[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858467":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858467,535,2,"多选题","土方开挖工程量的计算流程有()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","依据地勘报告，创建地下土模型",true,{"key":16,"text":17,"correct":14},"B","根据施工方案建立土方开挖的BIM模型",{"key":19,"text":20,"correct":14},"C","将土方开挖的BIM模型与地质土层模型进行对比",{"key":22,"text":23,"correct":14},"D","生成各土层开挖土方量清单表",{"key":25,"text":26,"correct":27},"E","生成造价清单表",false,"ABCD","土方开挖工程量的计算流程：依据地勘报告，创建地下土模型、根据施工方案建立土方开挖的BIM模型、将土方开挖的BIM模型与地质土层模型进行对比、生成各土层开挖土方量清单表。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]