[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858460":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858460,535,2,"多选题","下面关于BIM设计工作流程与传统设计流程的变化说法正确的是？()",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","基于BIM，结构专业在方案阶段可以实质性介入",true,{"key":16,"text":17,"correct":18},"B","在传统的方案设计阶段，结构专业不用对建筑专业提出的资料进行确认并反馈",false,{"key":20,"text":21,"correct":18},"C","基于BIM传统设计流程中设计准备环节还是不可提前实现",{"key":23,"text":24,"correct":14},"D","基于BIM，综合协调工作将贯穿于整个设计流程",{"key":26,"text":27,"correct":14},"E","基于BIM，支持模型与图档的关联修改与自动更新","ADE","见BIM从工作流程角度的变化。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]