[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858495":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858495,535,2,"多选题","BIM深化设计协调管理流程是()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","建立规范文件存储体系",true,{"key":16,"text":17,"correct":14},"B","定制统一的标准",{"key":19,"text":20,"correct":21},"C","工程量预算管理",false,{"key":23,"text":24,"correct":14},"D","深化设计变更管理",{"key":26,"text":27,"correct":14},"E","竣工模型管理","ABDE","BIM深化协调管理流程：建立规范文件存储体系、定制统一的标准、深化设计变更管理、竣工模型管理。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]