[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,16,50,1302,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,259,271,283,295,306,318,330,342,350,362,374,386,398,409,421,433,444,456,468,480,492,504,516,528,539,551,563,575,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},857968,1,"单选题","BIM技术与()的结合将开创现代化管理的新纪元。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","物联网",true,{"key":24,"text":25,"correct":26},"B","互联网",false,{"key":28,"text":29,"correct":26},"C","协同技术",{"key":31,"text":32,"correct":26},"D","可视化技术","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},857969,"建筑全生命周期是指从( )、规划与设计、建造与运输、运行与维护直到拆除与处理(废弃、再循环和再利用等)的全循环过程。",[38,40,42,44],{"key":20,"text":39,"correct":26},"分析与准备",{"key":24,"text":41,"correct":22},"材料与构件生产",{"key":28,"text":43,"correct":26},"审批",{"key":31,"text":45,"correct":26},"初步设计",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},857970,"下列选项中属于BIM在施工投标阶段技术方案展示的应用内容的是()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"工程量统计",{"key":24,"text":53,"correct":22},"虚拟施工",{"key":28,"text":55,"correct":26},"土建深化",{"key":31,"text":57,"correct":26},"构件加工生成",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},857971,"建筑运维管理近年来在国内又被称为()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"BM",{"key":24,"text":65,"correct":22},"FM",{"key":28,"text":67,"correct":26},"BMM",{"key":31,"text":69,"correct":26},"BFM",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},857972,"以下不属于设计方项目管理内容的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":26},"与设计有关的安全管理",{"key":24,"text":77,"correct":26},"设计进度控制",{"key":28,"text":79,"correct":26},"设计信息管理",{"key":31,"text":81,"correct":22},"基于精细化设计理念的数字化模拟与评估",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},857973,"下列选项不属于BIM技术在初步设计中的应用的是()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"结构分析",{"key":24,"text":89,"correct":26},"性能分析",{"key":28,"text":91,"correct":26},"工程算量",{"key":31,"text":93,"correct":22},"碰撞检查",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},857974,"以下关于BIM在成本控制中的应用说法错误的是( )。",[98,100,102,104],{"key":20,"text":99,"correct":26},"BIM的出现，为限额领料提供了技术、数据支撑",{"key":24,"text":101,"correct":26},"通过BIM技术可以通过施工预算控制人力资源和物质资源的消耗",{"key":28,"text":103,"correct":26},"5D模型集三维建筑模型、施工组织方案、成本及造价等3部分于一体，能实现对成本费用的实时模拟和核算",{"key":31,"text":105,"correct":22},"通过BIM建立了具有资源和成本信息的预算信息模型后，需要通过人工计算建筑构件的资源用量及成本，用以指导实际材料物资的采购",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},857975,"下列选项关于建筑全生命周期管理中的一些常用术语说法不正确的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"“三控”指的是工程进度控制、工程质量控制、工程安全控制",{"key":24,"text":113,"correct":26},"“三管”指的是合同管理、职业健康安全与环境管理、信息管理",{"key":28,"text":115,"correct":26},"“一协调”指全面组织协调(协调的范围分为内部协调和外部协调)",{"key":31,"text":117,"correct":26},"建筑工程五方责任主体项目负责人是指承担建筑工程项目建设的建设单位项目负责人、勘察单位项目负责人、设计单位项目负责人、施工单位项目经理、监理单位总监理工程师",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},857976,"下列( )是建设工程生产过程的总集成者，也是建设工程生产过程的总组织者。",[122,124,126,128],{"key":20,"text":123,"correct":22},"业主",{"key":24,"text":125,"correct":26},"设计单位",{"key":28,"text":127,"correct":26},"政府部门",{"key":31,"text":129,"correct":26},"施工单位",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},857977,"以下关于BIM在深化设计中的应用说法错误的是()。",[134,136,138,140],{"key":20,"text":135,"correct":26},"BIM模型可以协助完成机电安装部分的深化设计，包括综合布管图、综合布线图的深化",{"key":24,"text":137,"correct":26},"基于BIM模型对土建结构部分，包括土建结构与门窗等构件、预留洞口、预埋件位置及各复杂部位等施工图纸进行深化，可以减少工程施工阶段可能存在的错误",{"key":28,"text":139,"correct":26},"钢结构BIM三维建模出图进行深化设计的过程，本质上就是进行电脑预拼装、实现“所见即所得”的过程",{"key":31,"text":141,"correct":22},"玻璃幕墙深化设计就是对整个建筑的幕墙所有部位进行细化补充设计",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},857978,"设备维护流程是( )。",[146,148,150,152],{"key":20,"text":147,"correct":26},"设备运行和控制→设备信息查询→设备报修流程→计划性维护",{"key":24,"text":149,"correct":22},"设备信息查询→设备运行和控制→设备报修流程→计划性维护",{"key":28,"text":151,"correct":26},"设备信息查询→设备运行和控制→计划性维护→设备报修流程",{"key":31,"text":153,"correct":26},"设备信息查询→计划性维护→设备运行和控制→设备报修流程",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},857979,"BIM技术实现的核心基础是()。",[158,160,162,164],{"key":20,"text":159,"correct":26},"建筑信息模型的设计与研发",{"key":24,"text":161,"correct":26},"建筑信息模型的建立与完善",{"key":28,"text":163,"correct":26},"建筑信息模型的优化与更新",{"key":31,"text":165,"correct":22},"建筑信息模型的共享与转换",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},857980,"土建结构深化设计属于( )。",[170,172,174,176],{"key":20,"text":171,"correct":22},"专业性深化设计",{"key":24,"text":173,"correct":26},"综合性深化设计",{"key":28,"text":175,"correct":26},"特殊性深化设计",{"key":31,"text":177,"correct":26},"集成性深化设计",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},857981,"基于BIM技术的()可对技术标表现带来很大的提升，更好地展现技术方案。",[182,184,186,188],{"key":20,"text":183,"correct":26},"2D功能",{"key":24,"text":185,"correct":22},"3D功能",{"key":28,"text":187,"correct":26},"4D功能",{"key":31,"text":189,"correct":26},"5D功能",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},857982,"方案设计阶段的BIM应用主要是利用BIM技术对项目的( )进行验证，对下一步深化工作进行推导和方案细化。",[194,196,198,200],{"key":20,"text":195,"correct":26},"合理性",{"key":24,"text":197,"correct":26},"经济性",{"key":28,"text":199,"correct":22},"可行性",{"key":31,"text":201,"correct":26},"持续性",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},857983,"BIM在施工节地中的主要应用内容不包括()。",[206,208,210,212],{"key":20,"text":207,"correct":26},"场地分析",{"key":24,"text":209,"correct":26},"土方量计算",{"key":28,"text":211,"correct":26},"施工用地管理",{"key":31,"text":213,"correct":22},"建筑功能管理",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},857984,"室内声学设计主要包括建筑声学设计和()两部分。",[218,220,222,224],{"key":20,"text":219,"correct":22},"电声设计",{"key":24,"text":221,"correct":26},"结构声学设计",{"key":28,"text":223,"correct":26},"室外声学设计",{"key":31,"text":225,"correct":26},"室内声学设计",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":31,"analysis":33},857985,"建设项目设计阶段的主要责任方为初步设计方和()。",[230,232,234,236],{"key":20,"text":231,"correct":26},"业主方",{"key":24,"text":233,"correct":26},"监理方",{"key":28,"text":235,"correct":26},"施工方",{"key":31,"text":237,"correct":22},"施工图设计方",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},857986,"Cadna\u002FA软件不可以进行以下哪个模拟？()",[242,244,246,248],{"key":20,"text":243,"correct":26},"工业噪声计算与评估",{"key":24,"text":245,"correct":26},"道路和铁路噪声计算与预测",{"key":28,"text":247,"correct":26},"机场噪声计算与预测",{"key":31,"text":249,"correct":22},"语音声的客观评价指标",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},857987,"()是建设工程生产过程的总集成者——人力资源、物质资源和知识的集成，也是建设工程生产过程的总组织者。",[254,256,257,258],{"key":20,"text":255,"correct":22},"业主单位",{"key":24,"text":129,"correct":26},{"key":28,"text":125,"correct":26},{"key":31,"text":127,"correct":26},{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},857988,"设计阶段的安全管理说法不正确的是()。",[263,265,267,269],{"key":20,"text":264,"correct":26},"应充分考虑不安全因素，安全措施(防火、防爆、防污染等)应严格按照有关法律、法规、标准、规范进行，并配合业主报请当地安全、消防等机构的专项审查，确保项目实施及运行使用过程中的安全",{"key":24,"text":266,"correct":26},"应考虑施工安全操作和防护的需要，对涉及施工安全的重点部位和环节在设计文件中注明，并对防范安全事故提出指导意见",{"key":28,"text":268,"correct":26},"采用新结构、新材料、新工艺的建设工程和特殊结构、特种设备的项目，应在设计中提出保障施工作业人员安全和预防安全事故的措施建议",{"key":31,"text":270,"correct":22},"对于突发安全事故的预防只需要进行好提前的宣传和教育，不需要耗费时间去进行演练模拟，因为这类安全事故的变化性太大",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},857989,"公共安全管理是运维与设施管理的主要内容之一，以下哪一项不属于公共安全管理的内容()。",[275,277,279,281],{"key":20,"text":276,"correct":22},"安全教育",{"key":24,"text":278,"correct":26},"火灾报警",{"key":28,"text":280,"correct":26},"安全防范",{"key":31,"text":282,"correct":26},"应急联动",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},857990,"下面哪项不是属于项目BIM实施的保障措施？()",[287,289,291,293],{"key":20,"text":288,"correct":26},"建立系统运行保障体系",{"key":24,"text":290,"correct":22},"建立系统运行实施标准",{"key":28,"text":292,"correct":26},"建立系统运行检查机制",{"key":31,"text":294,"correct":26},"模型维护与应用机制",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},857991,"以下不属于项目实施过程中的参与单位的是()。",[299,300,302,304],{"key":20,"text":255,"correct":26},{"key":24,"text":301,"correct":26},"政府监察单位",{"key":28,"text":303,"correct":26},"勘察设计单位",{"key":31,"text":305,"correct":22},"验收单位",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},857992,"BIM在项目管理中的优势不包括()。",[310,312,314,316],{"key":20,"text":311,"correct":26},"基于BIM技术，可对投标书、进度审核预算书、结算书进行统一管理，并形成数据对比",{"key":24,"text":313,"correct":26},"BIM数据模型保证了各项目的数据动态调整，可以方便统计，追溯各个项目的现金流和资金状况",{"key":28,"text":315,"correct":26},"使进度计划和施工方案最优，在短时间内说明问题并提出相应的方案，再用来指导实际的项目施工",{"key":31,"text":317,"correct":22},"业主方在建设工程不同的阶段可自行或委托进行项目前期的开发管理、项目管理和设施管理",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},857993,"项目的实施、跟踪是一个控制过程，用于衡量项目是否向目标方向进展，监控偏离计划的偏差，在项目的()、时间和成本三大限制因素之间进行平衡，采取纠正措施使进度与计划相匹配。",[322,324,326,328],{"key":20,"text":323,"correct":26},"安全",{"key":24,"text":325,"correct":22},"范围",{"key":28,"text":327,"correct":26},"质量",{"key":31,"text":329,"correct":26},"进度",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":31,"analysis":33},857994,"以下关于BIM技术在工程进度管理上的应用说法错误的是()。",[334,336,338,340],{"key":20,"text":335,"correct":26},"通过BIM技术可以实现可视化的工程进度安排",{"key":24,"text":337,"correct":26},"通过BIM技术可以实现工程建设过程的模拟",{"key":28,"text":339,"correct":26},"通过BIM技术可以实现工程材料和设备供应过程的优化",{"key":31,"text":341,"correct":22},"通过BIM技术更容易实现施工成本控制",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},857995,"下列选项关于BIM的运维系统架构流程说法正确的是()。",[346,347,348,349],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},857996,"BIM技术在设计阶段主要任务不包括( )。",[354,356,358,360],{"key":20,"text":355,"correct":26},"进度控制",{"key":24,"text":357,"correct":26},"造价控制",{"key":28,"text":359,"correct":26},"安全管理",{"key":31,"text":361,"correct":22},"项目可行性验证",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":24,"analysis":33},857997,"BIM技术在进度管理中的优势说法不正确的是？()",[366,368,370,372],{"key":20,"text":367,"correct":26},"碰撞检测，减少变更和返工进度损失",{"key":24,"text":369,"correct":22},"提高施工人员素质，加快进度",{"key":28,"text":371,"correct":26},"加快生产计划、采购计划编制",{"key":31,"text":373,"correct":26},"提升全过程协同效率",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":31,"analysis":33},857998,"应用BIM技术可以实现的业主单位需求不包括()。",[378,380,382,384],{"key":20,"text":379,"correct":26},"招标管理",{"key":24,"text":381,"correct":26},"设计管理",{"key":28,"text":383,"correct":26},"销售推广",{"key":31,"text":385,"correct":22},"提高设计效率",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":20,"analysis":33},857999,"()是为了保证完成项目的实际成本、费用不超过预算成本、费用的管理过程。它包括资源的配置，成本、费用的预算以及费用的控制等工作。",[390,392,394,396],{"key":20,"text":391,"correct":22},"项目成本管理",{"key":24,"text":393,"correct":26},"项目采购管理",{"key":28,"text":395,"correct":26},"项目工程量管理",{"key":31,"text":397,"correct":26},"项目质量管理",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},858000,"下列不属于设计单位BIM项目管理应用需求的是()。",[402,404,406,407],{"key":20,"text":403,"correct":26},"增强沟通",{"key":24,"text":405,"correct":22},"提供便捷的管理手段",{"key":28,"text":385,"correct":26},{"key":31,"text":408,"correct":26},"可以提供更多更便捷的性能分析",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":20,"analysis":33},858001,"项目采购管理是为了从项目实施组织之外获得所需资源或服务所采取的一系列管理过程。它包括项目质量规划，项目质量控制和()。",[413,415,417,419],{"key":20,"text":414,"correct":22},"项目质量保证",{"key":24,"text":416,"correct":26},"项目质量监督",{"key":28,"text":418,"correct":26},"项目质量检验",{"key":31,"text":420,"correct":26},"项目质量评估",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":24,"analysis":33},858002,"下列选项体现的是运维与设施管理的服务性的是()。",[425,427,429,431],{"key":20,"text":426,"correct":26},"随着管理水平和企业信息化的进程，设施管理逐渐演变成综合性、多职能的管理工作",{"key":24,"text":428,"correct":22},"FM管理的多个职能归根到底都是为了给所管理建筑的使用者、所有者提供满意的服务",{"key":28,"text":430,"correct":26},"无论是机电设备、设施的运营、维护，结构的健康监控，和建筑环境的监测和管理都需要FM人员具有一定水平的专业知识",{"key":31,"text":432,"correct":26},"无论是组织自持的不动产性质的建筑，还是由专业FM机构运营管理用的建筑，其能耗管理都是关系到组织经济利益和社会环境可持续性发展的重大课题",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},858003,"关于施工节地中的BIM应用，()是研究影响建筑物定位的主要因素，是确定建筑物的空间方位和外观、建立建筑物与周围景观联系的过程。",[437,439,440,442],{"key":20,"text":438,"correct":26},"场址勘选",{"key":24,"text":207,"correct":22},{"key":28,"text":441,"correct":26},"场地设计",{"key":31,"text":443,"correct":26},"空间管理",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":31,"analysis":33},858004,"BIM模型与CFD计算分析的配合不包括()。",[448,450,452,454],{"key":20,"text":449,"correct":26},"BIM模型配合CFD计算热岛强度",{"key":24,"text":451,"correct":26},"BIM模型配合CFD计算室外风速",{"key":28,"text":453,"correct":26},"BIM模型配合CFD计算室内通风",{"key":31,"text":455,"correct":22},"BIM模型配合CFD计算室内外温差变化",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":20,"analysis":33},858005,"BIM技术和( )的结合完美地解决了可视化资产监控、查询、定位管理。",[460,462,464,466],{"key":20,"text":461,"correct":22},"物联网技术",{"key":24,"text":463,"correct":26},"3D扫面技术",{"key":28,"text":465,"correct":26},"3D打印技术",{"key":31,"text":467,"correct":26},"云计算",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":31,"analysis":33},858006,"下列选项不属于设备分析内容流程的是()。",[472,474,476,478],{"key":20,"text":473,"correct":26},"管道、通风、负荷等机电设计中的计算分析模型输出",{"key":24,"text":475,"correct":26},"冷、热负荷计算分析",{"key":28,"text":477,"correct":26},"舒适度和气流组织模拟",{"key":31,"text":479,"correct":22},"建筑、小区日照性能分析",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":28,"analysis":33},858007,"BIM技术协同和()的特点，是PLIM模式下建设项目全生命期一体化项目管理的主要技术手段，BIM技术与PLIM模式的结合造就了最佳项目管理模式。",[484,486,488,490],{"key":20,"text":485,"correct":26},"共享性",{"key":24,"text":487,"correct":26},"深化设计",{"key":28,"text":489,"correct":22},"信息平台",{"key":31,"text":491,"correct":26},"多维控制",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":28,"analysis":33},858008,"《绿色建筑评价标准》 (GB\u002FT 50378-2014)条文中4.1.4“建筑规划布局应满足日照标准，且不得降低周边建筑的日照标准”对应的BIM实现途径是下列哪项？( )",[496,498,500,502],{"key":20,"text":497,"correct":26},"基于BIM模拟分析土地利用率",{"key":24,"text":499,"correct":26},"基于BIM的CFD分析",{"key":28,"text":501,"correct":22},"基于BIM的日照模拟分析",{"key":31,"text":503,"correct":26},"基于BIM的通风模拟",{"id":505,"libraryId":5,"type":15,"typeLabel":16,"stem":506,"options":507,"answer":20,"analysis":33},858009,"基于BIM技术的施工过程模拟指的是在施工现场3D模型的基础上引入()维度，从而对工程主体结构施工过程进行4D模拟。",[508,510,512,514],{"key":20,"text":509,"correct":22},"时间",{"key":24,"text":511,"correct":26},"成本",{"key":28,"text":513,"correct":26},"荷载",{"key":31,"text":515,"correct":26},"材料",{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},858010,"供货单位的项目管理工作主要在哪个阶段进行？( )",[520,522,524,526],{"key":20,"text":521,"correct":26},"运维阶段",{"key":24,"text":523,"correct":26},"设计阶段",{"key":28,"text":525,"correct":26},"规划阶段",{"key":31,"text":527,"correct":22},"施工阶段",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":20,"analysis":33},858011,"三维可视化施工应力应变动态监测是属于BIM技术在()中的应用。",[532,533,535,537],{"key":20,"text":359,"correct":22},{"key":24,"text":534,"correct":26},"进度管理",{"key":28,"text":536,"correct":26},"成本管理",{"key":31,"text":538,"correct":26},"绿色施工管理",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":28,"analysis":33},858012,"关于传统设施管理存在的问题说法不正确的是()。",[543,545,547,549],{"key":20,"text":544,"correct":26},"运维与设施管理成本高",{"key":24,"text":546,"correct":26},"运维与设施管理信息不能集成共享",{"key":28,"text":548,"correct":22},"运维与设施管理没有正确的准则来指导",{"key":31,"text":550,"correct":26},"当前运维与设施管理信息化技术低下",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":20,"analysis":33},858013,"()是建筑项目设计的重要阶段，是项目设计和施工的桥梁。",[555,557,559,561],{"key":20,"text":556,"correct":22},"施工图设计",{"key":24,"text":558,"correct":26},"概念设计",{"key":28,"text":560,"correct":26},"结构设计",{"key":31,"text":562,"correct":26},"方案设计",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":20,"analysis":33},858014,"BIM技术在电量监测中通过安装( )电表后，在管理系统中可以及时收集所有能源信息，并且通过开发的能源管理功能模块，对能源消耗情况进行自动统计分析。",[567,569,571,573],{"key":20,"text":568,"correct":22},"具有传感功能的",{"key":24,"text":570,"correct":26},"普通",{"key":28,"text":572,"correct":26},"电子",{"key":31,"text":574,"correct":26},"具有监控摄影功能的",{"id":576,"libraryId":5,"type":15,"typeLabel":16,"stem":577,"options":578,"answer":31,"analysis":33},858015,"设施管理简称()。",[579,581,583,585],{"key":20,"text":580,"correct":26},"DM",{"key":24,"text":582,"correct":26},"PM",{"key":28,"text":584,"correct":26},"CM",{"key":31,"text":65,"correct":22},{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},858016,"以下关于传统设施管理的说法错误的是()。",[590,592,594,596],{"key":20,"text":591,"correct":22},"设备管理成本在传统设施管理成本所占的比重较小",{"key":24,"text":593,"correct":26},"传统的运维与设施管理信息不能集成共享",{"key":28,"text":595,"correct":26},"传统运维与设施管理信息化技术低下",{"key":31,"text":597,"correct":26},"传统的设施管理大部分采用手写记录单，既浪费时间，又容易造成错误",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":28,"analysis":33},858017,"钢筋深化设计流程为()。",[602,604,606,608],{"key":20,"text":603,"correct":26},"基于模型对钢结构节点进行补充→安装处理→碰撞校核→基于BIM模型出图",{"key":24,"text":605,"correct":26},"搭建BIM三维模型→基于模型对钢结构节点进行补充→安装处理→基于BIM模型出图",{"key":28,"text":607,"correct":22},"搭建BIM三维模型→基于模型对钢结构节点进行补充和安装处理→碰撞校核→基于BIM模型出图",{"key":31,"text":609,"correct":26},"搭建BIM三维模型→碰撞校核→基于模型对钢结构节点进行补充和安装处理→基于BIM模型出图",[611,614,617,620,623,625],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":6,"category":7,"favorite":8},534,{"id":626,"name":627,"category":7,"favorite":8},536,"安全人A证"]