[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858516":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858516,535,2,"多选题","BIM技术在项目施工阶段中的应用不包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","虚拟建造管理",false,{"key":16,"text":17,"correct":14},"B","预制加工管理",{"key":19,"text":20,"correct":21},"C","资产设备维护管理",true,{"key":23,"text":24,"correct":14},"D","绿色施工管理",{"key":26,"text":27,"correct":21},"E","建筑性能分析","CE","资产设备维护管理是属于BIM技术在项目运维阶段中的应用；建筑性能分析属于BIM技术在项目设计阶段中的应用。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]