[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858507":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858507,535,2,"多选题","根据工程项目信息使用的有关资料，下列选项中属于美国标准和技术研究院划分的生命周期阶段的是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","招投标阶段",false,{"key":16,"text":17,"correct":18},"B","规划和计划阶段",true,{"key":20,"text":21,"correct":18},"C","施工阶段",{"key":23,"text":24,"correct":18},"D","项目运营和维护阶段",{"key":26,"text":27,"correct":18},"E","清理阶段","BCDE","美国标准和技术研究院根据工程项目信息使用的有关资料把项目的生命周期划分为如下6个阶段：规划和计划阶段、设计阶段、施工阶段、项目交付和试运行阶段、项目运营和维护阶段、清理阶段。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]