[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-18":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,18,50,1302,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,357,369,381,393,405,417,429,441,453,465,477,488,500,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},858069,1,"单选题","某项目使用BIM技术实现IPD项目交付，IPD是一种先进的协议形式，下面哪一方不是参与制定IPD协议的？()",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","业主方",false,{"key":24,"text":25,"correct":22},"B","设计方",{"key":27,"text":28,"correct":29},"C","监理方",true,{"key":31,"text":32,"correct":22},"D","施工方","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},858070,"在碰撞检查后需要对碰撞的管道进行处理，在给水排水模块中，除了升降偏移的命令还有()的命令。",[38,40,42,44],{"key":20,"text":39,"correct":22},"手动升降",{"key":24,"text":41,"correct":29},"自动升降",{"key":27,"text":43,"correct":22},"手动偏移",{"key":31,"text":45,"correct":22},"自动偏移",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},858071,"下列技术中属于BIM技术的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"GIS",{"key":24,"text":53,"correct":22},"二维码",{"key":27,"text":55,"correct":29},"4D进度管理系统",{"key":31,"text":57,"correct":22},"会议室大屏中心",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},858072,"下面哪一项不属于结构初步设计模型内容()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"基础",{"key":24,"text":65,"correct":22},"结构楼板",{"key":27,"text":67,"correct":29},"框架柱",{"key":31,"text":69,"correct":22},"主要结构洞定位、尺寸",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},858073,"下面哪一项不是结构方案设计模型中的结构荷载信息？()",[74,76,78,80],{"key":20,"text":75,"correct":22},"温度荷载",{"key":24,"text":77,"correct":22},"楼面恒载",{"key":27,"text":79,"correct":29},"土压力",{"key":31,"text":81,"correct":22},"雪荷载",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},858074,"BIM在机电工程中施工组织设计流程第一项是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"毽立轴网标高",{"key":24,"text":89,"correct":22},"建立中心文件",{"key":27,"text":91,"correct":22},"建立本地文件",{"key":31,"text":93,"correct":29},"建立项目样板",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},858075,"工作集协同绘图方式是将所有人的修改成果通过()的方式保存在中央服务器上。",[98,100,102,104],{"key":20,"text":99,"correct":29},"网络共享文件夹",{"key":24,"text":101,"correct":22},"移动存储设备",{"key":27,"text":103,"correct":22},"云端存储",{"key":31,"text":105,"correct":22},"本地硬盘存储器",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},858076,"在机房工程的管道综合排布中，下面哪一项为最优先排布？()",[110,112,114,116],{"key":20,"text":111,"correct":22},"通风管道",{"key":24,"text":113,"correct":22},"电气桥架",{"key":27,"text":115,"correct":29},"空调水管道",{"key":31,"text":117,"correct":22},"喷淋管道",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},858078,"项目管理者在设置完成工作集之后，将工作的权限释放，即设置所有的工作集()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"可编辑",{"key":24,"text":125,"correct":29},"不可编辑",{"key":27,"text":127,"correct":22},"可复制",{"key":31,"text":129,"correct":22},"不可复制",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},858079,"混凝土运送料单上打印载有混凝土运送信息的二维码，下面哪一项不是二维码里包含的信息？()",[134,136,138,140],{"key":20,"text":135,"correct":22},"强度等级",{"key":24,"text":137,"correct":22},"坍落度",{"key":27,"text":139,"correct":22},"生产单位",{"key":31,"text":141,"correct":29},"生产时间",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},858080,"风管绘制完成后，将风管进行连接，打开风系统的“风管连接”对话框可以进行()根风管的连接。",[146,148,150,152],{"key":20,"text":147,"correct":22},"1～2",{"key":24,"text":149,"correct":22},"2～3",{"key":27,"text":151,"correct":29},"2～4",{"key":31,"text":153,"correct":22},"3～5",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},858081,"将不同系统的多条风管按各自系统自动连接的命令是()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"风管连接",{"key":24,"text":161,"correct":22},"自动连接",{"key":27,"text":163,"correct":22},"批量连接",{"key":31,"text":165,"correct":29},"分类连接",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},858082,"BIM的5D是在4D建筑信息模型基础上，融入()信息。",[170,172,174,176],{"key":20,"text":171,"correct":29},"成本造价信息",{"key":24,"text":173,"correct":22},"合同成本信息",{"key":27,"text":175,"correct":22},"项目团队信息",{"key":31,"text":177,"correct":22},"质量控制信息",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},858083,"在材料统计命令中，除了可以用图面选择的方式进行统计，还可以用()的方式进行统计。",[182,184,186,188],{"key":20,"text":183,"correct":22},"手动修改",{"key":24,"text":185,"correct":22},"手动设置",{"key":27,"text":187,"correct":22},"手动统计",{"key":31,"text":189,"correct":29},"条件设置自动统计",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},858084,"BIM在项目管理过程中不能实现的功能是()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"碰撞检查及设计优化",{"key":24,"text":197,"correct":22},"可视化进度计划",{"key":27,"text":199,"correct":22},"成本管控",{"key":31,"text":201,"correct":29},"人力资源管理",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},858085,"绿色建筑分析软件传递数据的格式是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"RVT",{"key":24,"text":209,"correct":22},"DWG",{"key":27,"text":211,"correct":29},"gbXML",{"key":31,"text":213,"correct":22},"NWD",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},858086,"在BIM团队中下面哪一项职责是BIM专业负责人的职责？()",[218,220,222,224],{"key":20,"text":219,"correct":22},"参与BIM决策",{"key":24,"text":221,"correct":29},"负责专业内部任务分工",{"key":27,"text":223,"correct":22},"制定BIM工作计划",{"key":31,"text":225,"correct":22},"提供技术指导",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},858087,"在合同与成本管理中，BIM模型与业务数据集成后，实现()的三算对比。",[230,232,234,236],{"key":20,"text":231,"correct":22},"造价、预算、收入",{"key":24,"text":233,"correct":22},"投资、造价、预算",{"key":27,"text":235,"correct":29},"预算、收入、支出",{"key":31,"text":237,"correct":22},"投资、收入、支出",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},858088,"在BIM模型调整完毕后，布置支吊架并进行校核计算，这是属于()。",[242,244,246,248],{"key":20,"text":243,"correct":22},"钢结构深化",{"key":24,"text":245,"correct":22},"结构安全性复核",{"key":27,"text":247,"correct":29},"机电深化",{"key":31,"text":249,"correct":22},"土建深化",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},858089,"REVIT施工图设计过程中各专业间模型的同步方式为()。",[254,256,258,260],{"key":20,"text":255,"correct":22},"直接链接工作模型随时同步",{"key":24,"text":257,"correct":22},"完成模型设计后同步",{"key":27,"text":259,"correct":22},"完成外审后同步",{"key":31,"text":261,"correct":29},"建立专用条件模型按需同步",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},858090,"下面说法中，()是正确的。",[266,268,270,272],{"key":20,"text":267,"correct":22},"BIM技术主要是三维建模，只要能够看到三维模型就已经完成了BIM的深化设计",{"key":24,"text":269,"correct":29},"BIM技术不仅仅是三维模型，还应包含相关信息",{"key":27,"text":271,"correct":22},"使用BIM技术进行深化设计，建筑、结构、机电所有专业只能用同一个软件搭建模型",{"key":31,"text":273,"correct":22},"使用BIM技术进行深化设计，建筑、结构、机电各专业只能在一个平台上搭建模型",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},858091,"在运维阶段，包含建筑工程信息的竣工模型的用途是()。",[278,280,282,284],{"key":20,"text":279,"correct":22},"发现设计问题，利用模型进行管线修改",{"key":24,"text":281,"correct":22},"工程量统计",{"key":27,"text":283,"correct":29},"导人物业运维管理系统中将模型和建筑物关联进行整体管理管控",{"key":31,"text":285,"correct":22},"预算造价管理",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},858092,"RFID指的是()。",[290,292,294,296],{"key":20,"text":291,"correct":29},"射频识别技术",{"key":24,"text":293,"correct":22},"虚拟现实技术",{"key":27,"text":295,"correct":22},"虚拟原型技术",{"key":31,"text":297,"correct":22},"地理信息系统",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},858093,"工作集协作模式的使用条件是()。",[302,304,306,308],{"key":20,"text":303,"correct":22},"需要采用相同版本建模软件，建立统一的标高轴网文件，各专业工程师建立自己的项目文件",{"key":24,"text":305,"correct":22},"需要有服务器存储设备及同一网络，建立统一的标高轴网文件，各专业工程师建立自己的项目文件",{"key":27,"text":307,"correct":22},"需要采用相同版本建模软件，建立统一的标高轴网文件，由项目管理人统一建立和管理工作集的设置",{"key":31,"text":309,"correct":29},"需要有服务器存储设备及同一网络，采用相同版本的建模软件，由项目管理人统一建立和管理工作集的设置",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},858094,"下面哪一项不属于传统的设计表现手法？()",[314,316,318,320],{"key":20,"text":315,"correct":22},"平面图",{"key":24,"text":317,"correct":22},"立面图",{"key":27,"text":319,"correct":22},"剖面图",{"key":31,"text":321,"correct":29},"俯视图",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},858095,"虚拟建造技术不能够解决施工中()问题。",[326,328,330,332],{"key":20,"text":327,"correct":29},"统计概算工程量",{"key":24,"text":329,"correct":22},"操作是否存在冲突或违反安全规范",{"key":27,"text":331,"correct":22},"是否有充足时间来完成施工任务",{"key":31,"text":333,"correct":22},"检查施工顺序的正确性",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},858096,"结构施工图设计模型时在初步设计模型的基础上，经过多专业协同设计，进行()后，确定的最终结构设计模型。",[338,340,342,344],{"key":20,"text":339,"correct":29},"碰撞检查",{"key":24,"text":341,"correct":22},"计算分析",{"key":27,"text":343,"correct":22},"深化设计",{"key":31,"text":345,"correct":22},"优化设计",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},858097,"BIM应用中下面哪一项属于BIM经济方面的应用？()",[350,351,353,355],{"key":20,"text":343,"correct":22},{"key":24,"text":352,"correct":29},"劳务管理",{"key":27,"text":354,"correct":22},"工作面管理",{"key":31,"text":356,"correct":22},"运营管理",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},858098,"以下说法错误的是()。",[361,363,365,367],{"key":20,"text":362,"correct":22},"综合协调工作将贯穿于整个设计流程中，可随时协调",{"key":24,"text":364,"correct":29},"结构设计方案可以集成建筑模型.完成所有结构构件布置",{"key":27,"text":366,"correct":22},"工程设计过程中存在完整的信息模型，支持模型与图档的关联修改和自动更新",{"key":31,"text":368,"correct":22},"可以在结构专业软件中完成方案设计，然后输出结构BIM模型",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":27,"analysis":33},858099,"三维激光扫描仪垂直扫描范围()。",[373,375,377,379],{"key":20,"text":374,"correct":22},"180°",{"key":24,"text":376,"correct":22},"270°",{"key":27,"text":378,"correct":29},"300°",{"key":31,"text":380,"correct":22},"360°",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},858100,"施工企业应用BIM的内容不包括()。",[385,387,389,391],{"key":20,"text":386,"correct":22},"施工建模",{"key":24,"text":388,"correct":22},"施工深化设计",{"key":27,"text":390,"correct":22},"施工工法模拟",{"key":31,"text":392,"correct":29},"运行维护",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":27,"analysis":33},858101,"下面哪一项不属于桥梁模型的连接节点？()",[397,399,401,403],{"key":20,"text":398,"correct":22},"承台",{"key":24,"text":400,"correct":22},"桥台",{"key":27,"text":402,"correct":29},"桥塔",{"key":31,"text":404,"correct":22},"鞍座",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},858102,"机电专业BIM施工工作计划中，首先需安排的工作是()。",[409,411,413,415],{"key":20,"text":410,"correct":29},"根据甲方的整体项目节点时间要求制定机电专业的施工计划节点",{"key":24,"text":412,"correct":22},"进行图纸深化设计",{"key":27,"text":414,"correct":22},"完成机电施工建模",{"key":31,"text":416,"correct":22},"完成机电施工设备材料的统计",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},858103,"下面哪一项不是一般模型拆分原则？()",[421,423,425,427],{"key":20,"text":422,"correct":22},"按专业拆分",{"key":24,"text":424,"correct":29},"按进度拆分",{"key":27,"text":426,"correct":22},"按楼层拆分",{"key":31,"text":428,"correct":22},"结构层高表",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},858104,"视图样板中为了表现结构斜撑布置、结构桁架和转换结构的视图样板是()。",[433,435,437,439],{"key":20,"text":434,"correct":22},"结构模板平面",{"key":24,"text":436,"correct":22},"结构布置平面",{"key":27,"text":438,"correct":22},"结构剖面",{"key":31,"text":440,"correct":29},"结构立面",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":27,"analysis":33},858105,"下面哪一项不属于现阶段BIM在应用中的挑战()。",[445,447,449,451],{"key":20,"text":446,"correct":22},"软件间数据交互难度大",{"key":24,"text":448,"correct":22},"目前市场上还没有成熟的适合中国国情的、应用与施工管理的BIM软件",{"key":27,"text":450,"correct":29},"无法进行成本控制",{"key":31,"text":452,"correct":22},"信息与模型关联难度大",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},858106,"BIM的用途决定了BIM模型的精度，同时仅靠一个BIM工具并不能完成所有的工作，目前业内主要采用()BIM模型的方法。",[457,459,461,463],{"key":20,"text":458,"correct":29},"统一式",{"key":24,"text":460,"correct":22},"协调式",{"key":27,"text":462,"correct":22},"时效式",{"key":31,"text":464,"correct":22},"分布式",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":27,"analysis":33},858107,"VDC模式的工作流程在设计阶段和施工阶段中间加入了()。",[469,471,473,475],{"key":20,"text":470,"correct":22},"深化设计阶段",{"key":24,"text":472,"correct":22},"优化设计阶段",{"key":27,"text":474,"correct":29},"预建造阶段",{"key":31,"text":476,"correct":22},"概算阶段",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":27,"analysis":33},858108,"下面哪一项属于BIM技术在施工中的深入应用？()",[481,483,485,487],{"key":20,"text":482,"correct":22},"管线综合",{"key":24,"text":484,"correct":22},"碰撞检测",{"key":27,"text":486,"correct":29},"进度、成本控制",{"key":31,"text":281,"correct":22},{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":27,"analysis":33},858109,"一般BIM模型拆分要求，根据一般电脑配置要求分析，多专业模型宜控制在()内，单个文件不大于100MB。",[492,494,496,498],{"key":20,"text":493,"correct":22},"3000㎡",{"key":24,"text":495,"correct":22},"5000㎡",{"key":27,"text":497,"correct":29},"6000㎡",{"key":31,"text":499,"correct":22},"8000㎡",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":20,"analysis":33},858110,"工作集协同绘图方式是将所有人的修改成果通过网络共享文件夹的方式保存在()上。",[504,506,507,508],{"key":20,"text":505,"correct":29},"中央服务器",{"key":24,"text":101,"correct":22},{"key":27,"text":103,"correct":22},{"key":31,"text":105,"correct":22},{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":27,"analysis":33},858111,"与传统方式相比，BIM在实施应用过程中是以()为基础，来进行工程信息的分析、处理。",[513,515,517,519],{"key":20,"text":514,"correct":22},"设计施工图",{"key":24,"text":516,"correct":22},"结构计算模型",{"key":27,"text":518,"correct":29},"各专业BIM模型",{"key":31,"text":520,"correct":22},"竣工图",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},858112,"为了减少机电模型中因碰撞而进行管线调整的工作量，下面做法正确的是()。",[525,527,529,531],{"key":20,"text":526,"correct":29},"搭建模型时，先在二维平面中进行初步的二维平面管线的综合排布",{"key":24,"text":528,"correct":22},"搭建模型时，把所有专业的模型建在一个模型里面",{"key":27,"text":530,"correct":22},"搭建模型时，使用一款可以绘制建筑、结构和专业模型的软件",{"key":31,"text":532,"correct":22},"搭建模型时，由一个人来建立机电模型",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},858113,"下列选项属于结构方案设计阶段BIM模型内容的是()。",[537,539,541,543],{"key":20,"text":538,"correct":29},"结构材质信息",{"key":24,"text":540,"correct":22},"基础信息",{"key":27,"text":542,"correct":22},"结构楼板信息",{"key":31,"text":544,"correct":22},"次要构件信息",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":24,"analysis":33},858114,"下面哪一种软件不属于结构计算分析软件？()",[549,551,553,555],{"key":20,"text":550,"correct":22},"ABAQUS",{"key":24,"text":552,"correct":29},"ITWO",{"key":27,"text":554,"correct":22},"MIDAS",{"key":31,"text":556,"correct":22},"YJK",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},858115,"Revit软件中协同绘图方式主要可分为两种：一种为链接方式，另一种是()。",[561,563,565,567],{"key":20,"text":562,"correct":29},"工作集协作模式",{"key":24,"text":564,"correct":22},"基于云计算的共享同步",{"key":27,"text":566,"correct":22},"网络通信",{"key":31,"text":568,"correct":22},"参数化族库共享",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":31,"analysis":33},858116,"冲突检测是指通过建立BIM三维空间()，在数字模型中提前预警工程项目中不同专业在空间上的冲突、碰撞问题。",[573,575,577,579],{"key":20,"text":574,"correct":22},"建筑模型",{"key":24,"text":576,"correct":22},"信息模型",{"key":27,"text":578,"correct":22},"体量模型",{"key":31,"text":580,"correct":29},"几何模型",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},858117,"Revit施工图设计主要工作可按工作类型分为哪两个阶段()。",[585,587,589,591],{"key":20,"text":586,"correct":22},"建筑设计＋结构设计",{"key":24,"text":588,"correct":29},"模型设计＋标注出图",{"key":27,"text":590,"correct":22},"模型设计＋模型计算",{"key":31,"text":592,"correct":22},"建筑设计＋机电设计",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":31,"analysis":33},858118,"下列关于BIM参数化设计的描述中，()是不正确的。",[597,599,601,603],{"key":20,"text":598,"correct":22},"BIM可以实现参数驱动模型变更",{"key":24,"text":600,"correct":22},"BIM便于后期基于参数统计工程量",{"key":27,"text":602,"correct":22},"BIM使变更更加方便快捷",{"key":31,"text":604,"correct":29},"使用BIM可以自由设计",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":27,"analysis":33},858119,"电气专业建模中电缆桥架与用电设备交越时，其间的净距不小于()。",[609,611,613,615],{"key":20,"text":610,"correct":22},"300mm",{"key":24,"text":612,"correct":22},"400mm",{"key":27,"text":614,"correct":29},"500mm",{"key":31,"text":616,"correct":22},"600mm",[618,621,624,627,630,632],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":6,"category":7,"favorite":8},534,{"id":633,"name":634,"category":7,"favorite":8},536,"安全人A证"]