[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,12,50,1302,[13,34,46,58,70,82,94,106,118,130,142,151,163,173,185,197,209,221,233,244,255,266,278,290,302,314,326,335,347,359,371,383,393,404,415,427,439,451,463,475,485,493,505,517,529,541,553,565,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},857765,1,"单选题","BIM技术的核心是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","信息化",false,{"key":24,"text":25,"correct":26},"B","协同",true,{"key":28,"text":29,"correct":22},"C","参数化",{"key":31,"text":32,"correct":22},"D","可视化","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},857766,"基于BIM的物料管理通过建立( )，使项目部各岗位人员及企业不同部门都可以进行数据的查询和分析，为项目部材料管理和决策提供数据支撑。",[38,40,42,44],{"key":20,"text":39,"correct":22},"三维可视化建筑几何模型",{"key":24,"text":41,"correct":26},"安装材料BIM模型数据库",{"key":28,"text":43,"correct":22},"碰撞检查BIM模型数据库",{"key":31,"text":45,"correct":22},"BIM模型变更数据库",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},857767,"建设项目全生命期一体化管理(PLIM)模式是指由业主单位牵头，()全面负责，从各主要参与方中分别选出一至两名专家组成全生命期一体化项目管理组，将全生命期中各主要参与方、各管理内容、各项目管理阶段有机结合起来，实现组织、资源、目标、责任和利益等一体化。",[50,52,54,56],{"key":20,"text":51,"correct":22},"业主单位",{"key":24,"text":53,"correct":26},"专业咨询方",{"key":28,"text":55,"correct":22},"设计单位",{"key":31,"text":57,"correct":22},"施工单位",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},857768,"基于BIM的工程项目质量管理包括()质量管理及技术质量管理。",[62,64,66,68],{"key":20,"text":63,"correct":26},"产品",{"key":24,"text":65,"correct":22},"进度",{"key":28,"text":67,"correct":22},"成本",{"key":31,"text":69,"correct":22},"材料",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},857769,"下列选项关于深化设计说法不正确的是( )。",[74,76,78,80],{"key":20,"text":75,"correct":22},"深化设计是指在业主或设计顾问提供的条件图或原理图的基础上，结合施工现场实际情况，对图纸进行细化补充和完善",{"key":24,"text":77,"correct":26},"专业性深化设计应该在建设单位提供的综合性BIM模型上进行",{"key":28,"text":79,"correct":22},"综合性深化设计指的是对各专业深化设计初步成果进行集成、协调、修订与校核，并形成综合平面图、综合管线图",{"key":31,"text":81,"correct":22},"管线综合深化设计是指将施工图设计阶段完成的机电管线进一步综合排布，根据管线的不同的性质、不同的功能和不同的施工要求，结合建筑装修的要求，进行统筹的管线位置排布",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},857770,"初步设计方和施工图设计方为主要责任方，初步设计方以可行性研究报告、概念设计、规划要求为主要设计依据，通过()与其他各方就设计方案进行反复讨论，确定符合规划的设计方案和规划图，获得业主单位的认可后，将规划图与设计方案交予施工图设计方，施工图设计方同样综合考虑各方意见后形成施工图。",[86,88,90,92],{"key":20,"text":87,"correct":22},"PKPM",{"key":24,"text":89,"correct":26},"PLMT",{"key":28,"text":91,"correct":22},"FTM",{"key":31,"text":93,"correct":22},"IPMU",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},857771,"运维与设施管理的主要内容不包括()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"空间管理",{"key":24,"text":101,"correct":22},"资产管理",{"key":28,"text":103,"correct":26},"成本管理",{"key":31,"text":105,"correct":22},"公共安全管理",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},857772,"下列哪个选项不属于设计单位对BIM项目管理的需求()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"提高设计效率",{"key":24,"text":113,"correct":26},"施工模拟",{"key":28,"text":115,"correct":22},"提高设计质量",{"key":31,"text":117,"correct":22},"可视化的设计会审",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},857773,"下列选项关于BIM技术在预制加工管理中的应用说法不正确的是( )。",[122,124,126,128],{"key":20,"text":123,"correct":26},"BIM技术在预制加工管理中的应用主要体现在构件加工详图出具、构件加工材料质量控制、构件生产指导及构件详细信息全过程查询",{"key":24,"text":125,"correct":22},"通过BIM模型对建筑构件的信息化表达，可在相关软件中根据BIM模型自动生成构件加工图",{"key":28,"text":127,"correct":22},"在生产加工过程中，BIM信息化技术可直观表达构件的空间关系及各种参数情况，能够自动生成构件下料单、派工单、模具规格参数等生产表单",{"key":31,"text":129,"correct":22},"基于BIM信息模型结合智能加工设备，可实现对构件数字化自动加工制造",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},857774,"下列选项中不属于项目管理的内容的是()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"项目范围管理",{"key":24,"text":137,"correct":22},"项目成本管理",{"key":28,"text":139,"correct":26},"项目设计管理",{"key":31,"text":141,"correct":22},"人力资源管理",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},857775,"建设工程生产过程中的总集成者兼组织者是()。",[146,147,148,149],{"key":20,"text":51,"correct":26},{"key":24,"text":55,"correct":22},{"key":28,"text":57,"correct":22},{"key":31,"text":150,"correct":22},"监理单位",{"id":152,"libraryId":5,"type":15,"typeLabel":16,"stem":153,"options":154,"answer":31,"analysis":33},857776,"下列哪个选项不属于项目全过程管理的内容？( )",[155,157,159,161],{"key":20,"text":156,"correct":22},"在工程项目决策阶段，为业主编制可行性研究报告",{"key":24,"text":158,"correct":22},"在工程项目设计阶段，负责完成合同约定的工程设计等工作",{"key":28,"text":160,"correct":22},"在工程项目实施阶段，为业主提供招标代理、采购管理等工作",{"key":31,"text":162,"correct":26},"在工程项目运营阶段，为业主提供物业管理等工作",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":31,"analysis":33},857777,"项目管理的内容不包括()。",[167,168,170,171],{"key":20,"text":135,"correct":22},{"key":24,"text":169,"correct":22},"项目时间管理",{"key":28,"text":137,"correct":22},{"key":31,"text":172,"correct":26},"项目规模管理",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},857778,"下列选项不属于编制BIM实施计划内容的是()。",[177,179,181,183],{"key":20,"text":178,"correct":22},"实施目标",{"key":24,"text":180,"correct":22},"组织机构",{"key":28,"text":182,"correct":22},"进度计划",{"key":31,"text":184,"correct":26},"经验总结",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":20,"analysis":33},857779,"基于BIM技术的垂直交通管理主要指的是( )。",[189,191,193,195],{"key":20,"text":190,"correct":26},"电梯管理",{"key":24,"text":192,"correct":22},"走廊管理",{"key":28,"text":194,"correct":22},"阳台管理",{"key":31,"text":196,"correct":22},"大厅管理",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":31,"analysis":33},857780,"以下不属于公共安全管理的是()。",[201,203,205,207],{"key":20,"text":202,"correct":22},"火灾报警",{"key":24,"text":204,"correct":22},"安全防范",{"key":28,"text":206,"correct":22},"应急联动",{"key":31,"text":208,"correct":26},"巡检管理",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":24,"analysis":33},857781,"下列关于建筑全生命周期一体化说法正确的是()。",[213,215,217,219],{"key":20,"text":214,"correct":22},"在建设项目实施阶段，设计方为主要责任和协调方",{"key":24,"text":216,"correct":26},"在建设项目设计阶段，初步设计方和施工图设计方为主要责任方",{"key":28,"text":218,"correct":22},"在建设项目运营阶段，业主方为主要负责人",{"key":31,"text":220,"correct":22},"建设项目决策阶段，设计方为主要责任和协调方",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":28,"analysis":33},857782,"初步设计阶段BIM应用主要方面不包括( )。",[225,227,229,231],{"key":20,"text":226,"correct":22},"利用BIM技术进行结构分析",{"key":24,"text":228,"correct":22},"利用BIM技术进行性能分析",{"key":28,"text":230,"correct":26},"利用BIM技术进行场地规划",{"key":31,"text":232,"correct":22},"利用BIM技术进行工程算量",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},857783,"BIM最重要的特征是()。",[237,238,240,242],{"key":20,"text":32,"correct":26},{"key":24,"text":239,"correct":22},"协调性",{"key":28,"text":241,"correct":22},"模拟性",{"key":31,"text":243,"correct":22},"科学性",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":20,"analysis":33},857784,"BIM运维平台对电梯的实际使用情况进行了渲染，物业管理人员可以清楚直观地看到电梯地能耗及使用状况，通过对人行动线、人流量的分析，可以帮助管理者更好地对电梯系统的策略进行调整。上述属于()。",[248,250,251,253],{"key":20,"text":249,"correct":26},"垂直交通管理",{"key":24,"text":101,"correct":22},{"key":28,"text":252,"correct":22},"租赁管理",{"key":31,"text":254,"correct":22},"办公管理",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":28,"analysis":33},857785,"下列选项中属于维护管理的是( )。",[259,260,262,264],{"key":20,"text":204,"correct":22},{"key":24,"text":261,"correct":22},"转移使用",{"key":28,"text":263,"correct":26},"维护计划",{"key":31,"text":265,"correct":22},"消防管理",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":28,"analysis":33},857786,"设计方的项目管理工作主要在哪个阶段进行？()",[270,272,274,276],{"key":20,"text":271,"correct":22},"施工阶段",{"key":24,"text":273,"correct":22},"动用前准备阶段",{"key":28,"text":275,"correct":26},"设计阶段",{"key":31,"text":277,"correct":22},"设计前的准备阶段",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":24,"analysis":33},857787,"从项目管理的角度，BIM技术与项目管理的集成应用在现阶段主要IPD模式和()模式。",[282,284,286,288],{"key":20,"text":283,"correct":22},"EPC",{"key":24,"text":285,"correct":26},"VDC",{"key":28,"text":287,"correct":22},"IFC",{"key":31,"text":289,"correct":22},"IDM",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":31,"analysis":33},857788,"下列不属于项目BIM实施的保证措施的选项是( )。",[294,296,298,300],{"key":20,"text":295,"correct":22},"建立系统运行检查机制",{"key":24,"text":297,"correct":22},"建立系统运行保障体系",{"key":28,"text":299,"correct":22},"建立系统运行例会制度",{"key":31,"text":301,"correct":26},"建立系统运行实施标准",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},857789,"设计成果中最重要的表现形式就是()。",[306,308,310,312],{"key":20,"text":307,"correct":22},"计算书",{"key":24,"text":309,"correct":26},"施工图",{"key":28,"text":311,"correct":22},"结构模型",{"key":31,"text":313,"correct":22},"建筑模型",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},857790,"PLIM模式下()是项目的最高决策者，负责监督和管理PLMT。",[318,320,322,324],{"key":20,"text":319,"correct":22},"设计方",{"key":24,"text":321,"correct":26},"业主",{"key":28,"text":323,"correct":22},"运营方",{"key":31,"text":325,"correct":22},"监理方",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":20,"analysis":33},857791,"在进行建筑设计时，经常由于各专业设计师之间沟通不到位，而出现各种专业之间的碰撞问题，利用BIM的()特性可以帮助处理这种问题。",[330,331,332,334],{"key":20,"text":239,"correct":26},{"key":24,"text":32,"correct":22},{"key":28,"text":333,"correct":22},"优化性",{"key":31,"text":241,"correct":22},{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},857792,"工程变更管理属于BIM技术在( )中的应用内容。",[339,341,343,345],{"key":20,"text":340,"correct":22},"施工招投标阶段",{"key":24,"text":342,"correct":22},"深化设计阶段",{"key":28,"text":344,"correct":22},"建造准备阶段",{"key":31,"text":346,"correct":26},"建造阶段",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},857793,"以下关于建筑全生命周期一体化管理模式说法错误的是()。",[351,353,355,357],{"key":20,"text":352,"correct":26},"建设项目全生命期一体化管理(PLIM)模式是指由施工单位牵头，专业咨询方全面负责，从各主要参与方中分别选出一至两名专家一起组成全生命期一体化项目管理组",{"key":24,"text":354,"correct":22},"建设项目全生命期一体化管理模式主要涵盖了三个方面：参与方一体化、管理要素一体化、管理过程一体化",{"key":28,"text":356,"correct":22},"参与方一体化的实现，有利于各方打破服务时间，服务范围和服务内容上的界限，促进管理过程一体化和管理要素一体化",{"key":31,"text":358,"correct":22},"管理过程一体化的实现，又要求打破管理阶段界面，对管理要素一体化的实施起了一定的促进管理作用",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":28,"analysis":33},857794,"()是对建筑物的定位、建筑物的空间方位及外观、建筑物和周边环境的关系、建筑物将来的车流、物流、人流等各方面的因素进行集成数据分析的综合。",[363,365,367,369],{"key":20,"text":364,"correct":22},"总体规划",{"key":24,"text":366,"correct":22},"方案设计",{"key":28,"text":368,"correct":26},"场地分析",{"key":31,"text":370,"correct":22},"建筑性能分析",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},857795,"下面哪项属于BIM技术与项目管理的集成应用在现阶段的模式？( )",[375,377,379,381],{"key":20,"text":376,"correct":22},"单业务模式",{"key":24,"text":378,"correct":26},"VDC模式",{"key":28,"text":380,"correct":22},"协同模式",{"key":31,"text":382,"correct":22},"全过程模式",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":28,"analysis":33},857796,"()指的是为了从项目实施组织之外获得所需资源或服务所采取的一系列管理措施。",[387,388,390,392],{"key":20,"text":135,"correct":22},{"key":24,"text":389,"correct":22},"项目质量管理",{"key":28,"text":391,"correct":26},"项目采购管理",{"key":31,"text":169,"correct":22},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},857797,"下列选项属于BIM技术在项目建造准备阶段的应用的是()。",[397,399,400,402],{"key":20,"text":398,"correct":22},"安全管理",{"key":24,"text":103,"correct":22},{"key":28,"text":401,"correct":22},"质量管理",{"key":31,"text":403,"correct":26},"虚拟施工管理",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":24,"analysis":33},857798,"设计方无论采用何种BIM技术应用形式和技术手段、技术工具，其核心都是( )",[408,410,411,413],{"key":20,"text":409,"correct":22},"加快设计进度",{"key":24,"text":115,"correct":26},{"key":28,"text":412,"correct":22},"降低设计成本",{"key":31,"text":414,"correct":22},"完善设计意图",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},857799,"以下关于建筑施工图说法正确的是()。",[419,421,423,425],{"key":20,"text":420,"correct":22},"目前已经能通过BIM软件进行自动出图",{"key":24,"text":422,"correct":22},"在BIM技术不断发展的今天，施工图将会逐渐被建筑三维模型取代",{"key":28,"text":424,"correct":26},"二维施工图纸不能用于空间表达，使得图纸存在一些意想不到的碰撞盲区",{"key":31,"text":426,"correct":22},"施工图某个局部设计变更，不会影响到其他图纸",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},857800,"项目管理的特点不包括()。",[431,433,435,437],{"key":20,"text":432,"correct":22},"目的性",{"key":24,"text":434,"correct":22},"集成性",{"key":28,"text":436,"correct":22},"独特性",{"key":31,"text":438,"correct":26},"随意性",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":28,"analysis":33},857801,"下列选项不属于BIM技术在结构分析的应用的是( )。",[443,445,447,449],{"key":20,"text":444,"correct":22},"通过IFC或Structure Modelenter数据计算模型",{"key":24,"text":446,"correct":22},"开展抗震、抗风、抗火等结构性能设计",{"key":28,"text":448,"correct":26},"基于BIM技术对建筑能耗进行计算、评估，进而开展能耗性能优化",{"key":31,"text":450,"correct":22},"结构计算结果存储在BIM模型或信息管理平台中，便于后续应用",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},857802,"5D模型的组成内容不包括()。",[455,457,459,461],{"key":20,"text":456,"correct":22},"三维建筑几何模型",{"key":24,"text":458,"correct":22},"施工组织方案",{"key":28,"text":460,"correct":26},"荷载及其作用力学性能",{"key":31,"text":462,"correct":22},"成本及造价",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},857803,"基于BIM技术的工程算量不包括()。",[467,469,471,473],{"key":20,"text":468,"correct":22},"土石方工程",{"key":24,"text":470,"correct":22},"混凝土构件",{"key":28,"text":472,"correct":22},"钢筋",{"key":31,"text":474,"correct":26},"人员工作量",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},857804,"下列选项不属于BIM技术在空间管理中的应用的是( )。",[479,481,482,483],{"key":20,"text":480,"correct":22},"车库管理",{"key":24,"text":252,"correct":22},{"key":28,"text":249,"correct":22},{"key":31,"text":484,"correct":26},"家具管理",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":24,"analysis":33},857805,"作为项目发起方，()应将建设工程的全寿命过程以及建设工程的各参与单位集成对建设工程进行管理，应站在全方位的角度来设定各参与方的权责利与分工。",[489,490,491,492],{"key":20,"text":150,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":57,"correct":22},{"key":31,"text":55,"correct":22},{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":28,"analysis":33},857806,"基于BIM的深化设计通过各专业工程师与设计公司的分工合作优化能够针对设计存在问题，迅速对接、核对、相互补位、提醒、反馈信息和整合到位，其深化设计流程为()。",[497,499,501,503],{"key":20,"text":498,"correct":22},"制作专业精准模型→综合链接模型→数据集成→碰撞检测→分析和修改碰撞点→最终完成内装的BIM模型",{"key":24,"text":500,"correct":22},"制作专业精准模型→碰撞检测→分析和修改碰撞点→综合链接模型→数据集成→最终完成内装的BIM模型",{"key":28,"text":502,"correct":26},"制作专业精准模型→综合链接模型→碰撞检测→分析和修改碰撞点→数据集成→最终完成内装的BIM模型",{"key":31,"text":504,"correct":22},"制作专业精准模型→碰撞检测→分析和修改碰撞点→数据集成→综合链接模型→最终完成内装的BIM模型",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":31,"analysis":33},857807,"建设项目全生命期一体化管理模式不包括以下哪个方面？( )",[509,511,513,515],{"key":20,"text":510,"correct":22},"参与方一体化",{"key":24,"text":512,"correct":22},"管理要素一体化",{"key":28,"text":514,"correct":22},"管理过程一体化",{"key":31,"text":516,"correct":26},"管理方法一体化",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},857808,"相比于之前的设施管理技术而言，BIM技术的优势不包括()。",[521,523,525,527],{"key":20,"text":522,"correct":22},"实现信息集成和共享",{"key":24,"text":524,"correct":26},"实现设施的一体化操控",{"key":28,"text":526,"correct":22},"实现设施的可视化管理",{"key":31,"text":528,"correct":22},"定位建筑构件",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":31,"analysis":33},857809,"在场地分析过程中，基于BIM技术结合( )可对现场及拟建建筑物空间进行建模分析，结合场地使用条件和特点，做出最理想的现场规划及交通流线组织。",[533,535,537,539],{"key":20,"text":534,"correct":22},"物联网",{"key":24,"text":536,"correct":22},"云技术",{"key":28,"text":538,"correct":22},"智能全站仪",{"key":31,"text":540,"correct":26},"GIS",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":20,"analysis":33},857810,"下列选项属于钢深化设计内容的是()。",[545,547,549,551],{"key":20,"text":546,"correct":26},"杆件连接节点深化",{"key":24,"text":548,"correct":22},"管线支吊架设计",{"key":28,"text":550,"correct":22},"门窗等构件深化",{"key":31,"text":552,"correct":22},"钢筋绑扎位置及绑扎顺序深化",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},857811,"协同平台具有的功能中不包括()。",[557,559,561,563],{"key":20,"text":558,"correct":22},"建筑模型信息存储功能",{"key":24,"text":560,"correct":22},"具有图形编辑平台",{"key":28,"text":562,"correct":22},"兼容建筑专业应用软件",{"key":31,"text":564,"correct":26},"控制成本",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":28,"analysis":33},857812,"下列选项不属于BIM在工程项目质量管理中的应用点的是( )。",[569,571,573,575],{"key":20,"text":570,"correct":22},"建模前期协同设计",{"key":24,"text":572,"correct":22},"碰撞检测",{"key":28,"text":574,"correct":26},"灾害应急管理",{"key":31,"text":576,"correct":22},"大体积混凝土测温",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},857814,"下列关于绿色建筑的说法错误的是()。",[581,583,585,587],{"key":20,"text":582,"correct":26},"绿色建筑的“绿色”，就是指一般意义的立体绿化、屋顶花园的建筑",{"key":24,"text":584,"correct":22},"绿色建筑在运维阶段可通过环保技术、节能技术、自动化控制技术等一系列先进的理念和方法来解决节能、环保等问题",{"key":28,"text":586,"correct":22},"BIM在绿色运维中的应用主要包括对各类能源消耗的实时监测和改进，及楼宇智能化系统管理两个方面",{"key":31,"text":588,"correct":22},"绿色建筑的运营管理部分主要涉及物业管理、绿化管理、垃圾管理、智能化系统管理等方面",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":31,"analysis":33},857815,"温度监测是属于BIM技术在( )中的应用。",[593,594,595,596],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":22},{"key":28,"text":105,"correct":22},{"key":31,"text":597,"correct":26},"能耗管理",[599,602,605,608,611,613],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":6,"category":7,"favorite":8},534,{"id":614,"name":615,"category":7,"favorite":8},536,"安全人A证"]