[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858525":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858525,535,2,"多选题","下列选项关于BIM相关术语说法不正确的是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","IFC是一个包含各种建设项目在各个阶段所需要的全部信息的一种基于对象的、公开的标准文件交换格式",false,{"key":16,"text":17,"correct":18},"B","LOD表示BIM等级从不同阶段到完全合作阶段的过程，是BIM成熟度的划分",true,{"key":20,"text":21,"correct":18},"C","Levels描述了一个BIM模型构件单元从最低级的近似概念化的程度发展到最高级的演示级精度的步骤",{"key":23,"text":24,"correct":14},"D","LoI即LevelofInformation，它定义了每个阶段需要细节的多少",{"key":26,"text":27,"correct":14},"E","OpenBIM即一种在建筑设计、施工和运营中基于公共标准和公共工作流程的开放资源的工作方式","BC","Levels表示BIM等级从不同阶段到完全合作阶段的过程，是BIM成熟度的划分。LOD描述了一个BIM模型构件单元从最低级的近似概念化的程度发展到最高级的演示级精度的步骤。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]