[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-17":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,17,50,1302,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,393,405,417,429,441,453,461,473,485,497,509,521,533,545,557,568,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},858018,1,"单选题","以下哪项不属于业主单位的BIM应用需求()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","招标管理",false,{"key":24,"text":25,"correct":22},"B","设计管理",{"key":27,"text":28,"correct":22},"C","施工管理",{"key":30,"text":31,"correct":32},"D","设计质量控制",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},858019,"BIM模型在动态维护工程中，可以及时地将变更图纸进行三维建模，将变更发生的材料、人工等费用准确、及时的计算出来，便于办理并保证工程( )的有效性。",[38,40,42,44],{"key":20,"text":39,"correct":32},"变更签证",{"key":24,"text":41,"correct":22},"变更合同",{"key":27,"text":43,"correct":22},"成本核算",{"key":30,"text":45,"correct":22},"工程款清算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},858020,"针对同一个项目的BIM技术应用，各自的关注点和职责也不尽相同。例如，业主单位会更多关注( )。",[50,52,54,56],{"key":20,"text":51,"correct":32},"整体项目的BIM技术应用部署和开展",{"key":24,"text":53,"correct":22},"设计阶段的BIM技术应用",{"key":27,"text":55,"correct":22},"施工阶段的BIM技术应用",{"key":30,"text":57,"correct":22},"整体项目的成本和造价",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},858021,"在设计时，往往由于各专业设计师之间的沟通不到位，而出现各种专业之间的碰撞问题，BIM的()就可以帮助处理这种问题。",[62,64,66,68],{"key":20,"text":63,"correct":32},"协调性服务",{"key":24,"text":65,"correct":22},"定时性检查",{"key":27,"text":67,"correct":22},"自动化修改",{"key":30,"text":69,"correct":22},"保障性服务",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},858022,"()是指对已经完成的项目或规划的目的、执行过程、效益、作用和影响所进行的系统、客观的分析。",[74,76,78,80],{"key":20,"text":75,"correct":32},"项目后评价",{"key":24,"text":77,"correct":22},"项目总结",{"key":27,"text":79,"correct":22},"项目评估",{"key":30,"text":81,"correct":22},"项目后分析",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},858023,"下列关于运维与设施管理的说法正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"运维管理就是指物业管理",{"key":24,"text":89,"correct":32},"运维管理的多个职能归根到底都是为了给所管理建筑的使用者、所有者提供满意的服务",{"key":27,"text":91,"correct":22},"运维管理工作简单，对管理人员的专业知识水平要求不高",{"key":30,"text":93,"correct":22},"建筑及其使用者的日常活动在全球范围内能耗较小",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},858024,"下列选项关于碰撞检查中管线优化设计原则说法不正确的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"在非管线穿梁、碰柱、穿吊顶等必要情况下，尽量不要改动",{"key":24,"text":101,"correct":32},"管线避让原则为：无压管让有压管；大管线让小管线；施工简单管让施工复杂管；冷水管道避让热水管道；附件少的管道避让附件多的管道；临时管道避让永久管道",{"key":27,"text":103,"correct":22},"在需满足建筑业主要求时，对没有发生碰撞但不满足净高要求的部位需要进行优化设计",{"key":30,"text":105,"correct":22},"管线优化设计时，应预留安装、检修空间",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},858025,"BIM技术和()的结合完美地解决了可视化资产监控、查询、定位管理。",[110,112,114,116],{"key":20,"text":111,"correct":22},"GIS技术",{"key":24,"text":113,"correct":22},"3D扫描技术",{"key":27,"text":115,"correct":22},"VR技术",{"key":30,"text":117,"correct":32},"物联网技术",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},858026,"方案设计阶段BIM应用主要方面不包括( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"利用BIM技术进行概念设计",{"key":24,"text":125,"correct":22},"利用BIM技术进行场地规划",{"key":27,"text":127,"correct":22},"利用BIM技术进行方案比选",{"key":30,"text":129,"correct":32},"利用BIM技术进行性能分析",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},858027,"下列选项关于基于BIM的钢结构深化设计流程说法正确的是()。",[134,136,138,140],{"key":20,"text":135,"correct":32},"BIM三维模型搭建→钢结构节点补充及细化→碰撞检测→基于BIM模型出图",{"key":24,"text":137,"correct":22},"钢结构节点补充及细化→BIM三维模型搭建→碰撞检测→基于BIM模型出图",{"key":27,"text":139,"correct":22},"BIM三维模型搭建→碰撞检测→钢结构节点补充及细化→基于BIM模型出图",{"key":30,"text":141,"correct":22},"钢结构节点补充及细化→碰撞检测→BIM三维模型搭建→基于BIM模型出图",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},858028,"场地规划实施管理流程是()。",[146,148,150,152],{"key":20,"text":147,"correct":32},"数据准备→操作实施→成果",{"key":24,"text":149,"correct":22},"数据准备→操作实施→数据整理→成果",{"key":27,"text":151,"correct":22},"数据准备→操作实施→结果分析→成果",{"key":30,"text":153,"correct":22},"操作实施→数据准备→成果",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},858029,"施工项目管理是以施工项目为管理对象，以( )为中心，以合同为依据，按施工项目的内在规律，实现资源的优化配置和对各生产要素进行有效地计划、组织、指导、控制，取得最佳的经济效益的过程。",[158,160,162,164],{"key":20,"text":159,"correct":22},"业主单位",{"key":24,"text":161,"correct":32},"项目经理责任制",{"key":27,"text":163,"correct":22},"组织协调",{"key":30,"text":165,"correct":22},"成本控制",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},858030,"选择BIM软件搭建BIM模型应注重软件的()。",[170,172,174,176],{"key":20,"text":171,"correct":32},"便捷性、轻量化",{"key":24,"text":173,"correct":22},"便捷性、信息化",{"key":27,"text":175,"correct":22},"信息化、通用性",{"key":30,"text":177,"correct":22},"便捷性、通用性",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},858031,"市政3D道路设计软件主要流程的第一步是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"平面设计",{"key":24,"text":185,"correct":32},"地形处理",{"key":27,"text":187,"correct":22},"纵断面设计",{"key":30,"text":189,"correct":22},"横断面设计",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},858032,"暖通专业建模中风管距离下方管道至少()。",[194,196,198,200],{"key":20,"text":195,"correct":32},"50mm",{"key":24,"text":197,"correct":22},"100mm",{"key":27,"text":199,"correct":22},"150mm",{"key":30,"text":201,"correct":22},"200mm",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},858033,"三维视角能体现室内装修细节，在项目还没开始的时候，就能让业主理解这种独特的设计意图，以结合业主的建议来优化设计方案，以上描述体现的是()。",[206,208,210,212],{"key":20,"text":207,"correct":32},"建筑信息模型的可视化优势",{"key":24,"text":209,"correct":22},"建筑信息模型的模拟分析",{"key":27,"text":211,"correct":22},"建筑信息模型的文档管理",{"key":30,"text":213,"correct":22},"建筑信息模型的性能分析",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},858034,"IPD协议与BIM应用相结合，协作团队能克服传统工作流程中所遇到的困境，他们使用最有效的工具并且能从项目整体考虑问题。下面哪一项不是IPD协议的优点()。",[218,220,222,224],{"key":20,"text":219,"correct":32},"产品研发周期增加",{"key":24,"text":221,"correct":22},"产品质量提高",{"key":27,"text":223,"correct":22},"产品成本降低",{"key":30,"text":225,"correct":22},"研发费用占总收入的比率降低",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},858035,"下面哪一项不属于结构专业明细表()。",[230,232,234,236],{"key":20,"text":231,"correct":22},"构件尺寸表",{"key":24,"text":233,"correct":22},"楼梯表",{"key":27,"text":235,"correct":32},"大样配筋表",{"key":30,"text":237,"correct":22},"结构层高表",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},858036,"BIM的4D是在3D建筑信息模型基础上，融人()。",[242,244,246,248],{"key":20,"text":243,"correct":22},"成本造价信息",{"key":24,"text":245,"correct":22},"合同成本信息",{"key":27,"text":247,"correct":32},"进度控制信息",{"key":30,"text":249,"correct":22},"质量控制信息",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":27,"analysis":33},858037,"下面哪一项不是初步设计阶段可以使用的绿色分析软件()。",[254,256,258,260],{"key":20,"text":255,"correct":22},"Ecotect",{"key":24,"text":257,"correct":22},"StarCCM＋",{"key":27,"text":259,"correct":32},"Matlab",{"key":30,"text":261,"correct":22},"IES",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":30,"analysis":33},858038,"下面哪一项不是结合BIM技术的同专业分包商协同考虑的问题？()",[266,268,270,272],{"key":20,"text":267,"correct":22},"预算",{"key":24,"text":269,"correct":22},"材料供应",{"key":27,"text":271,"correct":22},"施工能力",{"key":30,"text":273,"correct":32},"设计方案",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},858039,"导入CAD图纸进入Revit时，如何定位图纸？()",[278,280,282,284],{"key":20,"text":279,"correct":22},"中心到中心",{"key":24,"text":281,"correct":22},"中心到圆点",{"key":27,"text":283,"correct":32},"圆点到圆点",{"key":30,"text":285,"correct":22},"圆点到中心",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":30,"analysis":33},858040,"三维建模时，各专业协同绘图的方式不包括()。",[290,292,294,296],{"key":20,"text":291,"correct":22},"可以使用链接方式完成各专业间协同工作",{"key":24,"text":293,"correct":22},"可以使用工作集方式完成各专业间协同工作",{"key":27,"text":295,"correct":22},"可以使用链接方式完成专业内部协同工作",{"key":30,"text":297,"correct":32},"可以使用拷贝方式完成专业内部协同工作",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":30,"analysis":33},858041,"BIM应用中下面哪一项属于BIM技术方面的应用？()",[302,304,306,308],{"key":20,"text":303,"correct":22},"工程量计算",{"key":24,"text":305,"correct":22},"预算管理",{"key":27,"text":307,"correct":22},"成本管理",{"key":30,"text":309,"correct":32},"进度管理",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},858042,"能耗分析是属于BIM技术在()阶段中的应用。",[314,316,318,320],{"key":20,"text":315,"correct":22},"概念设计",{"key":24,"text":317,"correct":32},"方案设计",{"key":27,"text":319,"correct":22},"初步设计",{"key":30,"text":321,"correct":22},"施工图设计",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":30,"analysis":33},858043,"钢结构深化的内容不包括下面哪一项()。",[326,328,330,332],{"key":20,"text":327,"correct":22},"节点构造",{"key":24,"text":329,"correct":22},"特殊构件",{"key":27,"text":331,"correct":22},"施工详图设计",{"key":30,"text":333,"correct":32},"用钢量优化",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},858044,"下列不属于BIM技术在运维阶段应用的是()。",[338,340,342,344],{"key":20,"text":339,"correct":22},"机械通风",{"key":24,"text":341,"correct":22},"租户能源使用情况",{"key":27,"text":343,"correct":32},"项目成本管理",{"key":30,"text":345,"correct":22},"水平衡",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},858046,"下面哪一项不是机房机电安装工程BIM深化设计的内容？()",[350,352,354,356],{"key":20,"text":351,"correct":32},"基础建模",{"key":24,"text":353,"correct":22},"机电设备建模",{"key":27,"text":355,"correct":22},"机电管线建模",{"key":30,"text":357,"correct":22},"碰撞检查",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},858047,"BIM竣工模型形成后，土建和机电安装等各专业需要应用竣工模型指导施工，下列做法错误的是()。",[362,364,366,368],{"key":20,"text":363,"correct":22},"总承包单位应将竣工模型复制一份给各分包单位，以便于各分包单位在施工中运用",{"key":24,"text":365,"correct":32},"各专业可以打开别的专业的模型组",{"key":27,"text":367,"correct":22},"各专业应用时打开自己专业的模型组，根据专业系统逐一拆分模型(拆分亦即临时隐藏)",{"key":30,"text":369,"correct":22},"根据施工节点计划，控制模型的拆分段，应用完毕，应该及时关闭自己专业的模型组",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},858048,"建筑师为满足环境规划要求，基于环境分析数据设计的多个建筑型体，概念设计阶段结合BIM技术初步建立的模型为()。",[374,376,378,380],{"key":20,"text":375,"correct":22},"初设模型",{"key":24,"text":377,"correct":22},"概念模型",{"key":27,"text":379,"correct":32},"体量模型",{"key":30,"text":381,"correct":22},"方案模型",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},858049,"下面哪一项属于机电专业的BIM软件？()",[386,388,390,391],{"key":20,"text":387,"correct":22},"CATIA",{"key":24,"text":389,"correct":32},"MagiCAD",{"key":27,"text":255,"correct":22},{"key":30,"text":392,"correct":22},"ETABS",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":30,"analysis":33},858050,"建模LOD100中说法不正确的是()。",[397,399,401,403],{"key":20,"text":398,"correct":22},"只有管道类型、管径和主管标高",{"key":24,"text":400,"correct":22},"阀门不表示",{"key":27,"text":402,"correct":22},"仪表不表示",{"key":30,"text":404,"correct":32},"卫生器具有简单的体量",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},858051,"在机电专业中主管网的通常的表示颜色为()。",[409,411,413,415],{"key":20,"text":410,"correct":32},"红色",{"key":24,"text":412,"correct":22},"黄色",{"key":27,"text":414,"correct":22},"橘色",{"key":30,"text":416,"correct":22},"紫色",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":30,"analysis":33},858052,"三维激光扫描仪水平扫描范围是()。",[421,423,425,427],{"key":20,"text":422,"correct":22},"180°",{"key":24,"text":424,"correct":22},"270°",{"key":27,"text":426,"correct":22},"300°",{"key":30,"text":428,"correct":32},"360°",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},858053,"结构()，用于绘制结构梁板柱的钢筋、标注钢筋代号和布筋范围、钢筋量注释等。",[433,435,437,439],{"key":20,"text":434,"correct":22},"布置平面",{"key":24,"text":436,"correct":32},"配筋平面",{"key":27,"text":438,"correct":22},"模板平面",{"key":30,"text":440,"correct":22},"基础平面",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},858054,"采用工作集协作模式，各专业人员必须使用链接()服务器的()设备进行工作。",[445,447,449,451],{"key":20,"text":446,"correct":22},"不同、唯一",{"key":24,"text":448,"correct":32},"同一、唯一",{"key":27,"text":450,"correct":22},"不同、不同",{"key":30,"text":452,"correct":22},"同一、不同",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},858055,"结构()，用于标注结构构件定位、构件尺寸和编号、索引和注释等内容。",[457,458,459,460],{"key":20,"text":434,"correct":32},{"key":24,"text":436,"correct":22},{"key":27,"text":438,"correct":22},{"key":30,"text":440,"correct":22},{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":27,"analysis":33},858056,"对于LOD300的BIM模型，下面哪一项不是暖通给水管体现的信息？()",[465,467,469,471],{"key":20,"text":466,"correct":22},"管线尺寸",{"key":24,"text":468,"correct":22},"支管线",{"key":27,"text":470,"correct":32},"管线技术参数",{"key":30,"text":472,"correct":22},"管线标高",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},858057,"可持续建筑设计及分析软件Ecotect，不能支持的功能是()。",[477,479,481,483],{"key":20,"text":478,"correct":22},"建筑能耗分析",{"key":24,"text":480,"correct":32},"室外风环境",{"key":27,"text":482,"correct":22},"水耗分析",{"key":30,"text":484,"correct":22},"日照分析",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},858058,"下面哪一项属于结构方案设计模型基本信息？()",[489,491,493,495],{"key":20,"text":490,"correct":22},"混凝土强度等级",{"key":24,"text":492,"correct":32},"结构安全等级",{"key":27,"text":494,"correct":22},"风荷载",{"key":30,"text":496,"correct":22},"楼面活载",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":27,"analysis":33},858059,"下面哪一项不是施工方案模拟演示的作用？()",[501,503,505,507],{"key":20,"text":502,"correct":22},"对于施工单位理解设计意图起辅助作用",{"key":24,"text":504,"correct":22},"对于制造加工起一定指导作用",{"key":27,"text":506,"correct":32},"节约一定成本作用",{"key":30,"text":508,"correct":22},"有利于优化施工工期与工艺方法",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},858060,"塔吊安全管理中首要确定的是()。",[513,515,517,519],{"key":20,"text":514,"correct":22},"塔吊高度",{"key":24,"text":516,"correct":32},"塔吊回转半径",{"key":27,"text":518,"correct":22},"塔吊臂长",{"key":30,"text":520,"correct":22},"塔吊和附近建筑物的安全距离",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":20,"analysis":33},858061,"下面哪一项不是造价管理方面的应用体现()。",[525,527,529,531],{"key":20,"text":526,"correct":32},"劳务管理",{"key":24,"text":528,"correct":22},"合同管理",{"key":27,"text":530,"correct":22},"变更签证管理",{"key":30,"text":532,"correct":22},"成本分析",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},858062,"下面哪一项是BIM深化设计协调管理流程的首要步骤()。",[537,539,541,543],{"key":20,"text":538,"correct":22},"定制统一的标准",{"key":24,"text":540,"correct":32},"建立规范文件存储体系",{"key":27,"text":542,"correct":22},"深化设计变更管理",{"key":30,"text":544,"correct":22},"竣工模型管理",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":20,"analysis":33},858063,"施工机械设备GPS定位管理系统对现场主要的移动式机械设备进行GPS()。",[549,551,553,555],{"key":20,"text":550,"correct":32},"定位和跟踪管理",{"key":24,"text":552,"correct":22},"定位和运行管理",{"key":27,"text":554,"correct":22},"定位和监测管理",{"key":30,"text":556,"correct":22},"定位和运维管理",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":24,"analysis":33},858064,"下面哪一项不属于方案阶段BIM应用？()",[561,563,564,566],{"key":20,"text":562,"correct":22},"分配平面空间",{"key":24,"text":484,"correct":32},{"key":27,"text":565,"correct":22},"能耗分析",{"key":30,"text":567,"correct":22},"方案比选",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":20,"analysis":33},858065,"BIM技术防坠落管理中，通过在BIM模型中的危险源存在部位建立()。",[572,574,576,578],{"key":20,"text":573,"correct":32},"防坠落栏杆模型",{"key":24,"text":575,"correct":22},"危险标识",{"key":27,"text":577,"correct":22},"安全网",{"key":30,"text":579,"correct":22},"警示牌",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":27,"analysis":33},858066,"下面关于结构模型创建方法说法正确的是()。",[584,586,588,590],{"key":20,"text":585,"correct":22},"使用YJK创建结构模型，进行计算分析后直接导入Revit软件中",{"key":24,"text":587,"correct":22},"Revit软件中可以安装YJK和PKPM接口",{"key":27,"text":589,"correct":32},"使用PKPM创建结构模型，需要利用TSSD软件从PKPM中到处结构模型数据形成中间数据",{"key":30,"text":591,"correct":22},"利用Revit建模后，可直接导入到YJK和PKPM软件中去",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":27,"analysis":33},858067,"一般BIM模型拆分要求，根据一般电脑配置要求分析，单专业模型宜控制在()内。",[596,598,600,602],{"key":20,"text":597,"correct":22},"5000㎡",{"key":24,"text":599,"correct":22},"8000㎡",{"key":27,"text":601,"correct":32},"10000㎡",{"key":30,"text":603,"correct":22},"12000㎡",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":27,"analysis":33},858068,"下面哪一项不是BIM在运维阶段的应用内容？()",[608,609,611,613],{"key":20,"text":339,"correct":22},{"key":24,"text":610,"correct":22},"垂直交通",{"key":27,"text":612,"correct":32},"结构维护",{"key":30,"text":614,"correct":22},"温度监测",[616,619,622,625,628,630],{"id":15,"name":617,"category":7,"favorite":618},"领导干部任职前廉政法规知识测试题",92,{"id":620,"name":621,"category":7,"favorite":15},595,"建筑结构与设备",{"id":623,"name":624,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":626,"name":627,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":629,"name":6,"category":7,"favorite":8},534,{"id":631,"name":632,"category":7,"favorite":8},536,"安全人A证"]