[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858383":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},858383,535,2,"多选题","设计阶段是工程项目建设过程中非常重要的一个阶段，此阶段一般分为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","概念设计",false,{"key":16,"text":17,"correct":18},"B","方案设计",true,{"key":20,"text":21,"correct":18},"C","初步设计",{"key":23,"text":24,"correct":18},"D","施工图设计","BCD","设计阶段是工程项目建设过程中非常重要的一个阶段，在这个阶段中将决策整个项目实施方案，确定整个项目信息的组成，对工程招标、设备采购、施工管理、运维等后续阶段具有决定性影响，此阶段一般分为方案设计、初步设计和施工图设计三个阶段。",{"id":6,"name":28,"category":29,"favorite":30},"BIM工程师","建筑工程",0]