[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858440":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},858440,535,2,"多选题","供货单位的项目管理工作涉及哪些阶段？( )",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","施工阶段",true,{"key":16,"text":17,"correct":14},"B","设计准备阶段",{"key":19,"text":20,"correct":14},"C","设计阶段",{"key":22,"text":23,"correct":14},"D","动用前准备阶段",{"key":25,"text":26,"correct":14},"E","保修期","ABCDE","供货单位的项目管理工作主要在施工阶段进行，但它也涉及设计准备阶段、设计阶段、动用前准备阶段和保修期。",{"id":6,"name":30,"category":31,"favorite":32},"BIM工程师","建筑工程",0]