[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858479":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858479,535,2,"多选题","下面关于BIM结构设计基本流程说法正确的是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","不能使用BIM软件直接创建BIM结构设计模型",false,{"key":16,"text":17,"correct":18},"B","可以从已有的BIM建筑设计模型提取结构设计模型",true,{"key":20,"text":21,"correct":18},"C","可以利用相关技术对BIM结构模型进行同步修改，使BIM结构模型和结构计算模型保持一致",{"key":23,"text":24,"correct":18},"D","可以提取结构构件工程量",{"key":26,"text":27,"correct":18},"E","可以绘制局部三维节点图","BCDE","见BIM结构设计基本流程。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]