[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858415":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858415,535,2,"多选题","项目的实施、跟踪是一个控制过程，用于衡量项目是否向目标方向进展，监控偏离计划的偏差，在项目的()限制因素之间进行平衡。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","范围",true,{"key":16,"text":17,"correct":18},"B","进度",false,{"key":20,"text":21,"correct":14},"C","时间",{"key":23,"text":24,"correct":14},"D","成本",{"key":26,"text":27,"correct":18},"E","质量","ACD","项目的实施、跟踪是一个控制过程，用于衡量项目是否向目标方向进展，监控偏离计划的偏差，在项目的范围、时间和成本三大限制因素之间进行平衡，采取纠正措施使进度与计划相匹配。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]