[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858515":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858515,535,2,"多选题","下列BIM应用管理模式中适用于工程全过程阶段的有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","设计主导管理模式",true,{"key":16,"text":17,"correct":14},"B","施工主导管理模式",{"key":19,"text":20,"correct":14},"C","业主自主管理模式",{"key":22,"text":23,"correct":14},"D","咨询辅助管理模式",{"key":25,"text":26,"correct":27},"E","监理主导管理模式",false,"ABCD","见四种BIM应用管理模式特征对比表。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]