[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-858249":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},858249,535,2,"多选题","在优化总体规划中，管理者需要确定出建设项目方案在满足类型、质量、功能等要求下是否具有()，而BIM能够帮助提高其论证结果的准确性和可靠性。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","技术可行性",true,{"key":16,"text":17,"correct":14},"B","经济可行性",{"key":19,"text":20,"correct":21},"C","人员可行性",false,{"key":23,"text":24,"correct":21},"D","管理制度可行性",{"key":26,"text":27,"correct":21},"E","机械辅助设备可行性","AB","优化总体规划主要体现在对技术及经济的可行性验证。",{"id":6,"name":31,"category":32,"favorite":33},"BIM工程师","建筑工程",0]