[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858520":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858520,535,2,"多选题","LOD描述了一个BIM模型构件单元从最低级的近似概念化的程度发展到最高级的演示级精度的步骤，它的定义主要可用于()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","确定模型阶段输出结果",true,{"key":16,"text":17,"correct":18},"B","确定模型存储空间",false,{"key":20,"text":21,"correct":14},"C","分配建模任务",{"key":23,"text":24,"correct":18},"D","确定各参与方的合作协同程度",{"key":26,"text":27,"correct":18},"E","确定模型数据交换格式","AC","确定各参与方的合作协同程度的levels。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]