[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858438":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},858438,535,2,"多选题","根据评价时间不同，后评价又可以分为()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","跟踪评价",true,{"key":16,"text":17,"correct":14},"B","实施效果评价",{"key":19,"text":20,"correct":21},"C","进度评价",false,{"key":23,"text":24,"correct":14},"D","影响评价","ABD","根据评价时间不同，后评价又可以分为跟踪评价、实施效果评价和影响评价。",{"id":6,"name":28,"category":29,"favorite":30},"BIM工程师","建筑工程",0]