[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858480":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858480,535,2,"多选题","下面关于传统项目管理说法正确的是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","二维CAD设计图形象差，二维图纸不方便各专业之间的协调沟通，传统方法不.利于规范化和精细化管理",true,{"key":16,"text":17,"correct":18},"B","我国项目管理还处于中级水平，参与各方对此没有足够的重视",false,{"key":20,"text":21,"correct":14},"C","精细化管理需要细化到不同时间、构件、工序等，难以实现过程管理",{"key":23,"text":24,"correct":14},"D","项目全寿命没有系统管理，各阶段分离脱节",{"key":26,"text":27,"correct":14},"E","由多个不同的参与方从各自角度出发，对项目进行管理，会影响相互间的信息交流，也影响了项目全寿命的信息管理","ACDE","见传统项目管理存在的不足。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]