[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858494":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858494,535,2,"多选题","下面关于基于BIM技术的成本管理说法正确的是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","BIM技术提高了成本核算和成本分析的工作效率",true,{"key":16,"text":17,"correct":18},"B","在成本核算中，通过构件和模型的自动关联，实现以模型为载体，各构件价格和工程量数据相对应，从而实现实际收入的快速核算",false,{"key":20,"text":21,"correct":14},"C","BIM技术提高了成本分析的工作效率。",{"key":23,"text":24,"correct":14},"D","通过模型工程量、分包报量与合同价格的对应，实现项目实际成本和预算成本的快速核算",{"key":26,"text":27,"correct":14},"E","在成本核算的基础上，BIM系统可按时间对比分析整个项目的核算成本情况","ACDE","在成本核算中，通过清单和模型的自动关联，实现以模型为载体，各构件价格和工程量数据相对应，从而实现实际收入的快速核算。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]