[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858397":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858397,535,2,"多选题","根据评价时间不同，项目后评价可以分为()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","效益评价",false,{"key":16,"text":17,"correct":18},"B","跟踪评价",true,{"key":20,"text":21,"correct":14},"C","实施进度评价",{"key":23,"text":24,"correct":18},"D","实施效果评价",{"key":26,"text":27,"correct":18},"E","影响评价","BDE","根据评价时间不同，后评价又可以分为跟踪评价、实施效果评价和影响评价。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]