338,"correct":22},"对象名称",{"key":24,"text":340,"correct":29},"施工材料",{"key":27,"text":342,"correct":22},"结构类型",{"key":31,"text":344,"correct":22},"建筑材料",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":27,"analysis":33},857279,"下列选项中，关于CDE的说法不正确的是()。",[349,351,353,355],{"key":20,"text":350,"correct":22},"CDE即公共数据环境",{"key":24,"text":352,"correct":22},"CDE是中心信息库",{"key":27,"text":354,"correct":29},"CDE的所有权由投资方持有",{"key":31,"text":356,"correct":22},"所有项目相关者都可以访问CDE",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},857280,"下列选项中，属于房地产开发公司在BIM造价方面责任的是()。",[361,363,365,367],{"key":20,"text":362,"correct":22},"负责配合设计各阶段计算投资",{"key":24,"text":364,"correct":29},"负责进度款拨付、结算",{"key":27,"text":366,"correct":22},"负责招标投标报价",{"key":31,"text":368,"correct":22},"负责施工过程中进度款申请、变更洽商、造价编制、工程结算等",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},857281,"基于BIM技术的施工场地布置软件支持三维数据交换标准，通过三维数据交换导入()，也可以将场地布置模型导出到后续的BIM工具软件中。",[373,375,377,379],{"key":20,"text":374,"correct":29},"拟建工程实体",{"key":24,"text":376,"correct":22},"进度管理数据",{"key":27,"text":378,"correct":22},"成本控制数据",{"key":31,"text":380,"correct":22},"设计软件",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},857282,"下列软件可用于建立能为多个BIM应用软件所使用的BIM数据的是()。",[385,387,389,391],{"key":20,"text":386,"correct":22},"BIM数据软件",{"key":24,"text":388,"correct":29},"BIM基础软件",{"key":27,"text":390,"correct":22},"BIM工具软件",{"key":31,"text":392,"correct":22},"BIM平台软件",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":27,"analysis":33},857283,"基于BIM技术的碰撞检查软件()，可以自由调整参与碰撞的构件的类型。",[397,399,401,403],{"key":20,"text":398,"correct":22},"支持三维模型导入",{"key":24,"text":400,"correct":22},"具有与设计软件交互的能力",{"key":27,"text":402,"correct":29},"支持不同的碰撞检查规则",{"key":31,"text":404,"correct":22},"具有高效的模型浏览效率",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},857284,"下列选项中，不属于设计院在BIM设计方面责任的是()。",[409,411,413,415],{"key":20,"text":410,"correct":29},"负责对基于BIM技术的设计方法进行研究和创新",{"key":24,"text":412,"correct":22},"负责建筑方案前期构思",{"key":27,"text":414,"correct":22},"负责三维设计可视化展示",{"key":31,"text":416,"correct":22},"负责协调设计及碰撞检查",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},857285,"BIM平台软件基于网络及数据库技术，将()连接到一起，以满足用户对于协同工作的需求。",[421,423,424,426],{"key":20,"text":422,"correct":22},"深化设计软件",{"key":24,"text":390,"correct":29},{"key":27,"text":425,"correct":22},"碰撞检测软件",{"key":31,"text":427,"correct":22},"钢筋翻样软件",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":24,"analysis":33},857286,"下列选项中，不属于BIM施工预施工特点的是()。",[432,434,436,438],{"key":20,"text":433,"correct":22},"消除施工的不确定性",{"key":24,"text":435,"correct":29},"通过深化设计，解决设计信息中没有体现的细节问题",{"key":27,"text":437,"correct":22},"降低施工风险",{"key":31,"text":439,"correct":22},"消除施工的不可预见性",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":27,"analysis":33},857287,"下列图例表示计划扩建的预留地或建筑物的是()。",[444,445,446,447],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":27,"text":27,"correct":29},{"key":31,"text":31,"correct":22},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},857288,"信息的输入者宜对建筑信息模型的文件或者信息条目添加数据状态标识，以表明交付的有效性，其中()表示已被工程参与方整体认可的有效整体交付数据，可作为阶段性有效成果。",[452,454,456,458],{"key":20,"text":453,"correct":22},"工作数据",{"key":24,"text":455,"correct":29},"共享数据",{"key":27,"text":457,"correct":22},"出版数据",{"key":31,"text":459,"correct":22},"存档数据",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":24,"analysis":33},857289,"《建筑工程设计信息模型交付标准》将使得国内各()能够在同一个数据体系下工作，从而能够进行广泛的数据交换和共享。",[464,466,468,470],{"key":20,"text":465,"correct":22},"业主",{"key":24,"text":467,"correct":29},"设计企业",{"key":27,"text":469,"correct":22},"施工企业",{"key":31,"text":471,"correct":22},"监理企业",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},857290,"在场地分析中，通过BIM结合()进行场地分析模拟，得出较好的分析数据，能够为设计单位后期设计提供最理想的场地规划、交通流线组织关系、建筑布局等关键决策。",[476,478,480,482],{"key":20,"text":477,"correct":22},"物联网",{"key":24,"text":479,"correct":29},"GIS",{"key":27,"text":481,"correct":22},"互联网",{"key":31,"text":483,"correct":22},"AR",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":20,"analysis":33},857291,"根据《建筑工程设计信息模型交付标准》，在满足项目需求且符合相关规定的前提下，宜采用()的建模精细度。",[488,490,492,494],{"key":20,"text":489,"correct":29},"较低",{"key":24,"text":491,"correct":22},"较高",{"key":27,"text":493,"correct":22},"最高",{"key":31,"text":495,"correct":22},"任意",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":24,"analysis":33},857292,"多专业协同、模型检测，是一个多专业协同检查过程，也可以称为()。",[500,502,504,505],{"key":20,"text":501,"correct":22},"模型整合",{"key":24,"text":503,"correct":29},"碰撞检查",{"key":27,"text":318,"correct":22},{"key":31,"text":506,"correct":22},"成本分析",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},857293,"领导层主要设置()，其主要负责该项目的对外沟通协调，包括与甲方互动沟通、与项目其他参与方协调等。",[511,513,515,517],{"key":20,"text":512,"correct":29},"项目经理",{"key":24,"text":514,"correct":22},"技术主管",{"key":27,"text":516,"correct":22},"建模工程师",{"key":31,"text":518,"correct":22},"咨询工程师",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},857294,"《建筑工程设计信息模型交付标准》为建筑信息模型提供统一的()，以促使国内各设计企业(团队)在同一数据体系之下工作与交流，并实施广泛的数据交换和共享。",[523,525,527,529],{"key":20,"text":524,"correct":29},"数据端口",{"key":24,"text":526,"correct":22},"建模进度",{"key":27,"text":528,"correct":22},"应用标准",{"key":31,"text":530,"correct":22},"成本管理",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":27,"analysis":33},857295,"下列选项中属于BIM几何造型软件的是()。",[535,537,539,541],{"key":20,"text":536,"correct":22},"3dmax",{"key":24,"text":538,"correct":22},"Xsteel",{"key":27,"text":540,"correct":29},"Rhino",{"key":31,"text":542,"correct":22},"lumion",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":31,"analysis":33},857296,"下列选项关于三面正投影图间存在的规律说法不正确的是()。",[547,549,551,553],{"key":20,"text":548,"correct":22},"长对正",{"key":24,"text":550,"correct":22},"高平齐",{"key":27,"text":552,"correct":22},"宽相等",{"key":31,"text":554,"correct":29},"形状相似",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":20,"analysis":33},857297,"下列四项IFC框架层中能被其中另外三层引用，属于IFC模型结构中最基本的是()。",[559,560,561,562],{"key":20,"text":74,"correct":29},{"key":24,"text":76,"correct":22},{"key":27,"text":78,"correct":22},{"key":31,"text":80,"correct":22},{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":24,"analysis":33},857298,"下列选项指的是在不同的模型精细度下，建筑工程信息模型所容纳的几何信息和非几何信息的单元大小和健全程度的是()。",[567,569,571,573],{"key":20,"text":568,"correct":22},"建模精度",{"key":24,"text":570,"correct":29},"信息粒度",{"key":27,"text":572,"correct":22},"建模几何精细度",{"key":31,"text":574,"correct":22},"模型发展程度",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":20,"analysis":33},857299,"()应表明管道走向、管径、坡度、管长、进出口(起点、末点，标高、各系统编号、各楼层卫生设备和工艺用水设备的连接点位置和标高)。",[579,581,583,585],{"key":20,"text":580,"correct":29},"管道系统图",{"key":24,"text":582,"correct":22},"管道平面图",{"key":27,"text":584,"correct":22},"局部设施图",{"key":31,"text":586,"correct":22},"详图",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":20,"analysis":33},857300,"下列选项中负责企业BIM发展及应用战略制作的是()。",[591,593,595,597],{"key":20,"text":592,"correct":29},"BIM战略总监",{"key":24,"text":594,"correct":22},"BIM操作人员",{"key":27,"text":596,"correct":22},"BIM技术主管",{"key":31,"text":598,"correct":22},"BIM项目经理",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":31,"analysis":33},857301,"现状建模主要利用BIM技术可为管理者提供()，以方便建设项目方案的分析、模拟，从而为整个项目的建设降低成本、缩短工期并提高质量。",[603,605,607,609],{"key":20,"text":604,"correct":22},"设计模型",{"key":24,"text":606,"correct":22},"详细的施工模型",{"key":27,"text":608,"correct":22},"成本信息模型",{"key":31,"text":610,"correct":29},"概要的现状模型",[612,615,618,621,624,626],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":6,"category":7,"favorite":8},534,{"id":627,"name":628,"category":7,"favorite":8},536,"安全人A证"]