[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858424":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858424,535,2,"多选题","设计方项目管理的目标包括设计的()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","成本目标",true,{"key":16,"text":17,"correct":14},"B","进度目标",{"key":19,"text":20,"correct":14},"C","质量目标",{"key":22,"text":23,"correct":24},"D","维护目标",false,{"key":26,"text":27,"correct":14},"E","项目建设的投资目标","ABCE","设计方项目管理的目标包括设计的成本目标、进度目标、质量目标和项目建设的投资目标。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]