[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,11,50,1302,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,426,438,450,462,474,484,496,508,520,532,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},857714,1,"单选题","以下不包含在【系统】—【电气】功能区的命令有()。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","电缆桥架",false,{"key":24,"text":25,"correct":22},"B","线管",{"key":27,"text":28,"correct":29},"C","桥架配件",true,{"key":31,"text":32,"correct":22},"D","线管配件","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},857715,"RPC植物族在以下哪个视觉样式中会显示渲染外观？()",[38,40,42,44],{"key":20,"text":39,"correct":22},"线框",{"key":24,"text":41,"correct":22},"一致的颜色",{"key":27,"text":43,"correct":29},"真实",{"key":31,"text":45,"correct":22},"着色",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},857716,"以下不属于Revit中梁的结构用途是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"大梁",{"key":24,"text":53,"correct":29},"支梁",{"key":27,"text":55,"correct":22},"托梁",{"key":31,"text":57,"correct":22},"檩条",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},857717,"视觉样式用于控制模型在视图中显示方式，下列显示模式中显示效果最差但速度最快的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"隐藏线模式",{"key":24,"text":65,"correct":29},"线框模式",{"key":27,"text":67,"correct":22},"着色模式",{"key":31,"text":69,"correct":22},"一致的颜色模式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},857718,"在系统浏览器列设置中，以下哪些不可以在电气列中勾选显示？()",[74,76,78,80],{"key":20,"text":75,"correct":22},"系统类型",{"key":24,"text":77,"correct":29},"尺寸",{"key":27,"text":79,"correct":22},"配电系统",{"key":31,"text":81,"correct":22},"长度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},857719,"下列哪项不是Revit提供的基础形式？()",[86,88,90,92],{"key":20,"text":87,"correct":22},"独立基础",{"key":24,"text":89,"correct":29},"桩基础",{"key":27,"text":91,"correct":22},"条形基础",{"key":31,"text":93,"correct":22},"基础底板",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},857720,"一项目漫游动画模型共是800帧，先设置从300帧到600帧导出，根据“帧\u002F秒”为20，这样这段截取的漫游动画总时间为()",[98,100,102,104],{"key":20,"text":99,"correct":29},"15秒",{"key":24,"text":101,"correct":22},"20秒",{"key":27,"text":103,"correct":22},"30秒",{"key":31,"text":105,"correct":22},"40秒",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},857721,"以下哪个是族样板选用的第一原则？()",[110,112,114,116],{"key":20,"text":111,"correct":22},"族的使用方式",{"key":24,"text":113,"correct":22},"族样板的活用",{"key":27,"text":115,"correct":22},"族样板的特殊功能",{"key":31,"text":117,"correct":29},"族类别的确定",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},857722,"不包含在对象样式设置类型的一项是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"模型对象",{"key":24,"text":125,"correct":22},"导人对象",{"key":27,"text":127,"correct":29},"视图对象",{"key":31,"text":129,"correct":22},"分析模型对象",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},857723,"下列不是Revit提供的规程的是？()",[134,136,138,140],{"key":20,"text":135,"correct":29},"暖通",{"key":24,"text":137,"correct":22},"电气",{"key":27,"text":139,"correct":22},"机械",{"key":31,"text":141,"correct":22},"卫浴",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},857724,"在管理链接中添加Revit模型，导入\u002F链接RVT界面后可选择的定位方式()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"自动—原点到远点",{"key":24,"text":149,"correct":29},"手动—原点",{"key":27,"text":151,"correct":22},"自动—中心到中心",{"key":31,"text":153,"correct":22},"自动—通过共享坐标",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},857725,"在管线综合排布过程中，管径为200mm的非保温管道间的中心距最小为()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"300mm",{"key":24,"text":161,"correct":29},"350mm",{"key":27,"text":163,"correct":22},"400mm",{"key":31,"text":165,"correct":22},"450mm",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},857726,"下列不属于Revit界面中选项卡类型的是()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"分析",{"key":24,"text":173,"correct":22},"系统",{"key":27,"text":175,"correct":22},"管理",{"key":31,"text":177,"correct":29},"机电",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},857727,"点击项目中已放置的窗，在【修改|窗】栏中不包含以下哪个命令？()",[182,184,186,188],{"key":20,"text":183,"correct":22},"编辑族",{"key":24,"text":185,"correct":29},"载入族",{"key":27,"text":187,"correct":22},"拾取新主体",{"key":31,"text":189,"correct":22},"拾取主要主体",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},857728,"“线样式”中包含的样式，以下哪个样式是错误的？()",[194,196,198,200],{"key":20,"text":195,"correct":22},"线颜色",{"key":24,"text":197,"correct":22},"线性图案",{"key":27,"text":199,"correct":22},"线宽",{"key":31,"text":201,"correct":29},"线长",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},857729,"将1F的柱及柱标记粘贴至2F的正确操作是：框选1F结构平面视图中所有图元，配合使用过滤器选择所有柱及柱标记，配合使用【复制到剪贴板】选择()的方式粘贴至2F。",[206,208,210,212],{"key":20,"text":207,"correct":22},"【与选定的标高对齐】",{"key":24,"text":209,"correct":22},"【与当前视图对齐】",{"key":27,"text":211,"correct":29},"【与选定的视图对齐】",{"key":31,"text":213,"correct":22},"【与同一位置对齐】",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},857730,"天花板平面视图范围设置正确的一组为()。",[218,219,220,221],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":29},{"key":27,"text":27,"correct":22},{"key":31,"text":31,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},857731,"在管道“类型属性”的对话框下，“布管系统配置”不包括下列哪个选项？()",[226,228,230,232],{"key":20,"text":227,"correct":29},"三通",{"key":24,"text":229,"correct":22},"弯头",{"key":27,"text":231,"correct":22},"首选连接类型",{"key":31,"text":233,"correct":22},"过渡件",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":31,"analysis":33},857732,"下列关于编辑明细表操作的描述，错误的选项是()。",[238,240,242,244],{"key":20,"text":239,"correct":22},"在创建明细表后，可能需要按成组列修改明细表的组织和结构",{"key":24,"text":241,"correct":22},"通过在明细表中单击单元格可以编辑该单元格",{"key":27,"text":243,"correct":22},"对于按类型成组的明细表，对类型的修改会传递到项目中同类型的全部实例",{"key":31,"text":245,"correct":29},"对于按类型成组的明细表，对类型的修改不会自动传递到项目中同类型的全部实例",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},857733,"建筑BIM自动翻模不能实现的功能是？()",[250,252,254,256],{"key":20,"text":251,"correct":22},"智能读取施工图DWG中的轴线编号，在Revit端创建带正确编号的轴线",{"key":24,"text":253,"correct":22},"智能读取门窗的编号，并将门窗编号中的高度信息提取出来作为门窗高度数据",{"key":27,"text":255,"correct":22},"支持天正、理正等多种建筑软件绘制的建筑施工DWG图",{"key":31,"text":257,"correct":29},"根据墙的外立面施工图来创建模型外立面构件",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":31,"analysis":33},857734,"工程监理的委托权由哪个单位拥有()。",[262,264,266,268],{"key":20,"text":263,"correct":22},"设计单位",{"key":24,"text":265,"correct":22},"施工单位",{"key":27,"text":267,"correct":22},"监理单位",{"key":31,"text":269,"correct":29},"建设单位",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},857735,"以下不属于绿色建筑对CFD软件计算分析的要求的是()。",[274,276,278,280],{"key":20,"text":275,"correct":22},"热导强度要求",{"key":24,"text":277,"correct":22},"人行区风速要求",{"key":27,"text":279,"correct":22},"自然通风要求",{"key":31,"text":281,"correct":29},"成本控制要求",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},857736,"静态采光模拟软件可以模拟某一时间点建筑采光的静态图像和()。",[286,288,290,292],{"key":20,"text":287,"correct":29},"光学数据",{"key":24,"text":289,"correct":22},"光环境",{"key":27,"text":291,"correct":22},"阴影遮挡",{"key":31,"text":293,"correct":22},"可视度",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},857737,"节能在绿色环保方面具体有两种体现，一是帮助建筑形成资源的循环使用，二是()。",[298,300,302,304],{"key":20,"text":299,"correct":22},"建筑材料使用方面进行节省",{"key":24,"text":301,"correct":29},"实现建筑自身的减排",{"key":27,"text":303,"correct":22},"减少机械设备的能耗",{"key":31,"text":305,"correct":22},"精简人员的使用",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":31,"analysis":33},857738,"按照相关管理规定，我国建设项目在设计阶段的造价控制主要是方案设计阶段的设计估算和初步设计阶段的()。",[310,312,314,316],{"key":20,"text":311,"correct":22},"设计预算",{"key":24,"text":313,"correct":22},"设计初算",{"key":27,"text":315,"correct":22},"设计结算",{"key":31,"text":317,"correct":29},"设计概算",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":24,"analysis":33},857739,"下列关于深化设计说法不正确的是？()",[322,324,326,328],{"key":20,"text":323,"correct":22},"是为了将设计师的设计理念、设计意图在施工过程中得道充分体现",{"key":24,"text":325,"correct":29},"是为了增强管理者对施工过程的控制能力",{"key":27,"text":327,"correct":22},"是为了在满足甲方需求的前提下，使施工图更加符合现场实际情况，是施工单位的施工理念在设计阶段的延伸",{"key":31,"text":329,"correct":22},"是为了更好地为甲方服务，满足现场不断变化的需求，优化设计方案在现场实施的过程，是为了达到满足功能的前提下降低成本，为企业创造更多利润",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},857740,"冲突检查过程是需要计划与组织管理的过程，冲突检查人员也被称作()，他们将负责对检查结果进行记录、提交、跟踪提醒与覆盖确认。",[334,336,338,340],{"key":20,"text":335,"correct":22},"BIM质检工程师",{"key":24,"text":337,"correct":29},"BIM协调工程师",{"key":27,"text":339,"correct":22},"BIM管理工程师",{"key":31,"text":341,"correct":22},"BIM分析工程师",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":27,"analysis":33},857741,"利用BIM技术可以对施工场地废弃物的排放、放置进行模拟，以达到减排的目的，具体方法不包括()。",[346,348,350,352],{"key":20,"text":347,"correct":22},"用BIM模型编制专项方案对工地的废水、废弃、废渣的三废排放进行识别、评价和控制安排专人、专项经费，制定专项措施，减少工地现场的三废排放",{"key":24,"text":349,"correct":22},"根据BIM模型对施工区域的施工废水设置沉淀池，进行沉淀处理后重复使用或合规排放对泥浆及其他不能简单处理的废水集中交由专业单位处理",{"key":27,"text":351,"correct":29},"施工垃圾就地焚烧填埋，使用密目式安全网、定期浇水等措施减少施工现场的扬尘",{"key":31,"text":353,"correct":22},"利用BIM模型合理安排噪声源的放置位置及使用时间，采用有效的噪声防护措施，减少噪声排放",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},857742,"初步设计阶段BIM主要应用不包括()。",[358,360,362,364],{"key":20,"text":359,"correct":22},"结构分析",{"key":24,"text":361,"correct":22},"性能分析",{"key":27,"text":363,"correct":29},"方案比选",{"key":31,"text":365,"correct":22},"工程算量",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},857743,"整个设计阶段开始于()。",[370,372,374,376],{"key":20,"text":371,"correct":29},"概念设计",{"key":24,"text":373,"correct":22},"空间设计",{"key":27,"text":375,"correct":22},"装饰设计",{"key":31,"text":377,"correct":22},"建筑设计",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":27,"analysis":33},857744,"以下哪一项不属于BIM技术在工程进度管理上的应用？()",[382,384,386,388],{"key":20,"text":383,"correct":22},"可视化的工程进度安排",{"key":24,"text":385,"correct":22},"对工程建设过程的模拟",{"key":27,"text":387,"correct":29},"对工程施工进度的调控",{"key":31,"text":389,"correct":22},"对工程材料和设备供应过程的优化",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":24,"analysis":33},857745,"建筑能耗模拟模型与BIM模型的差异不包括()。",[394,396,398,400],{"key":20,"text":395,"correct":22},"建筑能耗模拟需要对BIM模型简化",{"key":24,"text":397,"correct":29},"结构尺寸不完全一样",{"key":27,"text":399,"correct":22},"补充建筑构件的热工特性参数",{"key":31,"text":401,"correct":22},"负荷时间表",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},857746,"下列关于运维单位项目管理说法不正确的是()。",[406,408,410,412],{"key":20,"text":407,"correct":22},"规划设计阶段的物业前期介入",{"key":24,"text":409,"correct":29},"工程建设阶段的物业规划",{"key":27,"text":411,"correct":22},"接管前的承接查验",{"key":31,"text":413,"correct":22},"综合竣工验收后的项目移交接管",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},857747,"以下不属于冲突检查的工作的是()。",[418,420,422,424],{"key":20,"text":419,"correct":22},"建筑与结构专业",{"key":24,"text":421,"correct":22},"结构与设备专业",{"key":27,"text":423,"correct":22},"设备内部各专业",{"key":31,"text":425,"correct":29},"设备与室外装修",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},857748,"基于BIM的室内声学分析流程是()。",[430,432,434,436],{"key":20,"text":431,"correct":29},"BIM建模→导入几何模型→模型简化→导入室内分析软件→输出结果",{"key":24,"text":433,"correct":22},"BIM建模→模型简化→导入几何模型→导入室内分析软件→输出结果",{"key":27,"text":435,"correct":22},"BIM建模→导入几何模型→导入室内分析软件→模型简化→输出结果",{"key":31,"text":437,"correct":22},"导入几何模型→BIM建模→模型简化→导入室内分析软件→输出结果",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},857749,"下列不属于在业主单位设计管理阶段的BIM技术应用是()。",[442,444,446,448],{"key":20,"text":443,"correct":22},"协同工作",{"key":24,"text":445,"correct":22},"基于精细化设计理念的数字化模拟与评估",{"key":27,"text":447,"correct":22},"复杂空间表达",{"key":31,"text":449,"correct":29},"快速出图",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":27,"analysis":33},857750,"基于BIM的三维设计能够精确表达建筑的()。",[454,456,458,460],{"key":20,"text":455,"correct":22},"立面特征",{"key":24,"text":457,"correct":22},"表面特征",{"key":27,"text":459,"correct":29},"几何特征",{"key":31,"text":461,"correct":22},"建筑特征",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},857751,"BIM技术在设计阶段的主要任务不包括()。",[466,468,470,472],{"key":20,"text":467,"correct":22},"进度控制",{"key":24,"text":469,"correct":29},"深化设计",{"key":27,"text":471,"correct":22},"安全管理",{"key":31,"text":473,"correct":22},"质量控制",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":20,"analysis":33},857752,"建设项目决策阶段，()为主要责任和协调方，负责收集来自各方的信息，确定初步方案并反馈给业主单位。",[478,480,481,482],{"key":20,"text":479,"correct":29},"PLMT",{"key":24,"text":263,"correct":22},{"key":27,"text":265,"correct":22},{"key":31,"text":483,"correct":22},"咨询单位",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},857753,"BIM技术在施工企业投标阶段的应用优势不正确的是()。",[488,490,492,494],{"key":20,"text":489,"correct":22},"更好地展示技术方案",{"key":24,"text":491,"correct":22},"获得更好的结算利润",{"key":27,"text":493,"correct":22},"提升竞标能力，提升中标率",{"key":31,"text":495,"correct":29},"提高施工效率",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":27,"analysis":33},857755,"BIM项目管理的()就是要紧紧围绕BIM技术在项目管理中进行运用这条主线，从各环节的关键点人手，实现关键节点的可控，从而使整体项目管理BIM技术运用的质量得到提高，从而实现项目建设的整体目标。",[500,502,504,506],{"key":20,"text":501,"correct":22},"协同控制",{"key":24,"text":503,"correct":22},"监督控制",{"key":27,"text":505,"correct":29},"节点控制",{"key":31,"text":507,"correct":22},"过程控制",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},857756,"基于BIM技术进行设计阶段的造价控制具有较高的()。",[512,514,516,518],{"key":20,"text":513,"correct":22},"可控性",{"key":24,"text":515,"correct":29},"可实施性",{"key":27,"text":517,"correct":22},"可视性",{"key":31,"text":519,"correct":22},"可调性",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":20,"analysis":33},857757,"以下关于BIM与施工质量管理的说法错误的是()。",[524,526,528,530],{"key":20,"text":525,"correct":29},"施工单位是工程高质量的最大受益者，也是工程质量的主要决策人",{"key":24,"text":527,"correct":22},"BIM是项目管理人员控制工程质量的有效手段",{"key":27,"text":529,"correct":22},"利用BIM模型和施工方案进行虚拟环境数据集成，对建设项目的可建设性进行仿真实验，可在事前发现质量问题",{"key":31,"text":531,"correct":22},"BIM为业主提供形象的三维设计，业主可以更明确地表达自己对工程质量的要求",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},857758,"BIM在方案阶段的应用内容不包括()。",[536,537,538,540],{"key":20,"text":359,"correct":29},{"key":24,"text":371,"correct":22},{"key":27,"text":539,"correct":22},"场地规划",{"key":31,"text":363,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":31,"analysis":33},857759,"BIM技术在建造阶段上对预制加工管理的应用不包括()。",[545,547,549,551],{"key":20,"text":546,"correct":22},"生成构件加工详图",{"key":24,"text":548,"correct":22},"进行构件生产指导",{"key":27,"text":550,"correct":22},"通过BIM实现预制构件的数字化制造",{"key":31,"text":552,"correct":29},"检查构件质量是否达标",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":31,"analysis":33},857760,"建设项目全生命周期一体化管理模式相对于传统项目管理模式更加注重项目参与方目标的平衡、()和并行工程的应用。",[557,559,561,563],{"key":20,"text":558,"correct":22},"协调",{"key":24,"text":560,"correct":22},"合作",{"key":27,"text":562,"correct":22},"控制",{"key":31,"text":564,"correct":29},"信息有效流通",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":31,"analysis":33},857761,"BIM性能分析不包括()以下哪个方面。",[569,571,573,575],{"key":20,"text":570,"correct":22},"能耗分析",{"key":24,"text":572,"correct":22},"光照分析",{"key":27,"text":574,"correct":22},"设备分析",{"key":31,"text":576,"correct":29},"管道分析",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},857762,"以下关于项目管理协同的说法错误的是()。",[581,583,585,587],{"key":20,"text":582,"correct":29},"协同即协调两个以上的不同资源或者个体，协同一致地完成某一目标的过程",{"key":24,"text":584,"correct":22},"在项目实施过程中对各参与方在各阶段进行信息数据协同管理具有非常重大的意义",{"key":27,"text":586,"correct":22},"在平面CAD时代，协同是一个单向的过程",{"key":31,"text":588,"correct":22},"基于BIM技术的协同平台的利用，可实现各信息、人员的集成和协同，大大提高了项目管理的效率",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":24,"analysis":33},857763,"维护管理是运维与设施管理的主要内容之一，以下不属于维护管理的内容的是()。",[593,595,597,599],{"key":20,"text":594,"correct":22},"维护计划",{"key":24,"text":596,"correct":29},"设备保养",{"key":27,"text":598,"correct":22},"巡检管理",{"key":31,"text":600,"correct":22},"保修管理",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":31,"analysis":33},857764,"以下哪项不属于“三控三管一协调”中的“三管”的一部分？( )",[605,607,609,611],{"key":20,"text":606,"correct":22},"合同管理",{"key":24,"text":608,"correct":22},"职业健康安全与环境管理",{"key":27,"text":610,"correct":22},"信息管理",{"key":31,"text":612,"correct":29},"成本管理",[614,617,620,623,626,628],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":6,"category":7,"favorite":8},534,{"id":629,"name":630,"category":7,"favorite":8},536,"安全人A证"]