[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,15,50,1302,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,343,353,365,375,387,398,410,422,434,446,455,467,479,491,503,515,527,539,551,563,572,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},857918,1,"单选题","项目质量控制是为了确保项目达到客户所规定的质量要求所实施的一系列管理过程，其不包含以下哪项内容？()",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","项目质量规划",false,{"key":24,"text":25,"correct":22},"B","项目质量控制",{"key":27,"text":28,"correct":29},"C","项目质量提升",true,{"key":31,"text":32,"correct":22},"D","项目质量保证","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},857919,"以下关于BIM技术在设计阶段的应用说法错误的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"空间形式的思考是BIM技术在概念设计中应用的体现",{"key":24,"text":41,"correct":22},"空间造型设计就是对建筑进行空间流线的概念化设计",{"key":27,"text":43,"correct":29},"室内装饰的色彩选择不属于BIM技术在概念设计中应用的体现",{"key":31,"text":45,"correct":22},"空间形式及研究的初步阶段在概念设计中称其为区段划分，是设计概念运用中首要考虑的部分",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},857920,"下列选项不属于BIM技术在施工企业投标阶段的应用优势的是( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"更好地展示技术方案",{"key":24,"text":53,"correct":22},"获得更好的结算利润",{"key":27,"text":55,"correct":22},"提升竞标能力，提升中标率",{"key":31,"text":57,"correct":29},"工程变更管理",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},857921,"下列哪个选项符合BIM时代的协同方式？()",[62,64,66,68],{"key":20,"text":63,"correct":22},"各专业将本专业的信息条件以电子版和打印出的纸质文件的形式发送给接收专业",{"key":24,"text":65,"correct":22},"过程是单向进行的，并且是阶段性的",{"key":27,"text":67,"correct":22},"采用参考链接文件的形式，保持设计过程中建筑底图的及时更新",{"key":31,"text":69,"correct":29},"项目采用可视化、参数化、动态化协同管理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},857922,"下面哪项是属于施工图设计阶段的应用点？()",[74,76,78,80],{"key":20,"text":75,"correct":22},"场地规划",{"key":24,"text":77,"correct":22},"方案比选",{"key":27,"text":79,"correct":29},"结构分析",{"key":31,"text":81,"correct":22},"性能分析",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},857923,"下列关于一体化管理的特点说法不正确的是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"一体化管理强调合作理念，各参与方不把对方视为对手，把工作重点放在如何保证和扩大共同利益",{"key":24,"text":89,"correct":22},"一体化管理强调各方提前参与。各参与方均提前参与至项目中，设计阶段向决策阶段渗透，施工阶段向设计阶段渗透，运营阶段向施工阶段渗透",{"key":27,"text":91,"correct":29},"一体化管理以施工单位为主要管理方。施工单位承担项目全生命周期目标、费用、进度管理，同时在各阶段沟通各方达到一体化管理目标",{"key":31,"text":93,"correct":22},"一体化管理以信息一体化为基础。要求各方、各阶段信息透明、共享。各方能以非常小的信息成本获得足够的、透明的所需信息",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},857924,"()的引入，将对造价咨询单位在整个建设全生命期项目管理工作中对工程量的管控发挥质的提升",[98,100,102,104],{"key":20,"text":99,"correct":22},"广联达算量",{"key":24,"text":101,"correct":22},"鲁班算量",{"key":27,"text":103,"correct":29},"BIM技术",{"key":31,"text":105,"correct":22},"清华斯维尔算量",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},857925,"项目后评价的步骤为()。",[110,112,114,116],{"key":20,"text":111,"correct":29},"提出问题→筹划准备→深入调查，搜集资料→分析研究→编制项目后评价报告",{"key":24,"text":113,"correct":22},"提出问题→深入调查，搜集资料→筹划准备→分析研究→编制项目后评价报告",{"key":27,"text":115,"correct":22},"提出问题→筹划准备→分析研究→深入调查，搜集资料→编制项目后评价报告",{"key":31,"text":117,"correct":22},"提出问题→深入调查，搜集资料→分析研究→筹划准备→编制项目后评价报告",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},857926,"项目全过程管理就指工程项目管理企业按照合同约定，在工程项目()阶段，为业主编制可行性研究报告，进行可行性分析和项目策划。",[122,124,126,128],{"key":20,"text":123,"correct":29},"决策",{"key":24,"text":125,"correct":22},"设计",{"key":27,"text":127,"correct":22},"施工",{"key":31,"text":129,"correct":22},"投标",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},857927,"基于BIM的深化设计可以笼统地分为两类，包括专业性深化设计和()。",[134,136,138,140],{"key":20,"text":135,"correct":29},"综合性深化设计",{"key":24,"text":137,"correct":22},"平面深化设计",{"key":27,"text":139,"correct":22},"立面深化设计",{"key":31,"text":141,"correct":22},"协调深化设计",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},857928,"管线优化设计应遵循以下原则不正确的是？( )",[146,148,150,152],{"key":20,"text":147,"correct":22},"在非管线穿梁、碰柱、穿吊顶等必要情况下，尽量不要改动",{"key":24,"text":149,"correct":29},"软碰撞也必须进行修改，以满足设计要求",{"key":27,"text":151,"correct":22},"管线优化设计时，应预留安装、检修空间",{"key":31,"text":153,"correct":22},"管线避让原则如下：有压管让无压管；小管线让大管线；施工简单管让施工复杂管；冷水管道避让热水管道；附件少的管道避让附件多的管道；临时管道避让永久管道",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},857929,"在设计阶段项目管理工作中应用BIM技术的最终目的是()。",[158,160,162,164],{"key":20,"text":159,"correct":29},"提高项目设计自身效率",{"key":24,"text":161,"correct":22},"降低项目成本",{"key":27,"text":163,"correct":22},"提高项目设计质量",{"key":31,"text":165,"correct":22},"便于项目设计信息管理",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},857930,"以下哪项不属于建设项目全生命期一体化的管理模式？()",[170,172,174,176],{"key":20,"text":171,"correct":29},"施工方一体化",{"key":24,"text":173,"correct":22},"参与方一体化",{"key":27,"text":175,"correct":22},"管理要素一体化",{"key":31,"text":177,"correct":22},"管理过程一体化",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},857931,"业主单位在设计阶段通过组织( )，可以提前发现概念设计、方案设计中潜在的风险和问题，便于及时进行方案调整和决策。",[182,184,186,188],{"key":20,"text":183,"correct":22},"参加各方人员",{"key":24,"text":185,"correct":22},"设计人员",{"key":27,"text":187,"correct":29},"BIM技术应用",{"key":31,"text":189,"correct":22},"Revit技术应用",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},857932,"空间管理主要是满足组织在空间方面的各种分析及管理需求，更好地响应组织内各部门对于空间分配的请求及高效处理日常相关事务，空间管理的内容不包括()。",[194,196,198,200],{"key":20,"text":195,"correct":22},"空间分配",{"key":24,"text":197,"correct":22},"空间规划",{"key":27,"text":199,"correct":22},"租赁管理",{"key":31,"text":201,"correct":29},"数据管理",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},857933,"深化设计阶段的应用点不包括()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"管线综合深化设计",{"key":24,"text":209,"correct":22},"土建结构深化设计",{"key":27,"text":211,"correct":22},"钢结构深化设计",{"key":31,"text":213,"correct":29},"施工方案深化设计",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},857934,"建设项目全生命期一体化管理( PLIM)模式是指由( )牵头，专业咨询方全面负责，从各主要参与方中分别选出一至两名专家组成全生命期一体化项目管理组，将全生命期中各主要参与方、各管理内容、各项目管理阶段有机结合起来，实现组织、资源、目标、责任和利益等一体化。",[218,220,222,224],{"key":20,"text":219,"correct":29},"业主单位",{"key":24,"text":221,"correct":22},"咨询单位",{"key":27,"text":223,"correct":22},"设计单位",{"key":31,"text":225,"correct":22},"施工单位",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},857935,"维护管理主要指的是()的维护管理。",[230,232,234,236],{"key":20,"text":231,"correct":22},"专业",{"key":24,"text":233,"correct":22},"结构",{"key":27,"text":235,"correct":29},"设备",{"key":31,"text":237,"correct":22},"成本",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},857936,"利用BIM技术对结构模型进行性能分析，不包括哪个方面？()",[242,244,246,248],{"key":20,"text":243,"correct":22},"能耗分析",{"key":24,"text":245,"correct":22},"光照分析",{"key":27,"text":247,"correct":29},"成本分析",{"key":31,"text":249,"correct":22},"绿色评估",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},857937,"整个工程项目建设造价控制的关键阶段是( )。",[254,256,258,260],{"key":20,"text":255,"correct":29},"设计阶段",{"key":24,"text":257,"correct":22},"施工阶段",{"key":27,"text":259,"correct":22},"运维阶段",{"key":31,"text":261,"correct":22},"使用阶段",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":27,"analysis":33},857938,"BIM技术在温度监测中，BIM运维平台中可以获取建筑中()的相关信息数据。",[266,268,270,272],{"key":20,"text":267,"correct":22},"模型整体",{"key":24,"text":269,"correct":22},"BIM模型中任意一点",{"key":27,"text":271,"correct":29},"温度测点",{"key":31,"text":273,"correct":22},"空调位置点",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},857939,"以下关于在施工方案管理的说法错误的是()。",[278,280,282,284],{"key":20,"text":279,"correct":22},"BIM建模的过程就是虚拟施工的过程",{"key":24,"text":281,"correct":22},"虚拟施工技术不仅可以检测和比较施工方案，还可以优化施工方案",{"key":27,"text":283,"correct":22},"利用BIM技术进行三维动态展现施工现场布置，划分功能区域，便于场地分析",{"key":31,"text":285,"correct":29},"施工方案是可以重复利用的",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},857940,"基于BIM技术的高度可视化、协同性和( )的特性，建筑师在概念设计阶段可实现在设计思路上的快速精确表达的同时实现与各领域工程师无障碍信息交流与传递，从而实现了设计初期的质量、信息管理的可视化和协同化。",[290,292,294,296],{"key":20,"text":291,"correct":29},"参数化",{"key":24,"text":293,"correct":22},"集成性",{"key":27,"text":295,"correct":22},"易操控性",{"key":31,"text":297,"correct":22},"兼容性",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},857941,"设计单位对BIM项目管理的需求不包括()。",[302,304,306,308],{"key":20,"text":303,"correct":22},"提高设计质量",{"key":24,"text":305,"correct":22},"提高设计效率",{"key":27,"text":307,"correct":29},"施工模拟",{"key":31,"text":309,"correct":22},"可视化的设计会审",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},857942,"绿色建筑评价与BIM应用不包括()。",[314,316,318,320],{"key":20,"text":315,"correct":22},"节能与能源利用",{"key":24,"text":317,"correct":22},"室内质量环境",{"key":27,"text":319,"correct":29},"结构可靠性",{"key":31,"text":321,"correct":22},"提高与创新",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},857943,"以下关于BIM的建筑热工和耗能模拟分析错误的是( )。",[326,328,330,332],{"key":20,"text":327,"correct":22},"建筑节能必须从建筑方案规划、建筑设备系统的设计开始",{"key":24,"text":329,"correct":29},"建筑耗能模拟不需要BIM信息，只需按照空气系统对建筑进行分区就可以完成耗能模拟",{"key":27,"text":331,"correct":22},"建筑耗能模拟可以帮助进行建筑冷\u002F热负荷计算，进而选取合理的空调设备",{"key":31,"text":333,"correct":22},"在设计建筑或改造既有建筑时，对建筑进行耗能分析，可以优化设计和节能改造方案",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},857944,"方案设计阶段BIM应用主要包括利用BIM技术进行概念设计、()和方案比选。",[338,339,340,342],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":341,"correct":22},"工程算量",{"key":31,"text":75,"correct":29},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},857945,"初步设计阶段的BIM应用不包括以下哪个选项()。",[347,348,349,351],{"key":20,"text":79,"correct":22},{"key":24,"text":81,"correct":22},{"key":27,"text":350,"correct":29},"建筑施工模拟",{"key":31,"text":352,"correct":22},"工程算量统计",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":27,"analysis":33},857946,"以下关于IPD说法错误的是()。",[357,359,361,363],{"key":20,"text":358,"correct":22},"IPD的全称是集成产品开发",{"key":24,"text":360,"correct":22},"IPD是一套产品开发的模式、理念与方法",{"key":27,"text":362,"correct":29},"IPD模式在建设领域的应用体现为，在动工后，业主召集设计方、施工方、材料供应商、监理方等各参建方一起做出一个BIM模型",{"key":31,"text":364,"correct":22},"采用IPD模式后，施工过程中不需要再返回设计院改图，材料供应商也不会随便更改材料，进行方案变更",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},857947,"( )是项目的最终实现者，是竣工模型的创建者。",[369,371,372,374],{"key":20,"text":370,"correct":22},"管理单位",{"key":24,"text":223,"correct":22},{"key":27,"text":373,"correct":22},"验收单位",{"key":31,"text":225,"correct":29},{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":27,"analysis":33},857948,"下列选项关于BIM技术在建造准备阶段中的应用说法不正确的是()。",[379,381,383,385],{"key":20,"text":380,"correct":22},"基于建立的BIM三维模型及搭建的各种临时设施，可以对施工场地进行布置，合理安排塔吊、库房、加工厂地和生活区等的位置，解决现场施工场地平面布置问题",{"key":24,"text":382,"correct":22},"基于BIM技术的虚拟施工管理在项目实施过程中带来的好处主要体现在施工方法可视化、施工方法验证过程化及施工组织控制化等三个方面",{"key":27,"text":384,"correct":29},"BIM技术在建造准备阶段的应用内容主要包括施工方案管理、关键工艺展示及物料跟踪管理",{"key":31,"text":386,"correct":22},"针对钢结构部分，因其关键构件及部位安装相对复杂，采用BIM技术对其安装过程进行模拟能够有效帮助指导施工",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":24,"analysis":33},857949,"施工过程的顺利实施是在有效的施工方案指导下进行的，施工方案的制定主要是根据项目经理、项目总工程师及()的经验",[391,392,394,396],{"key":20,"text":223,"correct":22},{"key":24,"text":393,"correct":29},"项目部",{"key":27,"text":395,"correct":22},"施工人员",{"key":31,"text":397,"correct":22},"监理部门",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":31,"analysis":33},857950,"下列哪个选项不属于协同平台的功能？( )",[402,404,406,408],{"key":20,"text":403,"correct":22},"建筑模型信息存储功能",{"key":24,"text":405,"correct":22},"具有图形编辑平台",{"key":27,"text":407,"correct":22},"兼容建筑专业应用软件",{"key":31,"text":409,"correct":29},"质量控制功能",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":27,"analysis":33},857951,"不可预见自然因素、工程外部环境和建筑风格潮流变化导致工程变更，属于()。",[414,416,418,420],{"key":20,"text":415,"correct":22},"业主原因",{"key":24,"text":417,"correct":22},"设计原因",{"key":27,"text":419,"correct":29},"环境原因",{"key":31,"text":421,"correct":22},"其他原因",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":24,"analysis":33},857952,"BIM模型与EcotectAnalysis软件之间的信息交换是()。",[426,428,430,432],{"key":20,"text":427,"correct":22},"双向的",{"key":24,"text":429,"correct":29},"不完全双向的",{"key":27,"text":431,"correct":22},"单向的",{"key":31,"text":433,"correct":22},"不完全单向的",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":31,"analysis":33},857953,"目前的设计方式多为( )设计，各专业分工作业，依赖人工协调项目内容和分段，这也导致设计往往存在专业间的碰撞。",[438,440,442,444],{"key":20,"text":439,"correct":22},"连续式",{"key":24,"text":441,"correct":22},"独立式",{"key":27,"text":443,"correct":22},"关联式",{"key":31,"text":445,"correct":29},"隔断式",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":20,"analysis":33},857954,"下列哪个选项不属于设计单位对BIM项目管理的需求？()",[450,452,453,454],{"key":20,"text":451,"correct":29},"安全管理",{"key":24,"text":305,"correct":22},{"key":27,"text":303,"correct":22},{"key":31,"text":309,"correct":22},{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":27,"analysis":33},857955,"以下哪项不属于“三控三管一协调”中的“三控”的一部分？()",[459,461,463,465],{"key":20,"text":460,"correct":22},"工程进度控制",{"key":24,"text":462,"correct":22},"工程质量控制",{"key":27,"text":464,"correct":29},"工程人力资源控制",{"key":31,"text":466,"correct":22},"工程投资(成本)控制",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},857956,"下列关BIM在钢结构深化设计中的应用说法错误的是( )。",[471,473,475,477],{"key":20,"text":472,"correct":22},"钢结构BIM三维实体建模出图进行深化设计的过程，其本质就是进行电脑预拼装，实现“所见即所得”的过程",{"key":24,"text":474,"correct":22},"所有加工详图(包括布置图、构件图、零件图等)均是利用三视图原理投影剖面生成的深化图纸",{"key":27,"text":476,"correct":22},"采用BIM技术对钢网架复杂节点进行深化设计，提前对重要部位的安装进行动态展示、施工方案预演和比选，可以更加直观化的传递施工",{"key":31,"text":478,"correct":29},"意图，避免二次返工",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},857957,"下列不属于运维与设施管理的内容的是()。",[483,485,487,489],{"key":20,"text":484,"correct":22},"空间管理",{"key":24,"text":486,"correct":22},"资产管理",{"key":27,"text":488,"correct":29},"质量管理",{"key":31,"text":490,"correct":22},"公共安全管理",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},857958,"BIM不仅可实现三维可视化，它还是一个()关联数据库。",[495,497,499,501],{"key":20,"text":496,"correct":29},"6D",{"key":24,"text":498,"correct":22},"5D",{"key":27,"text":500,"correct":22},"4D",{"key":31,"text":502,"correct":22},"3D",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},857959,"下列关于基于BIM的采光模拟分析说法不正确的是( )。",[507,509,511,513],{"key":20,"text":508,"correct":22},"静态采光模拟软件可以模拟某一时间点建筑采光的静态图像和光学数据",{"key":24,"text":510,"correct":22},"动态采光模拟软件可以依据项目所属区域的全年气象数据逐时计算工作面的天然光照度，以此为基础，可以得出全年人工照明产生的能耗，为照明节能控制策略的制定提供数据支持",{"key":27,"text":512,"correct":29},"BIM模型与Ecotectnalysis软件之间的信息交换是完全双向的",{"key":31,"text":514,"correct":22},"按照模拟对象及状态的不同，建筑采光模拟软件大致可分为静态和动态两大类",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},857960,"以下关于设备维护流程的顺序正确的是()。",[519,521,523,525],{"key":20,"text":520,"correct":29},"设备信息查询——设备运行及控制——设备保修——计划性维护",{"key":24,"text":522,"correct":22},"设备运行及控制——设备信息查询——设备保修——计划性维护",{"key":27,"text":524,"correct":22},"设备信息查询——设备保修——设备运行及控制——计划性维护",{"key":31,"text":526,"correct":22},"设备运行及控制——设备信息查询——计划性维护——设备保修",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":24,"analysis":33},857961,"()作为项目的最高决策者，负责监督和管理PLMT，对项目负有最终的决策控制权，最终决定项目实施方并签订合同，同时组织、领导和监管各项工作。",[531,533,535,537],{"key":20,"text":532,"correct":22},"运营方",{"key":24,"text":534,"correct":29},"业主方",{"key":27,"text":536,"correct":22},"设计方",{"key":31,"text":538,"correct":22},"监理方",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":20,"analysis":33},857962,"基于BIM的工程量计算属于BIM应用模式中的( )。",[543,545,547,549],{"key":20,"text":544,"correct":29},"单业务应用",{"key":24,"text":546,"correct":22},"多业务集成应用",{"key":27,"text":548,"correct":22},"综合业务集成应用",{"key":31,"text":550,"correct":22},"与项目管理的集成应用",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":24,"analysis":33},857963,"信息技术的发展使基于BIM的物联网资产管理系统可以通过在()的资产标签芯片中注入依用户需要的详细参数信息和定期提醒设置，同时结合三维虚拟实体的BIM技术使资产在智慧建筑物中的定位和相关参数信息一目了然，可以精确定位、快速查阅。",[555,557,559,561],{"key":20,"text":556,"correct":22},"BIBM",{"key":24,"text":558,"correct":29},"RFID",{"key":27,"text":560,"correct":22},"IFRT",{"key":31,"text":562,"correct":22},"RGIB",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":31,"analysis":33},857964,"初步设计阶段BIM应用不包括()。",[567,568,569,570],{"key":20,"text":341,"correct":22},{"key":24,"text":79,"correct":22},{"key":27,"text":81,"correct":22},{"key":31,"text":571,"correct":29},"结构优化",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":31,"analysis":33},857965,"()是项目的最终实现者，是竣工模型的创建者，其关注点是现场实施，关心BIM如何与项目结合，如何提高效率和降低成本。",[576,577,579,580],{"key":20,"text":223,"correct":22},{"key":24,"text":578,"correct":22},"监督单位",{"key":27,"text":219,"correct":22},{"key":31,"text":225,"correct":29},{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},857966,"下列选项不属于工程变更的表现形式的是( )。",[585,587,589,591],{"key":20,"text":586,"correct":29},"碰撞优化",{"key":24,"text":588,"correct":22},"更改工程有关部位的标高、位置和尺寸",{"key":27,"text":590,"correct":22},"增减合同中约定的工程量",{"key":31,"text":592,"correct":22},"改变工程质量、性质或工程类型",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},857967,"基于BIM技术的协同设计是指建立统一的()。",[597,599,601,603],{"key":20,"text":598,"correct":29},"设计标准",{"key":24,"text":600,"correct":22},"文件格式",{"key":27,"text":602,"correct":22},"交流平台",{"key":31,"text":604,"correct":22},"实施方案",[606,609,612,615,618,620],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":6,"category":7,"favorite":8},534,{"id":621,"name":622,"category":7,"favorite":8},536,"安全人A证"]