[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858413":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858413,535,2,"多选题","项目管理中的“三管”主要指的是()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","合同管理",true,{"key":16,"text":17,"correct":18},"B","质量管理",false,{"key":20,"text":21,"correct":14},"C","职业健康安全与环境管理",{"key":23,"text":24,"correct":14},"D","信息管理",{"key":26,"text":27,"correct":18},"E","进度管理","ACD","建筑全生命周期管理的常用术语，B、E选项是属于“三控”的内容。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]