[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-535-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},535,"BIM工程师","建筑工程",0,1,50,1302,[13,33,45,57,69,81,93,105,117,129,141,153,164,176,188,200,212,224,236,248,260,272,284,296,308,320,332,343,355,367,379,391,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,577,589,601],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},857201,"单选题","根据建筑经济对设计信息模型的交付要求，()级建模精细度建筑信息模型应支持施工图预算、工程量清单与招标控制价",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","100",false,{"key":23,"text":24,"correct":21},"B","200",{"key":26,"text":27,"correct":28},"C","300",true,{"key":30,"text":31,"correct":21},"D","400","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},857202,"1122",[37,39,41,43],{"key":19,"text":38,"correct":28},"首先建立网格及楼层线，然后导人CAD文档，接着建立柱梁板墙等组件，而后进行彩现，最后进行明细表或CAD输出",{"key":23,"text":40,"correct":21},"首先进行彩现，然后导入CAD文档，接着建立柱梁板墙等组件，而后建立网格及楼层线，最后进行明细表或CAD输出",{"key":26,"text":42,"correct":21},"首先建立网格及楼层线，然后进行彩现，接着导人CAD文档，而后建立柱梁板墙等组件，最后进行明细表或CAD输出",{"key":30,"text":44,"correct":21},"首先建立网格及楼层线，然后导入CAD文档，接着建立柱梁板墙等组件，而后进行明细表或CAD输出，最后进行彩现",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},857203,"下列软件主要是将业主设计任务书里面基于数字的项目要求转化成基于几何形体的建筑方案，并用于业主和设计师之间的沟通和方案研究论证的是()。",[49,51,53,55],{"key":19,"text":50,"correct":28},"BIM概念设计软件",{"key":23,"text":52,"correct":21},"BIM核心建模软件",{"key":26,"text":54,"correct":21},"BIM分析软件",{"key":30,"text":56,"correct":21},"BIM审图软件",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":30,"analysis":32},857204,"基于BIM技术的5D施工管理软件的关键能力是()。",[61,63,65,67],{"key":19,"text":62,"correct":21},"支持进度与模型的关联",{"key":23,"text":64,"correct":21},"支持施工过程结构跟踪和记录",{"key":26,"text":66,"correct":21},"可以进行施工模拟",{"key":30,"text":68,"correct":28},"支持流水段划分",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},857205,"在确定技术路线的过程中根据BIM应用的主要业务目标和项目、团队、企业的实际情况来选择“合适”的()从而完成相应的BIM应用内容。",[73,75,77,79],{"key":19,"text":74,"correct":21},"硬件",{"key":23,"text":76,"correct":28},"软件",{"key":26,"text":78,"correct":21},"工作环境",{"key":30,"text":80,"correct":21},"时间工期",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":19,"analysis":32},857206,"BIM能源运行管理即通过BIM模型对租户的能源使用情况进行监控与管理，赋予每个能源使用记录表以()，在管理系统中及时做好信息的收集处理。",[85,87,89,91],{"key":19,"text":86,"correct":28},"传感功能",{"key":23,"text":88,"correct":21},"感应功能",{"key":26,"text":90,"correct":21},"计算功能",{"key":30,"text":92,"correct":21},"统计功能",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":23,"analysis":32},857207,"2015年6月，住房和城乡建设部《关于推进建筑信息模型应用的指导意见》中明确规定：到()末，建筑行业甲级勘察、设计单位以及特级、一级房屋建筑工程施工企业应掌握并实现BIM与企业管理系统和其他信息技术的一体化集成应用。",[97,99,101,103],{"key":19,"text":98,"correct":21},"2016年",{"key":23,"text":100,"correct":28},"2020年",{"key":26,"text":102,"correct":21},"2025年",{"key":30,"text":104,"correct":21},"2030年",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":23,"analysis":32},857208,"()是一个确保和记录所有的系统和部件都能按照明细和最终用户要求以及业主运营需要执行其相应功能的系统化过程。",[109,111,113,115],{"key":19,"text":110,"correct":21},"项目策划",{"key":23,"text":112,"correct":28},"项目试运行",{"key":26,"text":114,"correct":21},"项目监督",{"key":30,"text":116,"correct":21},"项目总结",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":23,"analysis":32},857209,"()表示的是在不同的模型精细度下，建筑工程信息模型所容纳的几何信息和非几何信息的单元大小和健全程度。",[121,123,125,127],{"key":19,"text":122,"correct":21},"模型精细度",{"key":23,"text":124,"correct":28},"信息粒度",{"key":26,"text":126,"correct":21},"建模精度",{"key":30,"text":128,"correct":21},"建模几何精细度",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":26,"analysis":32},857210,"根据《建筑工程设计信息模型交付标准》，施工结算阶段对应的建模精细度应为()。",[133,135,137,139],{"key":19,"text":134,"correct":21},"LOD300",{"key":23,"text":136,"correct":21},"LOD400",{"key":26,"text":138,"correct":28},"LOD500",{"key":30,"text":140,"correct":21},"LOD600",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":23,"analysis":32},857211,"目前IFC标准的信息交换与共享主要是通()过实现的。",[145,147,149,151],{"key":19,"text":146,"correct":21},"IFC数据直接输入输出",{"key":23,"text":148,"correct":28},"IFC平台",{"key":26,"text":150,"correct":21},"COBIE标准转换",{"key":30,"text":152,"correct":21},"COBIE平台",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":30,"analysis":32},857212,"()英文称作LevelofDetails，也叫作LevelofDevelopment。描述了一个BIM模型构件单元从最低级的近似概念化的程度发展到最高级的演示级精度的步骤。",[157,159,160,162],{"key":19,"text":158,"correct":21},"模型协同程度",{"key":23,"text":124,"correct":21},{"key":26,"text":161,"correct":21},"模型可视化程度",{"key":30,"text":163,"correct":28},"模型的细致程度",{"id":165,"libraryId":5,"type":9,"typeLabel":15,"stem":166,"options":167,"answer":23,"analysis":32},857213,"下列BIM应用技术路线中，实施起来可能性最小的是()。",[168,170,172,174],{"key":19,"text":169,"correct":21},"商务部门利用相关软件建立自己的模型，从而完成工程算量等；同时，技术部门利用相关软件建立自己的模型，从而完成深化设计、施工模拟等",{"key":23,"text":171,"correct":28},"商务部门利用相关软件建立自己的模型，从而完成工程算量等；然后，技术部门利用商务部门的模型，来完成深化设计、施工模拟等",{"key":26,"text":173,"correct":21},"技术部门利用相关软件建立自己的模型，从而完成深化设计、施工模拟等，然后，商务部门利用技术部门的模型，来完成工程算量等",{"key":30,"text":175,"correct":21},"商务部门利用相关软件建立自己的模型，从而完成工程算量等；然后，技术部门利用相关软件对商务部门的模型进行深化，从而完成深化设计、施工模拟等",{"id":177,"libraryId":5,"type":9,"typeLabel":15,"stem":178,"options":179,"answer":26,"analysis":32},857214,"下列选项中，属于BIM协调性功能之一，并且该功能通过BIM三维可视化控件及程序自动检测，可对建筑物内机电管线和设备进行直观布置模拟安装，还可调整其他构件尺寸的功能是()。",[180,182,184,186],{"key":19,"text":181,"correct":21},"成本预算",{"key":23,"text":183,"correct":21},"工程量估算协调",{"key":26,"text":185,"correct":28},"设计协调",{"key":30,"text":187,"correct":21},"整体进度规划协调",{"id":189,"libraryId":5,"type":9,"typeLabel":15,"stem":190,"options":191,"answer":23,"analysis":32},857215,"下列选项中，关于BIM技术与CAD技术在基本元素方面的对比中不正确的是()。",[192,194,196,198],{"key":19,"text":193,"correct":21},"CAD的基本元素为点、线、面",{"key":23,"text":195,"correct":28},"CAD的基本元素都具有专业意义",{"key":26,"text":197,"correct":21},"BIM的基本元素为建筑构件",{"key":30,"text":199,"correct":21},"BIM的基本元素不但具有几何特性，也具有建筑物特征",{"id":201,"libraryId":5,"type":9,"typeLabel":15,"stem":202,"options":203,"answer":23,"analysis":32},857216,"下列选项关于BIM组织架构说法不正确的是()。",[204,206,208,210],{"key":19,"text":205,"correct":21},"BIM组织架构的建立即BIM团队的构建，是项目目标能否实现的重要影响因素",{"key":23,"text":207,"correct":28},"领导层主要设置行政主管，其主要负责该项目的对外沟通协调，包括与甲方互动沟通、与项目其他参与方协调等",{"key":26,"text":209,"correct":21},"管理层主要设置技术主管，其主要负责将BIM项目经理的项目任务安排落实到BIM操作人员，同时对BIM项目在各阶段实施过程中进行技术指导及监督",{"key":30,"text":211,"correct":21},"作业层主要设置建模团队、分析团队和咨询团队",{"id":213,"libraryId":5,"type":9,"typeLabel":15,"stem":214,"options":215,"answer":23,"analysis":32},857217,"在项目BIM实施过程中软件资源配置不包括()",[216,218,220,222],{"key":19,"text":217,"correct":21},"根据应用内容及结合企业自身情况合理选择BIM软件",{"key":23,"text":219,"correct":28},"根据软件对运行环境的具体需求，对相应电脑配置进行重新匹配",{"key":26,"text":221,"correct":21},"根据甲方具体要求以及同项目各参与方进行协同，合理选择软件版本，对不符合要求的版本软件进行相应的升级",{"key":30,"text":223,"correct":21},"根据具体需求自主研发或委托软件开发公司进行相应的实用性软件开发",{"id":225,"libraryId":5,"type":9,"typeLabel":15,"stem":226,"options":227,"answer":23,"analysis":32},857218,"按照数据交换格式的公开与否，BIM应用软件的数据交换方式可以分为两种，一种是基于公开的国际标准的数据交换方式，另一种是基于私有文件格式的数据交换方式。下列选项中属于基于公开的国际标准的数据交换方式的是()。",[228,230,232,234],{"key":19,"text":229,"correct":21},"DWG",{"key":23,"text":231,"correct":28},"COBIE",{"key":26,"text":233,"correct":21},"GFC",{"key":30,"text":235,"correct":21},"NWC",{"id":237,"libraryId":5,"type":9,"typeLabel":15,"stem":238,"options":239,"answer":19,"analysis":32},857219,"基于BIM技术的碰撞检查应用中的缺陷检测是属于()。",[240,242,244,246],{"key":19,"text":241,"correct":28},"软碰撞检查",{"key":23,"text":243,"correct":21},"硬碰撞检查",{"key":26,"text":245,"correct":21},"综合碰撞检查",{"key":30,"text":247,"correct":21},"专项碰撞检查",{"id":249,"libraryId":5,"type":9,"typeLabel":15,"stem":250,"options":251,"answer":19,"analysis":32},857220,"BIM实施模式不包括()。",[252,254,256,258],{"key":19,"text":253,"correct":28},"政府主导管理模式",{"key":23,"text":255,"correct":21},"设计主导管理模式",{"key":26,"text":257,"correct":21},"咨询辅助管理模式",{"key":30,"text":259,"correct":21},"业主自主管理模式",{"id":261,"libraryId":5,"type":9,"typeLabel":15,"stem":262,"options":263,"answer":26,"analysis":32},857221,"下列关于BIM工程师说法不正确的是()。",[264,266,268,270],{"key":19,"text":265,"correct":21},"建筑信息模型(BIM)系列专业技能岗位是指工程建模、BIM管理咨询和战略分析方面等相关岗位",{"key":23,"text":267,"correct":21},"从事BIM相关工程技术及其管理的人员可称为BIM工程师",{"key":26,"text":269,"correct":28},"根据BIM应用程度可将BIM工程师主要分为BIM战略总监、BIM项目经理、BIM操作人员及BIM理论研究人员等",{"key":30,"text":271,"correct":21},"BIM工具研发类即主要负责BIM工具的设计开发工作人员，可分为BIM产品设计人员及BIM软件开发人员",{"id":273,"libraryId":5,"type":9,"typeLabel":15,"stem":274,"options":275,"answer":23,"analysis":32},857222,"BIM的设计可视化即在设计阶段将建筑及构件以()的方式直观呈现出来。",[276,278,280,282],{"key":19,"text":277,"correct":21},"二维",{"key":23,"text":279,"correct":28},"三维",{"key":26,"text":281,"correct":21},"四维",{"key":30,"text":283,"correct":21},"五维",{"id":285,"libraryId":5,"type":9,"typeLabel":15,"stem":286,"options":287,"answer":26,"analysis":32},857223,"下列关于传统方法和BIM技术在工程项目进度管理的应用的说法中不正确的是()。",[288,290,292,294],{"key":19,"text":289,"correct":21},"三维模型的可视化有效地解决了施工人员的读图问题，可减少施工成品与设计图纸不符的现象发生",{"key":23,"text":291,"correct":21},"三维模型的碰撞检查能够有效规避设计成果中的冲突和矛盾，从而缓解二维图纸很难检查错误和矛盾的问题",{"key":26,"text":293,"correct":28},"BIM可以解决劳动力不足以及消极怠工问题",{"key":30,"text":295,"correct":21},"BIM技术的应用可以缓解进度计划编制中存在的问题",{"id":297,"libraryId":5,"type":9,"typeLabel":15,"stem":298,"options":299,"answer":19,"analysis":32},857224,"下列选项关于LOD的说法不正确的是()。",[300,302,304,306],{"key":19,"text":301,"correct":28},"建筑工程中的初步设计和施工图设计需要达到的建模精度为LOD100",{"key":23,"text":303,"correct":21},"LOD的定义可以用于两种途径：确定模型阶段输出结果以及分配建模任务",{"key":26,"text":305,"correct":21},"从概念设计到竣工设计，LOD被定义为5个等级，分别为LOD100到LOD500",{"key":30,"text":307,"correct":21},"随着设计的进行，不同的建模构件单元会以不同的速度从一个LOD等级提升到下一个",{"id":309,"libraryId":5,"type":9,"typeLabel":15,"stem":310,"options":311,"answer":30,"analysis":32},857225,"下列选项中不属于BIM工程应用类工程师岗位职责的是()。",[312,314,316,318],{"key":19,"text":313,"correct":21},"业主和开发商中的管理人员",{"key":23,"text":315,"correct":21},"设计机构中的设计人员",{"key":26,"text":317,"correct":21},"施工企业中的施工技术人员",{"key":30,"text":319,"correct":28},"软件开发设计人员",{"id":321,"libraryId":5,"type":9,"typeLabel":15,"stem":322,"options":323,"answer":23,"analysis":32},857226,"咨询辅助管理模式下业主分别同设计单位签订设计合同、同BIM咨询公司签订BIM咨询服务合同，先由()进行设计，BIM咨询公司根据设计资料进行三维建模，并进行设计、碰撞检查，随后将检查结果及时反馈以减少工程变更。",[324,326,328,330],{"key":19,"text":325,"correct":21},"业主单位",{"key":23,"text":327,"correct":28},"设计单位",{"key":26,"text":329,"correct":21},"施工单位",{"key":30,"text":331,"correct":21},"咨询单位",{"id":333,"libraryId":5,"type":9,"typeLabel":15,"stem":334,"options":335,"answer":19,"analysis":32},857228,"建筑工程信息模型精细度由建模精度和()组成。",[336,337,339,341],{"key":19,"text":124,"correct":28},{"key":23,"text":338,"correct":21},"模型存储空间大小",{"key":26,"text":340,"correct":21},"构件种类",{"key":30,"text":342,"correct":21},"参数维度",{"id":344,"libraryId":5,"type":9,"typeLabel":15,"stem":345,"options":346,"answer":26,"analysis":32},857229,"IFC的总体框架是分层和模块化的()，整体可分为四个层次。",[347,349,351,353],{"key":19,"text":348,"correct":21},"信息交换工具",{"key":23,"text":350,"correct":21},"数据处理器",{"key":26,"text":352,"correct":28},"建筑数据模型",{"key":30,"text":354,"correct":21},"协同工作模式",{"id":356,"libraryId":5,"type":9,"typeLabel":15,"stem":357,"options":358,"answer":19,"analysis":32},857230,"运维仿真的应用内容不包括()。",[359,361,363,365],{"key":19,"text":360,"correct":28},"碰撞检查",{"key":23,"text":362,"correct":21},"设备的运行监控",{"key":26,"text":364,"correct":21},"能源运行管理",{"key":30,"text":366,"correct":21},"建筑空间管理",{"id":368,"libraryId":5,"type":9,"typeLabel":15,"stem":369,"options":370,"answer":30,"analysis":32},857231,"下列选项体现了BIM技术在施工中的应用的是()。",[371,373,375,377],{"key":19,"text":372,"correct":21},"通过创建模型，更好地表达设计意图，突出设计效果，满足业主需求",{"key":23,"text":374,"correct":21},"可视化运维管理，基于BIM三维模型对建筑运维阶段进行直观的、可视化的管理",{"key":26,"text":376,"correct":21},"应急管理决策与模拟，提供实时的数据访问，在没有获取足够信息的情况下，做出应急响应的决策",{"key":30,"text":378,"correct":28},"利用模型进行直观的“预施工”",{"id":380,"libraryId":5,"type":9,"typeLabel":15,"stem":381,"options":382,"answer":26,"analysis":32},857232,"下列选项中处于BIM工程师职业发展的中级阶段的是()。",[383,385,387,389],{"key":19,"text":384,"correct":21},"BIM战略总监",{"key":23,"text":386,"correct":21},"BIM项目经理",{"key":26,"text":388,"correct":28},"BIM技术主管",{"key":30,"text":390,"correct":21},"BIM操作人员",{"id":392,"libraryId":5,"type":9,"typeLabel":15,"stem":393,"options":394,"answer":23,"analysis":32},857233,"业主分别同设计单位签订设计合同、同BIM咨询公司签订BIM咨询服务合同，先由设计单位进行设计，BIM咨询公司根据设计资料进行三维建模，并进行设计、碰撞检查，随后将检查结果及时反馈以减少工程变更。上面描述指的是BIM实施模式中的()。",[395,396,397,398],{"key":19,"text":255,"correct":21},{"key":23,"text":257,"correct":28},{"key":26,"text":259,"correct":21},{"key":30,"text":399,"correct":21},"施工主导管理模式",{"id":401,"libraryId":5,"type":9,"typeLabel":15,"stem":402,"options":403,"answer":30,"analysis":32},857234,"根据《建筑工程设计信息模型分类和编码标准》，下列选项不属于建筑信息模型分类对象的是()。",[404,406,408,410],{"key":19,"text":405,"correct":21},"建设资源",{"key":23,"text":407,"correct":21},"建设进程",{"key":26,"text":409,"correct":21},"建设成果",{"key":30,"text":411,"correct":28},"建筑产品",{"id":413,"libraryId":5,"type":9,"typeLabel":15,"stem":414,"options":415,"answer":30,"analysis":32},857235,"BIM碰撞检查软件继承了各个专业的模型，比单专业的设计软件需要支持的模型更多，对模型的()要求更高。",[416,418,420,422],{"key":19,"text":417,"correct":21},"精度",{"key":23,"text":419,"correct":21},"文件大小",{"key":26,"text":421,"correct":21},"完整程度",{"key":30,"text":423,"correct":28},"显示效率及功能",{"id":425,"libraryId":5,"type":9,"typeLabel":15,"stem":426,"options":427,"answer":26,"analysis":32},857236,"下列选项关于BIM技术在勘察设计阶段中的作用与价值说法不正确的是()。",[428,430,432,434],{"key":19,"text":429,"correct":21},"基于三维设计模型，各专业设计之间可以共享三维设计模型数据，进行专业协同、碰撞检查，避免数据重复录入",{"key":23,"text":431,"correct":21},"基于相应的BIM软件可直接进行建筑、结构、设备等各专业设计，部分专业的二维设计图纸可以根据三维设计模型自动生成",{"key":26,"text":433,"correct":28},"通过BIM结构计算软件，基于三维设计模型辅助施工深化设计并可自动生成施工深化图纸",{"key":30,"text":435,"correct":21},"将三维设计模型的数据导入到各种分析软件中，例如能耗分析、日照分析、风环境分析等软件，能够快速地进行各种分析和模拟",{"id":437,"libraryId":5,"type":9,"typeLabel":15,"stem":438,"options":439,"answer":23,"analysis":32},857237,"下列选项中，负责利用模型进行施工过程荷载验算属于BIM技术应用领域中的()。",[440,442,444,446],{"key":19,"text":441,"correct":21},"BIM与设计",{"key":23,"text":443,"correct":28},"BIM与施工",{"key":26,"text":445,"correct":21},"BIM与造价",{"key":30,"text":447,"correct":21},"BIM与运维",{"id":449,"libraryId":5,"type":9,"typeLabel":15,"stem":450,"options":451,"answer":19,"analysis":32},857238,"()能反映形体的真实形状和大小，度量性好，作图简便。它为工程制图中经常采用的一种投影图。",[452,454,456,458],{"key":19,"text":453,"correct":28},"正投影图",{"key":23,"text":455,"correct":21},"轴测图",{"key":26,"text":457,"correct":21},"透视图",{"key":30,"text":459,"correct":21},"标高投影图",{"id":461,"libraryId":5,"type":9,"typeLabel":15,"stem":462,"options":463,"answer":19,"analysis":32},857239,"BIM可以让业主()地了解投标单位对投标项目主要施工的控制方法、施工安排是否均衡、总体计划是否基本合理等，从而对投标单位的施工经验和实力作出有效评估。",[464,466,468,470],{"key":19,"text":465,"correct":28},"直观",{"key":23,"text":467,"correct":21},"深刻",{"key":26,"text":469,"correct":21},"全面",{"key":30,"text":471,"correct":21},"自动",{"id":473,"libraryId":5,"type":9,"typeLabel":15,"stem":474,"options":475,"answer":30,"analysis":32},857240,"下列运维协调功能中，可处理地下污水管的相对位置，便于管网维修的功能是()。",[476,478,480,482],{"key":19,"text":477,"correct":21},"节能减排管理协调",{"key":23,"text":479,"correct":21},"应急管理协调",{"key":26,"text":481,"correct":21},"空间协调管理",{"key":30,"text":483,"correct":28},"隐蔽工程协调管理",{"id":485,"libraryId":5,"type":9,"typeLabel":15,"stem":486,"options":487,"answer":23,"analysis":32},857241,"BIM工程师在设计方面的应用主要体现在()。",[488,490,492,494],{"key":19,"text":489,"correct":21},"利用模型进行直观的“预施工”，预知施工难点，更大程度消除施工的不确定性和不可预见性",{"key":23,"text":491,"correct":28},"可视化的设计会审和专业协同，基于三维模型的设计信息传递和交换将更加直观、有效，有利于各方沟通和理解",{"key":26,"text":493,"correct":21},"为构件加工提供最详细的加工详图，减少现场作业、保证质量",{"key":30,"text":495,"correct":21},"BIM模型的可视化能够让投标方深入了解招标方所提出的条件，避免信息孤岛的产生，保障数据的共同共享以及可追溯性",{"id":497,"libraryId":5,"type":9,"typeLabel":15,"stem":498,"options":499,"answer":26,"analysis":32},857242,"下列选项中，关于BIM技术中Clashrendition的说法不正确的是()。",[500,502,504,506],{"key":19,"text":501,"correct":21},"Clashrendition即碰撞再现",{"key":23,"text":503,"correct":21},"专门用于空间协调",{"key":26,"text":505,"correct":28},"专门用于实施机电管道的碰撞检查",{"key":30,"text":507,"correct":21},"可实现碰撞检查和碰撞规避",{"id":509,"libraryId":5,"type":9,"typeLabel":15,"stem":510,"options":511,"answer":19,"analysis":32},857243,"用BIM三维图、CAD图纸或者表格下料单等书面形式做好用料交底，防止班组“长料短用、整料零用”，做到物尽其用，减少浪费及边角料，把材料消耗降到最低限度。以上描述体现的是BIM技术在()中的应用。",[512,514,516,518],{"key":19,"text":513,"correct":28},"物料管理",{"key":23,"text":515,"correct":21},"质量管理",{"key":26,"text":517,"correct":21},"进度管理",{"key":30,"text":519,"correct":21},"场地管理",{"id":521,"libraryId":5,"type":9,"typeLabel":15,"stem":522,"options":523,"answer":30,"analysis":32},857244,"平台软件一般为基于()的应用软件，能够支持工程项目各参与方及各专业工作人员之间通过网络高效地共享信息。",[524,526,528,530],{"key":19,"text":525,"correct":21},"GIS",{"key":23,"text":527,"correct":21},"AR",{"key":26,"text":529,"correct":21},"VR",{"key":30,"text":531,"correct":28},"Web",{"id":533,"libraryId":5,"type":9,"typeLabel":15,"stem":534,"options":535,"answer":30,"analysis":32},857245,"根据《建筑工程设计信息模型分类和编码标准》，下列选项最先归档的是()。",[536,538,540,542],{"key":19,"text":537,"correct":21},"10－39.01.0O＋12－33.13.00",{"key":23,"text":539,"correct":21},"11－1324.11＜13－15.11.34.11",{"key":26,"text":541,"correct":21},"10－53.01.03",{"key":30,"text":543,"correct":28},"15－26.00.00\u002F15－27.90.00",{"id":545,"libraryId":5,"type":9,"typeLabel":15,"stem":546,"options":547,"answer":23,"analysis":32},857246,"()主要内容包括：风管、给排水及冷热媒管道、阀门、消音器等平面位置，标注管径、断面尺寸、管道及各种设备的定位尺寸等。",[548,550,552,554],{"key":19,"text":549,"correct":21},"采暖平面图",{"key":23,"text":551,"correct":28},"空调机房平面图",{"key":26,"text":553,"correct":21},"通风、除尘平面图",{"key":30,"text":555,"correct":21},"冷冻机房平面图",{"id":557,"libraryId":5,"type":9,"typeLabel":15,"stem":558,"options":559,"answer":26,"analysis":32},857247,"下列选项中不属于BIM模型生产工程师岗位职责的是()。",[560,562,564,566],{"key":19,"text":561,"correct":21},"场地模型建立",{"key":23,"text":563,"correct":21},"钢结构模型建立",{"key":26,"text":565,"correct":28},"工程量估算",{"key":30,"text":567,"correct":21},"机电模型建立",{"id":569,"libraryId":5,"type":9,"typeLabel":15,"stem":570,"options":571,"answer":30,"analysis":32},857248,"土建工程中常用的投影图不包括()。",[572,573,574,575],{"key":19,"text":455,"correct":21},{"key":23,"text":459,"correct":21},{"key":26,"text":453,"correct":21},{"key":30,"text":576,"correct":28},"斜视图",{"id":578,"libraryId":5,"type":9,"typeLabel":15,"stem":579,"options":580,"answer":26,"analysis":32},857249,"施工进度模拟即通过将BIM与()相连接，把空间信息与时间信息整合在一个可视的4D模型中，反映整个施工过程。",[581,583,585,587],{"key":19,"text":582,"correct":21},"施工图纸",{"key":23,"text":584,"correct":21},"深化设计",{"key":26,"text":586,"correct":28},"施工进度",{"key":30,"text":588,"correct":21},"位置信息",{"id":590,"libraryId":5,"type":9,"typeLabel":15,"stem":591,"options":592,"answer":30,"analysis":32},857250,"下列选项中，对设备可操作性可视化的描述中不正确的是()。",[593,595,597,599],{"key":19,"text":594,"correct":21},"可对建筑设备空间是否合理进行提前检验",{"key":23,"text":596,"correct":21},"可以通过制作工作机和设置不同施工路线，对建筑设备的位置不断做出调整",{"key":26,"text":598,"correct":21},"可以通过多种设备安装动画，优化设备的安装位置和工序",{"key":30,"text":600,"correct":28},"可进行机电管线碰撞检查",{"id":602,"libraryId":5,"type":9,"typeLabel":15,"stem":603,"options":604,"answer":23,"analysis":32},857251,"根据《建筑工程设计信息模型分类和编码标准》，()用于将单个表格中的编码联合在一起，定义一个表内的连续编码段落，以表示适合对象的分类区间。",[605,607,609,611],{"key":19,"text":606,"correct":21},"“＋”",{"key":23,"text":608,"correct":28},"“\u002F”",{"key":26,"text":610,"correct":21},"“＜”",{"key":30,"text":612,"correct":21},"“＞”",[614,617,620,623,626,628],{"id":9,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":9},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":627,"name":6,"category":7,"favorite":8},534,{"id":629,"name":630,"category":7,"favorite":8},536,"安全人A证"]