[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858376":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858376,535,2,"多选题","根据评价时间不同，后评价又可以分为( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","项目跟踪评价",true,{"key":16,"text":17,"correct":14},"B","项目实施效果评价",{"key":19,"text":20,"correct":14},"C","项目影响评价",{"key":22,"text":23,"correct":24},"D","项目管理人员评价",false,{"key":26,"text":27,"correct":24},"E","项目经济效益评价","ABC","D、E选项是属于按评价内容划分的类型。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]