[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858451":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},858451,535,2,"多选题","在施工管理阶段，业主单位更多的是施工阶段的风险控制，可能的风险包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","安全风险",true,{"key":16,"text":17,"correct":14},"B","进度风险",{"key":19,"text":20,"correct":14},"C","质量风险",{"key":22,"text":23,"correct":14},"D","投资风险","ABCD","在施工管理阶段，业主单位更多的是施工阶段的风险控制，包含安全风险、进度风险、质量风险和投资风险等。",{"id":6,"name":27,"category":28,"favorite":29},"BIM工程师","建筑工程",0]