[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858468":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858468,535,2,"多选题","结构初步设计模型的模型信息主要包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","结构荷载信息",false,{"key":16,"text":17,"correct":18},"B","构件配筋信息",true,{"key":20,"text":21,"correct":18},"C","挠度、裂缝的控制信息",{"key":23,"text":24,"correct":18},"D","配筋率信息",{"key":26,"text":27,"correct":18},"E","结构整体控制指标","BCDE","结构初步设计模型的模型信息包括：构件配筋信息、挠度、裂缝的控制信息，配筋率信息、对采用新技术、新材料的做法说明及构造要求、初步计算后，结构设计规范中要求的结构整体控制指标完成情况。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]