[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858491":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858491,535,2,"多选题","下面关于精细化桩基施工过程的应用过程说法正确的是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","现在BIM还不能实现桩基的实际工程量统计",false,{"key":16,"text":17,"correct":18},"B","每个基础桩、护坡桩，具有唯一的编码，根据编码可以查询桩施工过程中关键进度、质量的数据",true,{"key":20,"text":21,"correct":14},"C","BIM模型还不能支持按照施工部署进行区域划分",{"key":23,"text":24,"correct":18},"D","BIM模型能支持按照现场协调安排进行区域划分",{"key":26,"text":27,"correct":18},"E","可以通过移动端设备，跟踪每根桩的施工开始、施工完成时间","BDE","见精细化桩基施工过程的应用过程。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]