[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858514":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858514,535,2,"多选题","工序质量控制就是对工序活动条件即工序活动投入的质量和工序活动效果的质量及分项工程质量的控制。利用BIM技术进行工序质量控制主要体现在()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","利用BIM技术能够更好地确定工序质量控制工作计划",true,{"key":16,"text":17,"correct":14},"B","利用BIM技术主动控制工序活动条件的质量",{"key":19,"text":20,"correct":14},"C","能够及时检验工序活动效果的质量",{"key":22,"text":23,"correct":14},"D","利用BIM技术设置工序质量控制点(工序管理点)，实行重点控制",{"key":25,"text":26,"correct":27},"E","对工序的绿色性能进行分析",false,"ABCD","对工序的绿色性能进行分析属于BIM技术在绿色施工中的应用，不属于质量控制。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]